Entry  Mon May 16 18:01:23 2022, mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu , Runs, runs afternoon/night shift 16.05 
These are the runs after the septum was repaired on 16.05.

[TABLE border="1"]
Entry  Mon May 9 09:43:08 2022, Zoran, Accelerator, ESR Beam 
The main control room started setting up the Bi beam this morning, but quickly stopped in order to solve some problems around the UNILAC. Therefore we 
should not plan to receive ions earlier than late in the evening on Monday, or probably Tuesday during the day.
Entry  Mon May 9 19:56:41 2022, Zoran, Accelerator, status Monday evening 
The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport and
the devices for the 
ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment before
    Reply  Tue May 10 09:05:19 2022, Zoran, Accelerator, status Monday evening 22-05-09_200006_20220509_170137_tcl1024_dcct.png
> The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport 
and the devices for the 
> ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment
    Reply  Wed May 11 08:01:44 2022, Zoran, Runs, Start laser scanning 
[quote]
[I]Questions:[/I]
[B]There are many other masses/isotopes/etc. visible in the Shottky spectrum. Is this wanted?[/B]
Entry  Wed May 11 20:47:54 2022, Zoran, Accelerator, beam lost in SIS 
For some reason the beam was lost in the SIS soon after taking the ESR beam this evening, reason unknown. Solved by sending teh full context to the SIS
machine and having 
operators to manually set the voltage of the SIS extraction kicker. Afterwards a slight readjustment of the transfer beamline was necessary:
    Reply  Fri May 13 08:32:41 2022, Zoran, Accelerator, NO BEAM UNTIL TOMORROW MORNING 
> The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
> Maybe tomorrow in the morning briefing there will be more information about this.
Entry  Tue May 17 06:37:28 2022, YL, KM, Accelerator, Reduced beam intensity 
The resonance in 209Bi has been seen during the night.
Reducing the intensity by a factor~1000, to simulate 208Bi conditions
Running low intensity since ~6:15-6:20
Entry  Wed May 11 18:00:40 2022, Wilfried, Phillip, Max, Detectors, double PD NO peak problem solved 
In entry 36 one finds an additional PD NO peak around bin 100.
This was caused by signal reflection in the cable.
The problem was solved by adjusting the CFD threshold from 10 to 30.
Entry  Wed May 11 18:13:04 2022, Wilfried, Phillip, Max, DAQ, laser scan/step complete 
The scaler channel laser scan complete and laser step complete is interchanged in go4. Carsten will fix this on the software side.
Additionally the laser scan complete signal was not there in the first place. After checking the signal on multiple points, the signal was suddenly back
in the DAQ.
Entry  Mon May 9 11:45:57 2022, Wilfried, Jon, Sebastian, General, HV Divider position & DMM calibration DMM_calibration.PNGdividerPosition.PNGdividerPosition1.PNG
We performed an autocalibration (attached picture 1) of the Keysight 34465A DMM (TUD Keysight).

The position and the "cabling" to the cooler platform was also adjusted (picture 2,3).
Entry  Mon May 30 21:52:08 2022, Wilfried, Danyal, David, Rodolfo, General, Position of T-Scrapers MRC_208Bi_30-05-2022-10Uhr.png
We have determined the position of the H-like 208Bi ion beam using the T-Scrapers. The position actually did not change in comparison to the position of
H-like 209Bi.
Entry  Mon May 9 19:05:17 2022, Wilfried, DAQ, Q-Switch signals + 0.5 ms and +1 ms in VUPROM 
We have generated two additional signals which are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
Q-Switch + 1.0 ms --> channel 10
Entry  Fri May 6 16:29:03 2022, Simon, Patrick, Detectors, PMT preparation 
We changed PMT north and PMT south and tested them at 1500 V.

Both new PMTs are broadband.
Entry  Thu May 12 10:10:35 2022, Simon, Christopher, Wilfried, Sebastian, DAQ, 1ms gated PMT north / middle added to DAQ 
We added on DAQ1 and DAQ2 1ms gated PMT North and PMT Middle signals.
Now we "supress" the signal by a factor of ~30.
Entry  Thu May 12 11:31:11 2022, Simon, Christopher, Shahab, Wilfried, Sebastian, Ragan, General, Runs morning shift 

[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after orbit change| cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) |
Entry  Wed May 11 06:41:32 2022, Simon, Christopher, Shahab, Runs, shifts 
new shift started.
Entry  Wed May 11 06:47:58 2022, Simon, Christopher, Shahab, Runs, restart laser scan 

[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after orbit change| cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) |
Entry  Wed May 11 07:28:39 2022, Simon, Christopher, Shahab, General, DAQ Loop for shifters 
Procedure:

- Scanning phase ends (on LabView wait until "Idle Status" blinks. it will show e.g. 8 loops and 44 scans)
Entry  Tue May 10 11:59:45 2022, Simon, Christopher, Kristian, Sebastian, Laser, Labview VI checkups 
The lower limit (to position) of the Cobra control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 the "to position" has to be 601.735.