| ID | 
Date | 
Author | 
Category | 
Subject  | 
Text | 
  | 
| 
  4  
 | 
Tue May  4 17:54:08 2021 | 
Helmut Weick | Simulations | updated LISE file | This file really has the optics like used 
in the last ESR experiments.
 
Now the transmission is also a little bit | 
    | 
| 
  52  
 | 
Fri May  7 17:12:52 2021 | 
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | trigger time back to 50% | changed trigger time back to 50%
 
 
last file with 1% trigger: 
 | 
   | 
| 
  136  
 | 
Mon Jun 28 18:32:49 2021 | 
Ruijiu, Shahab | DAQ | trigger signal connected to NTCAP and analyzers |   | 
    | 
| 
  143  
 | 
Wed Jun 30 00:12:55 2021 | 
Rui-Jiu Chen | Analysis | the ID of 72Ge setting |   | 
       | 
| 
  168  
 | 
Thu Jul  1 15:25:42 2021 | 
Rui-Jiu Chen | DAQ | template of NTCAP shift | Please check following two parameters every 
two hours into make sure the NTCAP is running 
well: 
 | 
   | 
| 
  114  
 | 
Sun May  9 21:29:26 2021 | 
Helmut, Wolfram, Yuri | Accelerator | target TE3UF shift | We see a very strong line at the left end 
of spectrum, stronger than all other lines.
 
When we shift the target TE3UF_H from -35mm | 
   | 
| 
  84  
 | 
Sat May  8 22:06:36 2021 | 
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | stopped data taking with the high resolution | last file names with this setting:
 
 
245: 2021.05.08.20.42.03.743.tiq
 | 
   | 
| 
  109  
 | 
Sun May  9 18:41:33 2021 | 
Rodostina, Oliver, Wolfram, Helmut, Yuri, Shahab | Runs | stopped data taking for energy change | last recorded filename:
 
 
E143-245MHz-2021.05.09.17.38.44.410.tiq
 | 
   | 
| 
  218  
 | 
Fri Jul  2 19:57:12 2021 | 
Shahab, Yuri, Wolfram, Liliana | Runs | stop DAQ  | At 19:56 the DAQ is stopped. 
 
The plan is to go back to the setting for 
Se. 
 | 
   | 
| 
  60  
 | 
Fri May  7 22:48:33 2021 | 
Chris | General | still running... | In anticipation of the imminent shift change, 
a snapshot of how things look. | 
     | 
| 
  146  
 | 
Wed Jun 30 02:12:46 2021 | 
Shahab | Runs | still no beam in ESR: quadrupole magnets are down | still no beam in ESR: quadrupole magnets are 
down | 
   | 
| 
  26  
 | 
Fri May  7 03:33:11 2021 | 
Liliana, Akash, Wolfram, Helmut, Shahab | General | status | At the moment we see a second peak to the 
left of each intense line. 
 
The distance between the main peak and the | 
   | 
| 
  216  
 | 
Fri Jul  2 17:31:04 2021 | 
Liliana | General | status | at 17:20 intensity was suddenly reduced. 
 
Operators checked. Intensity was a bit low 
and fluctuating for a while (8e8 to 1e9)
 | 
   | 
| 
  81  
 | 
Sat May  8 21:10:24 2021 | 
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | started data taking with high resolution | after optimizing the scrapers we have reached 
the highest possible resolution in the isochronous 
mode.
 | 
     | 
| 
  139  
 | 
Tue Jun 29 20:40:55 2021 | 
Rui-Jiu Chen | DAQ | start NTCAP | Carrier Frequency:245MHz.
 
IQ rate 20MSamples/s
 
Reference level:-90 dBm
 | 
   | 
| 
  184  
 | 
Thu Jul  1 23:07:47 2021 | 
IK, KK | Runs | source | 
 
The change of the source happens now | 
   | 
| 
  183  
 | 
Thu Jul  1 21:35:32 2021 | 
Shahab | Runs | some pics after 15dB amplification on 410 |   | 
     | 
| 
  153  
 | 
Wed Jun 30 13:57:14 2021 | 
Yuri, Sergey | Accelerator | sextupoles + scraper positions | After setting up on 70Se
 
Sextupoles were adjusted to optimize the 
resolution of the 70Se peak. Set values are | 
     | 
| 
  173  
 | 
Thu Jul  1 18:07:10 2021 | 
Shahab | Runs | settings of the analyzers after changing the trigger position |   | 
     | 
| 
  85  
 | 
Sun May  9 01:19:47 2021 | 
Helmut, Sergey | Accelerator | scraper optmisation for 72Ge | To improve the isochronicity still in the 
72Ge setting sextupoles and scrapers wer 
varies successfully.
 | 
    |