ID |
Date |
Author |
Category |
Subject |
Text |
 |
54
|
Fri Apr 1 15:52:23 2022 |
Rodolfo | Detectors | UV PMT South | The "Solar Blind PMT" labeled as "PMT South"
has been installed by Simon and Max in the
gas target chamber on a CaF Viewport. The |
|
53
|
Fri Apr 1 15:27:00 2022 |
Rodolfo | Detectors | Nitrogen for UV-PMTs | There was a question concerning the nitrogen
we use to rinse the "Solar Blind PMTs".
|
 |
52
|
Fri Apr 1 11:19:57 2022 |
Rui-Jiu Chen | DAQ | S.M.A.R.T check on NTCAP | S.M.A.R.T. check has been done on NTCAP on
March 28th. All 12 hard disk drivers are
normal. |
|
51
|
Fri Apr 1 11:00:41 2022 |
Rui-Jiu Chen | DAQ | Start NTCAP | Start taking data with NTCAP.
Carrier Frequency: 245MHz
IQ rate:5 MSamples/s
|
|
50
|
Fri Apr 1 02:29:40 2022 |
Carsten | | ESR Cooler crashed | ESR cooler crashed. We could not restart the
cooler. Since we had several other problems,
we stop now. |
|
49
|
Fri Apr 1 01:57:12 2022 |
Kristian | DAQ | Timing | with bunched primary beam (bunching frequency
1.94070 MHz) we have strong PMT (mid) and
particle detector signal. Time between both |
  |
47
|
Fri Apr 1 00:27:27 2022 |
Carsten | | Settings Particle Detectors /Tests with primary beam | All the beam settings will be given in a separate
post.
|
|
46
|
Thu Mar 31 22:41:35 2022 |
Kristian | Calibration | HV divider | We noticed a difference in the electron cooler
high voltage:
|
|
45
|
Thu Mar 31 22:19:14 2022 |
Kristian | DAQ | How To Start MBS | (MBS server should be running at the LXG1297
machine. If not you will get an error message.
Then start the server - last command in console)
|
|
44
|
Thu Mar 31 20:07:47 2022 |
Shahab | DAQ | Schottky Display in AP Messhütte (or anywhere else) | [B]UPDATE: 16.05.2022[/B]
[I]Please use ATPPC029 instead of ATPPC019 |
|
43
|
Thu Mar 31 17:56:32 2022 |
Konstantin | DAQ | Photodiode test signal | We used a signal generator to provide a 4MHz
dummy-RF signal. This was divided by a factor
of 2 for laser-"bunch" synchronization and |
|
42
|
Thu Mar 31 15:53:50 2022 |
Konstantin | Detectors | Control software for XUV and copper mirror detector | > Attached you find a manual for the software
used to control the movement of the XUV detector
and the copper mirror detector.
|
|
41
|
Thu Mar 31 13:28:17 2022 |
Jan Glorius | DAQ | DAQ-2 cabling docu | newest version V2 - valid since Mo 04.April
2022 |
  |
40
|
Thu Mar 31 11:49:54 2022 |
Konstantin | Detectors | HV-Supply of particle detectors | We cross-checked the cabeling of the particle
detectors north and south. Particle detector
south is connected to channel [B]HV5[/B] |
|
39
|
Wed Mar 30 09:27:15 2022 |
Rodolfo | Accelerator | Issue? Scrapers at E-Cooler | Carsten* forwarded me an E-Mail from Markus
yesterday. "Betreff: Scraper im ESR Elektronenkühler"
|
|
38
|
Tue Mar 29 21:37:13 2022 |
Rodolfo | Laser | Pump Laser | The gold "reflectors and end plates" of our
pump laser (Quanta-Ray PRO) have been exchanged
by new ones.
|
|
37
|
Tue Mar 29 12:47:26 2022 |
Ken Ueberholz | | Parameter setting for XUV and copper mirror detector | Some Default Settings for the XUV
Detector. The copper
mirror should always move fully in.
|
|
36
|
Tue Mar 29 12:01:08 2022 |
Rodolfo | Laser | Laser targets | I have installed two targets* (size: 2 inches)
to monitor the position of the laser beam.
|
  |
35
|
Fri Mar 25 14:31:24 2022 |
Rodolfo | Laser | Photodiode signal SO in the Messhütte | Measured at the Panel "Messhütte - Laserhütte",
BNC "Fast PD / SO".
|
|
34
|
Thu Mar 24 17:10:33 2022 |
Carsten | DAQ | DAQ / MBS VUPROM TDC buffer errors | VUPROM TDC buffer errors potentially due to
long TDC common Stop gate (>1ms from div
200).
|
|