Thu Apr 7 11:11:31 2022, Max, Sebastian, Laser, dye changed, pulse energy measurements
|
We changed the dye at 10am.
We increased the pump power for the dye Laser to 480mJ (before 450mJ). New calibration factor is 29 for Quanta Ray monitor signal.
|
Thu Apr 7 10:10:31 2022, Ragan, Yuri, Danyal, Accelerator, Problem in UNILAC
|
The power supply of the UNILAC magnet is broken. The repair will take up to 6-7 hours. |
Thu Apr 7 09:58:55 2022, Ragan, Yuri, Danyal, Accelerator, Kicker problem solved
|
The kicker problem is solved and the beam is back in the ESR. |
Thu Apr 7 09:23:18 2022, Sebastian, DAQ, DAQ1 & DAQ2 - 1kHz and delayed cs removed
|
Questionable 1kHz and delayed common stop signals has been removed.
These two cablings were for some previous tests. |
Thu Apr 7 08:43:19 2022, Danyal, Yuri, Ragan, Accelerator, again no injection in ESR - ESR kicker problem
|
we had no injections in the ESR again
it turned out that the injection kicker of the ESR has a problem |
Thu Apr 7 08:14:03 2022, Yuri & Danyal, General, 229Th89+ line in Schottky
|
GLOBAL calculations for the "content" of the Th line in the Schottky spectrum
(380 MeV/u exit energy, equilibrium charge state distribution)
|
Thu Apr 7 07:40:09 2022, Danyal, Max, Sebastian, DAQ, No beam and DAQs crashed
|
since shortly after 7 AM we have no beam in the ESR
(reason unclear)
|
Thu Apr 7 05:55:17 2022, Ken Ueberholz, Detectors, XUV-Detector Mesytec crash
|
When the XUV-detector has to shut down unexpectedly, it can happen that the Mesytek power supply crashes and can't be
communicated with. If this happens the Mesytec PS needs to be restarted from hand inside of the ESR. This can be done by
restarting the crate located at the bottom of the XUV-detector.
|
Thu Apr 7 05:44:40 2022, Pierre-Michel, Ragan, DAQ, NTCAP settings
|
Carrier Frequency: 244M
IQ Rate: 10M
reference Level: -30
|
Thu Apr 7 05:23:50 2022, Patrick, DAQ, How To Start MBS for DAQ2 (Carstens DAQ)
|
(MBS server should be running at the LXG0155 machine. If not you will get an error message. Then start the server - last command in console)
Just enter the following commands in the console of any PC
|
Thu Apr 7 04:48:58 2022, , , ToDo's for 07.04.
|
Some ToDo's for the next shift:
- Work on Laser stabilisation 2nd stage in the ESR
- Mesytec power supply of the xuv-detector crashed and needs to be restarted in the ESR. Simply turning it the crate off and on again)!!
|
Thu Apr 7 04:10:18 2022, Ken Ueberholz, DAQ, Corrected cabling DAQ 2
|
A lot of cables were wrongly or not
connected to the DAQ 2.
|
Thu Apr 7 03:44:21 2022, Patrick, DAQ, Measurement procedure
|
[U][B]Measurement procedure[/B][/U]
|
Thu Apr 7 03:09:36 2022, Carsten, DAQ, NTCAP running since 02:40
|
|
Thu Apr 7 03:06:15 2022, Patrick, DAQ, DAQ file sizes
|
The file sizes of DAQ1 (229Thor) and DAQ2 (229Th, "Carstens DAQ") are different.
During 20min of laser scanning DAQ1 saves 4 files while DAQ2 saves 2 files which was 3.3 GB and 2 GB, respecively.
[B]The file sizes of DAQ2 should always be greater than those of DAQ1, because of extra ADC data![/B]
|
Thu Apr 7 02:32:29 2022, all on shift, Runs, First Scans 322-320nm
|
Laser scanning from 322-320 steps 0.01nm/s
DAQ1: lxg1927:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
|
Thu Apr 7 01:19:05 2022, Patrick, Laser, Laser scanning
|
We did some laser scans. The wavemeter shows spikes during scans. This may be just while the frequency changes. See picture. |
Thu Apr 7 00:36:36 2022, Uwe, DAQ, Threshholds and shaping Mesytec for ADC
|
|
Thu Apr 7 00:15:11 2022, Patrick, Laser, Laser timing adjusted
|
We have adjusted the laser timing using PMT-middle. Bunching freq. is 3.90362 MHz.
PD NO: 7.79
|
Wed Apr 6 22:29:55 2022, Patrick, Accelerator, ECooler voltages
|
ECooler voltages:
[B]06.04:[/B]
|