  Dielectronic recombination-assisted laser spectroscopy, Page 4 of 6  Not logged in ELOG logo
Entry  Fri May 6 16:41:57 2022, Patrick, Rodolfo, Laser, Wavemeter Screenshot_(4).pngBi2022_laserscan_test.PNG
We coupled the laser through a multi-mode fiber into the wavemeter.
With the main amplifier enabled, we got enough power behind the fiber (0.5 - 1.5 mW) to use the wavemeter with 34 ms exposure time (1s / 30Hz to prevent
jumps in the wavemeter readout).
Entry  Mon May 30 02:33:45 2022, Patrick, MBS Max, DAQ, MBS procedure 
It is possible to keep go4 running now. Summary of the procedure:

DAC1: open file lxg1297:/data.local2/208Bi/208Bi -auto -rfio
Entry  Mon May 16 22:57:40 2022, Patrick, Kristian, David, Ruijiu , Detectors, Switched off nitrogen 2022-05-16_PMTs_after_nitrogen_off.png
Background counts with nitrogen and air.
Less multiphoton events with air (see pictures, histogram extended to 30 with nitrogen).
Entry  Tue May 17 00:44:01 2022, Patrick, Kristian, DAQ, Changed PMT North CFD channel 
In run 8134 - 8135 PMT North showed a super high background rate. After the scan we checked the signal cables.

Incoming signal was still good until CFD. We changed channel from 2 to 12. New threshold is 36, was 10.
Entry  Tue May 31 03:18:52 2022, Patrick, Konstantin, Laser, Laser timing 
The final timings are (in bins +-1):

PD NO: 103
Entry  Wed May 11 23:34:39 2022, Patrick, Carsten, Detectors, Particle Detectors / Scraper positions 
Voltages of particle detectors off.

Scraper positions:
Entry  Thu May 12 03:25:37 2022, Patrick, DAQ, Laser scan complete signal off 
As in ID:46, the 'laser scan complete' again is not coming in.
It is not very useful to repeatedly fix cable contact problems.
Therefore, Carsten is adding a 'number of steps' line to the config file to "repeat" the x-axis.
Entry  Mon May 16 22:19:54 2022, Patrick, DAQ, Keep go4 running (in theory), MBS 
To accumulate more data into the opened go4, do not restart MBS, but just

sto ac
Entry  Thu May 12 16:35:17 2022, Max, Wilfried, Zoran, Accelerator, NO BEAM UNTIL TOMORROW MORNING 
The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
Maybe tomorrow in the morning briefing there will be more information about this.
Entry  Wed May 11 22:19:17 2022, Max, Wilfried, Volker, Laser, laser bunch timing timing10_5_22.png
We overlapped the laser and ion bunch in the time domain. The delay has to be set on the module above the laser and NOT in the ESR Messhütte!

The values are:
Entry  Wed May 11 22:45:22 2022, Max, Wilfried, Patrick, General, scanning wavelength 
The scan parameters for the next shift are:

in COBRACONTROL:
Entry  Mon May 16 19:20:55 2022, Max, Wilfried, Analysis, start go4 before laser scan 
It is necessary to start go4 before you start the laser scan. Otherwise you get an offset in the laser Step plots.
Entry  Tue May 31 21:58:55 2022, Max, Rodolfo, Laser, MRC Settings for 209Bi  MRC_209Bi_31-05-2022_2157.png
We have change the laser settings for the spectroscopy of 209Bi. 

We have now T-scraped the laser beam to the old position of the ion beam. The settings for the MRC system are shown in the screenshot below. 
Entry  Mon May 30 02:12:20 2022, Max, Patrick, ~Konstantin, Ragan, Ken, Runs, runs night shift 30.05. 2022-05-30_resonance_10_loops.png48_AM.png
These are the first runs of the substitute beamtime.

[TABLE border="1"]
Entry  Mon May 30 00:56:33 2022, Max, Patrick, Laser, Beam overlap 2022-05-30_laser_beam.png2022-05-30_beamstab_settings.png
The ion beam positions are (+- 1mm):

Entry  Thu May 12 15:34:47 2022, Max, Kristian, Sebastian, DAQ, laser scan, laser step and laser busy checked 
We checked all three signals in the Messhütte. Laser scan and laser step are OK.
The Laser busy signal is for large increments (0.1nm) also fine. For short increments like our usual 0.005nm increment the signal is irregularly.
Likely the laser busy status is too short.
Entry  Mon May 16 17:38:38 2022, Max, Danyal, Wilfried, Rodolfo, General, laser bunch timing timing1605.png
We overlapped the laser and ion bunch in the time domain. 
Therefore we delayed the bunching HF in order to see the PMT signal between bin 10 and 22. Before the signal Peak was in channel ~145-5 and difficult to
gate on.
Entry  Tue May 31 17:22:09 2022, Max, Carsten, Danyal, Rodolfo, Wilfried, General, change E-cooler current I_e = 50 mA 

At 17:15 we changed again the E-cooler current I_e = 50 mA  
(4 laser scan loops per injection) 
Entry  Tue May 31 15:19:58 2022, Max, Carsten, Danyal, General, scans for different E-cool currents 

until 15:15 we have measured with I_e = 100 mA (3 loops per file) 
E_cool HV = 225255 V 
Entry  Thu May 12 15:50:33 2022, Max, Accelerator, No ESR beam 
Since 13:30 we have no beam in the ESR. There is a problem with the ESR septum.
The magnets department is investigating.