ID |
Date |
Author |
Category |
Subject |
Text |
 |
27
|
Tue May 10 11:59:45 2022 |
Simon, Christopher, Kristian, Sebastian | Laser | Labview VI checkups | The lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 |
|
28
|
Tue May 10 15:26:35 2022 |
Rodolfo, Max | Laser | Laser stabilisation running | It is now possible to stabilize and move the
laser with both stages.
|
 |
35
|
Wed May 11 01:09:07 2022 |
Patrick, Sebastian, Volker, Guy | Laser | Beam overlap | We overlapped the laser with the ion beam.
The ion beam positions are:
|
 |
36
|
Wed May 11 03:10:55 2022 |
Patrick, Sebastian, Volker, Guy | Laser | Laser - bunch timing | We added the delay and gate generator in between
the bunch trigger and the CFD to move the
timing of the PMT middle signal relative |
|
44
|
Wed May 11 14:59:01 2022 |
Rodolfo | Laser | Laser status | I have measured the output energy of the laser
system. All values in [mJ] and over 500 laser-pulses
average
|
|
49
|
Wed May 11 22:19:17 2022 |
Max, Wilfried, Volker | Laser | laser bunch timing | We overlapped the laser and ion bunch in the
time domain. The delay has to be set on the
module above the laser and NOT in the ESR |
|
62
|
Thu May 12 15:21:23 2022 |
Sebastian, Simon | Laser | Flash lamps changed | We (Sebastian and I) changed the flash lamps
of the Quanta Ray Laser and measured the
output energy of the laser system afterwards |
|
70
|
Mon May 16 15:57:37 2022 |
Rodolfo | Laser | Wavemeter calibration | I have calibrated our Wavemeter WS7 using
the temperature stabilized He-Ne Laser (SIOS
EN60 825-1:2014). In the screenshots below |
 |
75
|
Mon May 16 21:08:48 2022 |
Rodolfo & Max | Laser | Laser power | We checked the energy of the laser and optimized
it a bit
|
|
82
|
Fri May 27 14:57:23 2022 |
Rodolfo | Laser | Laser Energy | I have started up the laser system (Q-Ray
& Cobra) again. Here some parameters*:
|
|
84
|
Mon May 30 00:56:33 2022 |
Max, Patrick | Laser | Beam overlap | The ion beam positions are (+- 1mm):
|
 |
92
|
Mon May 30 19:42:20 2022 |
Rodolfo & Kristian | Laser | Changing laser wavelength | We have changed the laser wavelength, e.g.
the dye for the Cobra to Fluorescein 27.
|
|
97
|
Tue May 31 03:18:52 2022 |
Patrick, Konstantin | Laser | Laser timing | The final timings are (in bins +-1):
PD NO: 103
|
|
104
|
Tue May 31 21:58:55 2022 |
Max, Rodolfo | Laser | MRC Settings for 209Bi | We have change the laser settings for the
spectroscopy of 209Bi.
|
|
108
|
Wed Jun 1 17:20:04 2022 |
Rodolfo | Laser | HeNe @ WS7 | |
|
111
|
Fri Jan 13 17:05:22 2023 |
Rodolfo | Laser | Testing WS6 | Testing the new Wavemeter (HighFinesse, WS6,
SN3950) with the QRAY laser light @ 532 nm.
Multimode fiber von High Finesse:FC/PC S |
|
112
|
Wed Jan 18 13:02:12 2023 |
Rodolfo | Laser | Testing WS6 with Cobra | Testing the WS6 (S.N. 3950) together with
the Cobra.
|
|
113
|
Tue Jun 6 09:33:00 2023 |
Rodolfo | Laser | Fiber coupler | Cobra's new fiber-coupling unit for wavelength
reading. |
|
17
|
Mon May 9 11:45:57 2022 |
Wilfried, Jon, Sebastian | General | HV Divider position & DMM calibration | We performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
|
  |
34
|
Tue May 10 23:53:42 2022 |
Rodolfo | General | shift change | The night shift took over. They are trying
now to overlap the ion and laser beams. |
|