HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+, Page 4 of 12  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  177   Sat Apr 9 04:01:35 2022 Carsten 2nd DAQSwitched the CAEN TDC back on and changed
the threshoolds for the ADC to: 
  
  176   Sat Apr 9 03:57:10 2022 CarstenAcceleratorNew Cooler voltage after the crash of the coolerAfter the restart of the cooler the Ohmlabs
divider showed a voltage 16V lower than before.
This could also be seen as a slight shift
  
  175   Sat Apr 9 03:46:31 2022 CarstenAcceleratorSlits in TE lineChanged GTEDSAH Rechts to 10mm   
  174   Sat Apr 9 03:27:47 2022 PatrickDAQLaser scanningDAQ1: lxg1927:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
LMD file name DAQ1:229Thor
 does_not_write_data_to_file.png 
  173   Sat Apr 9 02:55:38 2022 CarstenAcceleratorKühlerausfall und Gründe dazuWir hatten heute Abend eine Kühlerausfall,
der uns mehrere Stunden beschäftigt hat,
weil  gem. Anzeige in Device Control kein
  
  172   Fri Apr 8 23:56:07 2022 PatrickDAQDAQ improvementAs requested in ID:146 and ID:147, the laserscan
tab was improved:
[LIST]
  
  171   Fri Apr 8 22:26:44 2022 PatrickDAQSpike in all detectorsIn the previous shift, there was a spike in
all detectors in the same scan step. Apparently,
this was NOT a resonance since in the next
  
  170   Fri Apr 8 17:57:45 2022 KonstantinDAQLaser scanning

[TABLE border="1"]
 Artifacts_in_PMT_MiddleAndNorth.png 
  169   Fri Apr 8 17:44:25 2022 KonstantinCalibrationFinal TimingWe measured the timing for the laser bunch
synchronization. A summary is given below.
  
  168   Fri Apr 8 15:45:24 2022 YL Spectrum manipulation 5See attached  IMG_3027.JPG 
  167   Fri Apr 8 15:42:20 2022 YuriAcceleratorSlits in the TE lineAt around 15:00, The slits in the TE line
were changed to :
TE4DS5HL -12 mm -> -20 mm
  
  166   Fri Apr 8 15:39:36 2022 allRunsfirst data after timing set upstarted taking data again

started at 15:40  
  
  165   Fri Apr 8 14:46:02 2022 Danyal & Sebastian & Volker & KenDetectorshigh dark countrate Cu PMT solvedThe problem - "discovered" by Volker and Ken
- of the high dark countrate of the Cu PMT
has been solved. 
 IMG_20220408_082804.jpgIMG_20220408_083031.jpg 
  164   Fri Apr 8 14:43:50 2022 WilfriedDAQlaser timing - Q-switch startbelow are my notes concerning laser timing
/ Q-switch start
 IMG_20220408_143753_resized_20220408_023840170.jpg 
  163   Fri Apr 8 14:14:28 2022 KristianDAQDelay of bunch RFThe bunch HF is now fed through a delay to
shift the stop trigger relative to the PMT
signal. The delay generator is placed directly
  
  162   Fri Apr 8 14:12:57 2022 morning shiftDAQtiming for h=1The timing for h=1 has been set up 

The time window is now twice as large as
 2022-04-08_timing_h1_final.png 
  161   Fri Apr 8 12:04:13 2022 RaganRunsNTCAP startedNTCAP is started for the data taking.

Carrier Frequency: 242.02 M
 IMG_0947.jpg 
  160   Fri Apr 8 11:16:57 2022 KristianLaserWavemeterWe changed the fiber to the wavemeter. The
third fiber worked best and we could operate
the WM at low exposure times, i.e., below
 Wavemeter.PNGWavemeter2.PNG 
  159   Fri Apr 8 11:02:04 2022 DW, YL, RSS, SL Change h=2 to h=1After changing to h=1
The frequency manipulation #5: f=242.021487MHz
(124th harmonic) [no bunching]
  
  158   Fri Apr 8 10:44:55 2022 Ragan, Yuri, Danyal, SergeyRunsNTCAP stoppedNTCAP is stopped. Sergey will now set an ion
bunch instead of two in the ESR.
  
ELOG V3.1.5-fc6679b