ID |
Date |
Author |
Category |
Subject |
Text |
|
83
|
Sat May 8 21:42:51 2021 |
All | Accelerator | Set up for 52Mn | Details will follow
E(Mn) = 368.41 MeV/u |
|
202
|
Fri Jul 2 07:31:44 2021 |
The remote Canadian eager beavers (Iris and Guy) | Analysis | 00h to 05h Summed Spectra | Using the scripts I posted previously, I summed
5.5 hours of data from midnight to 5:30 July
2nd CEST.
|
|
151
|
Wed Jun 30 13:04:40 2021 |
Shahab | Runs | 245 Amplifier on | turned on extra 20dB amplifier for the 245
Resonator around 12:32 |
|
31
|
Fri May 7 04:26:54 2021 |
Shahab | Runs | 245 MHz resonator extra 20dB gain off | made sure that the extra 20dB amplifier is
off. |
|
65
|
Sat May 8 01:43:23 2021 |
Helmut Weick | Accelerator | 70Se setting | If gamma_t = 1.3955 Tm stays, we will need
Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be |
|
147
|
Wed Jun 30 08:59:37 2021 |
Yuri | Accelerator | 70Se setting | X(9Be)=1.815 g/cm2 (adjusted in primary beam
setting)
|
|
220
|
Fri Jul 2 20:33:44 2021 |
Yuri | Accelerator | 70Se setting with closed scrapers | We tune back to 70Se.
The scrapers stay closed at EEXDS2HA=0 mm,
EEXDS1HG=+5 mm
|
|
140
|
Tue Jun 29 21:10:30 2021 |
Shahab | Runs | 72-Ge setting | the new setting is roughly 400 khz lower in
frequency.
Previous beam time Ge was on 243.100 now |
|
36
|
Fri May 7 08:04:22 2021 |
Carlo Bruno, Desislava Kalaydjieva | Analysis | 7:00 - 14:00 analysis shift | (See
https://triumfoffice365-my.sharepoint.com/:w:/g/personal/dillmann_triumf_ca/Eb_LCp7yTx5Bgc8TO8khJmEBWeS-ycdPRnG02wQout-fgQ?rtime=3n3A3xMR2Ug
for remote shifter instructions. To be updated/corrected |
15x |
180
|
Thu Jul 1 20:48:58 2021 |
Shahab Andrew Nic | DAQ | Acquisition started | 15dB amplifier on 410MHz |
|
179
|
Thu Jul 1 20:35:21 2021 |
Andrew Nic Shahab | DAQ | Acquisition stopped | Checking if signal can be further amplified
|
|
103
|
Sun May 9 12:53:01 2021 |
Desislava Kalaydjieva, Taka Yamaguchi | Analysis | Analysis, Morning shift, 9 May | For the whole morning shift there were no
significant changes in the spectra.
|
9x |
45
|
Fri May 7 12:37:35 2021 |
Ragan, Andrew, Yuri, Alex | General | Back with beam | We are back with the beam in the ESR since
12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
|
|
10
|
Thu May 6 14:28:32 2021 |
Helmut Weick | Calibration | Be target thickness calibration -> 1839 mg/cm^2 | Injection was optimized before with Cu-40
mg/cm^2 stripper.
This reduces energy of 78Kr from 370 MeV/u |
|
75
|
Sat May 8 15:18:23 2021 |
Michael, Wolfram, Yuri | General | Beam Settings changing | Beam settings are being changed back to 78Kr
beam at 467 Mev/u. |
|
165
|
Thu Jul 1 04:15:54 2021 |
David, Liliana | General | Beam intensity | From 4:05 to 4:15 beam intensity was 1/2 as
before. |
|
166
|
Thu Jul 1 07:28:55 2021 |
Jan, Akash | Accelerator | Beam intensity | Intensity went up from 5e8 to 1e9 extracted
particles from SIS. |
|
47
|
Fri May 7 14:33:23 2021 |
Andrew Ragan Yuri | General | Beam is back | |
|
124
|
Mon May 10 01:01:59 2021 |
Kanika, Alex, RuiJiu | General | Beam is back | The issue has been resolved and the beam is
back since 00:56. |
|
25
|
Fri May 7 02:01:08 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | Accelerator | Beam issues for short duration | RFQ fall-out (HKR working on it...)
Beam stop time: 01.58am
|
|