ID |
Date |
Author |
Category |
Subject |
Text |
|
150
|
Wed Jun 30 12:35:53 2021 |
Rui-Jiu Chen | Analysis | Change reference level to -20dBm. Turn of amplifier. | SC_2021-06-30_12_35_52
IQ_2021-06-30_12_35_43
Reference level=-20dBm |
|
78
|
Sat May 8 18:35:25 2021 |
Rui-Jiu Chen | DAQ | Change reference level to -10dBm | The beam in ESR is 78Kr36+@476 MeV/u.
Start a new run:
SC_2021-05-08_18-25-52
|
|
212
|
Fri Jul 2 14:18:04 2021 |
Pavlos, Alexandre | Runs | Change of the measurment to 72Br | Both resonators will now be retuned to look
for the isomeric state in 72Br.
|
|
210
|
Fri Jul 2 13:37:00 2021 |
Pavlos, Alexandre | DAQ | Change of the measurement time from 10s to 20s | Last files with the measurement time of 10s
for the two resonators are:
|
|
185
|
Thu Jul 1 23:38:55 2021 |
IK, KK | Runs | Change of gas bottle | The gas bottle has been changed and the beam
is back. |
|
105
|
Sun May 9 13:53:07 2021 |
Yuri, Wolfram, Andrew, Liliana | Calibration | Change of energy: Back as before | After looking at the spectrum it was concluded
that the same isotopes, and no more, could
be identified.
|
|
19
|
Thu May 6 22:05:30 2021 |
Helmut | Accelerator | Beamline and ESR data sets for 72Ge setting | parammodi exports, E-SIS = 441.0 MeV/u with
Be-1840 mg/cm² target in, isoc. ESR, at least
we see fragments |
|
38
|
Fri May 7 09:36:32 2021 |
Ragan, Andrew, Yuri | General | Beam stop at 0928, adjust scope | It was requested from the SIS to stop the
beam at 09:28
Yuri is adjusting the scope in order to avoid |
|
234
|
Sat Jul 3 08:12:22 2021 |
Dima, Yuri | General | Beam stop | We stopped the beam at 08:10
The latest recorded tdms files:
|
|
25
|
Fri May 7 02:01:08 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | Accelerator | Beam issues for short duration | RFQ fall-out (HKR working on it...)
Beam stop time: 01.58am
|
|
61
|
Fri May 7 23:08:44 2021 |
Michael, Kanika | Accelerator | Beam issues for short duration | The beam was lost for a few minutes from 23:01
to 23:06. It is back now. |
|
92
|
Sun May 9 04:15:50 2021 |
Michele, Jacobus, Shahab | Runs | Beam issues for short duration |
ESR warning (colour red in the panel)
|
|
47
|
Fri May 7 14:33:23 2021 |
Andrew Ragan Yuri | General | Beam is back | |
|
124
|
Mon May 10 01:01:59 2021 |
Kanika, Alex, RuiJiu | General | Beam is back | The issue has been resolved and the beam is
back since 00:56. |
|
165
|
Thu Jul 1 04:15:54 2021 |
David, Liliana | General | Beam intensity | From 4:05 to 4:15 beam intensity was 1/2 as
before. |
|
166
|
Thu Jul 1 07:28:55 2021 |
Jan, Akash | Accelerator | Beam intensity | Intensity went up from 5e8 to 1e9 extracted
particles from SIS. |
|
75
|
Sat May 8 15:18:23 2021 |
Michael, Wolfram, Yuri | General | Beam Settings changing | Beam settings are being changed back to 78Kr
beam at 467 Mev/u. |
|
10
|
Thu May 6 14:28:32 2021 |
Helmut Weick | Calibration | Be target thickness calibration -> 1839 mg/cm^2 | Injection was optimized before with Cu-40
mg/cm^2 stripper.
This reduces energy of 78Kr from 370 MeV/u |
|
45
|
Fri May 7 12:37:35 2021 |
Ragan, Andrew, Yuri, Alex | General | Back with beam | We are back with the beam in the ESR since
12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
|
|
103
|
Sun May 9 12:53:01 2021 |
Desislava Kalaydjieva, Taka Yamaguchi | Analysis | Analysis, Morning shift, 9 May | For the whole morning shift there were no
significant changes in the spectra.
|
9x |