HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  nuclear two-photon decay, Page 9 of 12  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  73   Sat May 8 10:51:41 2021 Akash, Nic, Jelena, ZsoltCalibrationESR settings seem differentSettings don't look the same...so we are not
yet writing files unless sure.
 Screenshot_2021-05-08_at_10.50.23.png 
  72   Sat May 8 08:44:32 2021 Akash, Nic, Jelena, ZsoltAcceleratorNo Beam!08.43am: Beam stopped. HKR looking into it.
Reason: they mentioned they don't know yet!
  
  71   Sat May 8 08:16:08 2021 Akash, Nic, Jelena, ZsoltAnalysisNight shift analysis(Jelena has analysed these data files)

E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5)
 16x 
  70   Sat May 8 08:12:02 2021 Akash, Nic, Jelena, ZsoltGeneralSIS, ESR time structure changesThe structure of SIS extraction seems to have
changed a little...also for ESR injection.
 Screenshot_2021-05-08_at_08.08.14.png 
  69   Sat May 8 07:34:08 2021 Akash, Nic, Jelena, ZsoltGeneralZoom has its own mindZoom kicked us all out... we managed to get
back in...screen sharing is back on.
  
  68   Sat May 8 07:14:00 2021 Akash, Nic, Jelena, ZsoltGeneralMorning shift entryThings look ok. No settings have been changed...

Analysis attempts are going on...
  
  67   Sat May 8 03:08:57 2021 Rui-Jiu ChenDAQChange reference level to -50dBmStart a new run. The data of new run is in
:
SC_2021-05-07_17-39-16
  
  66   Sat May 8 03:05:42 2021 Rui-Jiu ChenDAQChange reference level to -60dBmStart a new run. The data of new run is in
:
SC_2021-05-07_17-33-29
  
  65   Sat May 8 01:43:23 2021 Helmut WeickAccelerator70Se settingIf gamma_t = 1.3955 Tm stays, we will need
Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be
  
  64   Sat May 8 01:33:25 2021 Helmut WeickSimulationsfrequency list for 70Se settingEXCEL table with all possible fragments injected
into ESR.
The path length in ESR, gamma_t and harmonic
 freq-lines-70Se.JPGfrag-freq-list.xlsx 
  63   Sat May 8 01:06:19 2021 Philipp, MartaGeneralScreenshotThe signal of the transformer on the lower
right panel is not really beam related. It
is mostly noise. Changes are not so expected
 Screenshot_2021-05-08_at_00.58.16.png 
  62   Sat May 8 00:38:55 2021 Philipp, MartaGeneralScreenshot   Screenshot_2021-05-08_at_00.32.16.png 
  61   Fri May 7 23:08:44 2021 Michael, KanikaAcceleratorBeam issues for short durationThe beam was lost for a few minutes from 23:01
to 23:06. It is back now.
  
  60   Fri May 7 22:48:33 2021 ChrisGeneralstill running...In anticipation of the imminent shift change,
a snapshot of how things look.
 E143-245MHz-2021.05.07.21.46.10.889.tiq.pngZoom_screenshot.PNG 
  59   Fri May 7 22:00:36 2021 ChrisAcceleratorbrief beam lossBrief interruption in beam, ~21:42-21:51.   
  58   Fri May 7 20:34:27 2021 Kanika, Michael, ShahabRunsback to 15 sec recordingnow we are going back to 15 sec operation.
Cave M (bio) operation is over
  
  57   Fri May 7 20:28:32 2021 Kanika, Michael, ShahabAnalysisSome pictures from the 410 detectorsome pics.  9x 
  56   Fri May 7 19:56:10 2021 Kanika, Michael, ShahabRunsZOOM session restartrestart zoom session   
  55   Fri May 7 18:43:13 2021 Kanika, Michael, ShahabRunscave M experiment needs more spillsour pattern causes beam loss while scanning
the biological probes in the Cave M bio experiment.
They loose every other spill due to high
 rep.jpg 
  54   Fri May 7 18:08:35 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunsgoing back to the original energygoing back to the original energy 441 MeV/u

last filenames with the previous energy:
  
ELOG V3.1.5-fc6679b