HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  nuclear two-photon decay, Page 1 of 12  Not logged in ELOG logo
ID Date Author Categoryup Subject Text Attachments
  16   Thu May 6 21:26:02 2021 Yuri et al.AcceleratorEnergiesgamma_t = 1.3955
Br(72Ge) corresponds to 6.79575 Tm
E (Kr) at Br(72Ge) = 392.9 MeV/u
  
  17   Thu May 6 21:36:04 2021 Regina + Markus + YuriAcceleratorCooler CurveFinal cooler curve, Isochronous 78Kr  cc_1.jpg 
  19   Thu May 6 22:05:30 2021 HelmutAcceleratorBeamline and ESR data sets for 72Ge settingparammodi exports, E-SIS = 441.0 MeV/u with
Be-1840 mg/cm² target in, isoc. ESR, at least
we see fragments
 2021-05-06_22-07-09_SIS18_FAST_20210506_ESR_78KR32.C1.txt2021-05-06_22-07-52_ESR_EXP21_06_ISO_78Kr_05May21.C1.txt 
  25   Fri May 7 02:01:08 2021 Liliana, Akash, Wolfram, Helmut, ShahabAcceleratorBeam issues for short durationRFQ fall-out (HKR working on it...)

Beam stop time: 01.58am
  
  27   Fri May 7 03:44:55 2021 Helmut WeickAcceleratorscraper optimisationOpened TE4 slits again to +/-10mm.

Then we tried different scrapers:
  
  41   Fri May 7 09:58:04 2021 YuriAcceleratorSetting up KO extraction for CavesSIS optimisation requires us to stop. Only
sporadic shots.
  
  42   Fri May 7 10:05:06 2021 YuriAcceleratorE02DS3HG does not driveE02DS3HG stays at -35 mm and does not react   
  43   Fri May 7 10:46:40 2021 YuriAcceleratorGE02DS3HGThe scraper is blocked at -10 mm and -unfortunately-
blocks the beam in the ESR. Uli Popp is taking
care.
  
  46   Fri May 7 14:06:02 2021 YuriAcceleratorSIS kicker failure    
  48   Fri May 7 16:09:50 2021 YuriAcceleratorStop, change of sextuple settings    
  59   Fri May 7 22:00:36 2021 ChrisAcceleratorbrief beam lossBrief interruption in beam, ~21:42-21:51.   
  61   Fri May 7 23:08:44 2021 Michael, KanikaAcceleratorBeam issues for short durationThe beam was lost for a few minutes from 23:01
to 23:06. It is back now.
  
  65   Sat May 8 01:43:23 2021 Helmut WeickAccelerator70Se settingIf gamma_t = 1.3955 Tm stays, we will need
Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be
  
  72   Sat May 8 08:44:32 2021 Akash, Nic, Jelena, ZsoltAcceleratorNo Beam!08.43am: Beam stopped. HKR looking into it.
Reason: they mentioned they don't know yet!
  
  74   Sat May 8 11:42:21 2021 YuriAcceleratorKPsEO1KP03 was on = -44.9 A
E01KP05 was off, now is on = 3.67 A
The beam is on the right frequency, but the
  
  76   Sat May 8 16:08:58 2021 Helmut WeickAcceleratorbeam position of Kr before ESRChecked beam positions in beamline before
ESR,
they all look the same as before, with direct
 TE3DG3-Kr.JPGTE3DGC-Kr.JPGTE5-grids-Kr.jpg 
  80   Sat May 8 21:08:13 2021 Helmut, Sergey, Shahab, Wolfram, YuriAcceleratoroptimisation of sextuplesThe optimisation of sextuples is finished.
Record a few files.
  
  83   Sat May 8 21:42:51 2021 AllAccelerator Set up for 52MnDetails will follow
E(Mn) = 368.41 MeV/u
  
  85   Sun May 9 01:19:47 2021 Helmut, SergeyAcceleratorscraper optmisation for 72GeTo improve the isochronicity still in the
72Ge setting sextupoles and scrapers wer
varies successfully.
 IMG_20210508_210509.jpg 
  86   Sun May 9 01:49:25 2021 Helmut, Sergey, YuriAcceleratorchange to 52Mn
It was done in steps:
isochronous 52Mn should come at Brho = 6.28239
  
ELOG V3.1.5-fc6679b