HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Dielectronic recombination-assisted laser spectroscopy, Page 5 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Categorydown Subject Text Attachments
  52   Wed May 11 23:36:24 2022 Ruijiu Chen, Carsten, GuyDAQstart NTCAP.Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
  
  54   Thu May 12 03:25:37 2022 PatrickDAQLaser scan complete signal offAs in ID:46, the 'laser scan complete' again
is not coming in.
It is not very useful to repeatedly fix cable
  
  55   Thu May 12 10:10:35 2022 Simon, Christopher, Wilfried, SebastianDAQ1ms gated PMT north / middle added to DAQWe added on DAQ1 and DAQ2 1ms gated PMT North
and PMT Middle signals.
Now we "supress" the signal by a factor of
  
  61   Thu May 12 14:04:09 2022 KonstantinDAQGo4 Laserstep histograms adaptedIn order to correctly display the gated PMT
signals [I]PMT Middle[/I] and [I]PMT North[/I]
some modifications in the Go4 code were necessary.
 Go4Modifications.PNG 
  63   Thu May 12 15:34:47 2022 Max, Kristian, SebastianDAQlaser scan, laser step and laser busy checkedWe checked all three signals in the Messhütte.
Laser scan and laser step are OK.
The Laser busy signal is for large increments
  
  76   Mon May 16 22:19:54 2022 PatrickDAQKeep go4 running (in theory), MBSTo accumulate more data into the opened go4,
do not restart MBS, but just
  
  78   Tue May 17 00:44:01 2022 Patrick, KristianDAQChanged PMT North CFD channelIn run 8134 - 8135 PMT North showed a super
high background rate. After the scan we checked
the signal cables.
  
  81   Fri May 27 10:39:53 2022 KristianDAQPMT North noiseDuring the last run, PMT North showed some
weird noise.
 IMG_20220527_095501.jpg 
  87   Mon May 30 02:33:45 2022 Patrick, MBS MaxDAQMBS procedureIt is possible to keep go4 running now. Summary
of the procedure:
  
  106   Wed Jun 1 00:16:02 2022 Konstantin, SimonDAQTiming 209Bi thick targetTiming for the final measurements on 209Bi
was determined for the new frequency 1.93777MHz.
Peak positions are
 Timing_209Bi_final.png 
  100   Tue May 31 19:32:56 2022 Carsten, Wilfried, MaxCalibrationelectron cooler calibration voltage - frequency[TABLE border="1"]
SetVoltage (DeltaU) | MeasVoltage | freq
| Current 
  
  107   Wed Jun 1 08:39:50 2022 Kristian, KonstantinCalibrationWavemeter readingWe recorded files with high wavemeter readout
rate and saved it at the atplaser network
drive (Q:) - Bismuth - wavemeter folder.
  
  71   Mon May 16 17:15:56 2022 CarstenAnalysisDAQ /Analysis - shift of peaks in the accumulated spectra, changes in codeAfter a phone call with Wilfried I implemented
an offset to all hit channels of the stacked
/ accumulated spectra where one chekcs the
  
  74   Mon May 16 19:20:55 2022 Max, WilfriedAnalysisstart go4 before laser scanIt is necessary to start go4 before you start
the laser scan. Otherwise you get an offset
in the laser Step plots.
  
  83   Fri May 27 20:39:50 2022 CarstenAnalysisShort Manual for updated Go4 DAQ (version 2022_05_27)Short descriptions of the most recent version
of the GO4 code is attached. I will install
the corresponding vesion early on sunday.
 Short_Introduction_to_the_208Bi_Go4_Analysis.pdfShort_Introduction_to_the_208Bi_Go4_Analysis.odt 
  110   Thu Jun 30 11:12:21 2022 CarstenAnalysisUpdated Go4 Analysis with small Bugfix (PMTOverWavelength SPectra)Here attached is a more recentversion of the
Go4 Analysis Code with some smaller bugfixes.
For adaequate *.C files please have alook
 208Bi_20220629_fix.tgz 
  16   Mon May 9 09:43:08 2022 ZoranAcceleratorESR BeamThe main control room started setting up the
Bi beam this morning, but quickly stopped
in order to solve some problems around the
  
  22   Mon May 9 17:16:34 2022 CarstenAcceleratorImportant: New ESR pattern - requies action for XUV detector in/outThe ESR pattern is enhanced compared to the
thorium experiment by additional machines
that can be  used for cooling/waiting in
  
  24   Mon May 9 19:56:41 2022 ZoranAcceleratorstatus Monday eveningThe main control room is setting up the SIS
for extraction. At the moment there are 2.5E8
particles in the SIS. Later they will check
  
  25   Tue May 10 09:05:19 2022 ZoranAcceleratorstatus Monday evening> The main control room is setting up the
SIS for extraction. At the moment there are
2.5E8 particles in the SIS. Later they will
 22-05-09_200006_20220509_170137_tcl1024_dcct.png 
ELOG V3.1.5-fc6679b