HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Dielectronic recombination-assisted laser spectroscopy, Page 5 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon May 30 02:12:20 2022, Max, Patrick, ~Konstantin, Ragan, Ken, Runs, runs night shift 30.05. 2022-05-30_resonance_10_loops.png48_AM.png
These are the first runs of the substitute beamtime.

[TABLE border="1"]
Entry  Mon May 30 02:33:45 2022, Patrick, MBS Max, DAQ, MBS procedure 
It is possible to keep go4 running now. Summary of the procedure:

DAC1: open file lxg1297:/data.local2/208Bi/208Bi -auto -rfio
Entry  Mon May 30 08:35:41 2022, Kristian, Simon, Ken, Ragan, Detectors, Changed PMT North 
We did not see any signal at PMT North which was the narrowband PMT. Changed it to the old solar blind PMT. Now we see the resonance. It is about 3 times
larger as PMT middle, most likely because of the larger window. CFD threshold was set. I also increased the CFD threshold for PMT middle slightly.
Entry  Mon May 30 09:28:43 2022, Ken, Kristian, Simon, Ragan, Detectors, XUV-Detector 
9:27 XUV-Detector is running again.

-5V cathode, 8A main coil, 2.4A sec.coil
Entry  Mon May 30 16:17:39 2022, Kristian, David, Wilfried, Carsten, Danyal, Rodolfo, Runs, Afternoon shift 30.05 
These are the first runs after changing to the thick stripper foil.

[TABLE border="1"]
Entry  Mon May 30 19:00:19 2022, Carsten, General, Scraper Settings and Parameters for the last measrements with thick target screenshot-2022-05-30_19-12-151030168345517073342_(002).png
old Bunch frequency: 1.98777 MHz

Positions PL devices:
Entry  Mon May 30 19:42:20 2022, Rodolfo & Kristian, Laser, Changing laser wavelength 
We have changed the laser wavelength, e.g. the dye for the Cobra to Fluorescein 27. 

We get about 84 mJ out the main amplifier @ 548 nm.
Entry  Mon May 30 20:58:26 2022, Carsten, Accelerator, New Settings for 208Bi Beam  
Old SetParameters.C and old SetConditions.C were saved as SetParameters_209.C and SetConditions_209.C

The ion beam settings were changed to 208Bi82+:
Entry  Mon May 30 21:52:08 2022, Wilfried, Danyal, David, Rodolfo, General, Position of T-Scrapers MRC_208Bi_30-05-2022-10Uhr.png
We have determined the position of the H-like 208Bi ion beam using the T-Scrapers. The position actually did not change in comparison to the position of
H-like 209Bi.
Entry  Mon May 30 23:18:06 2022, Carsten, Rodolfo, Konstantin, Patrick, Ragan, Ken, Kristian, Max, Danyal, Runs, Runs shifts 31.05. 2022-05-31_particles.png
These are the first runs with 208Bi.

[TABLE border="1"]
Entry  Tue May 31 03:18:52 2022, Patrick, Konstantin, Laser, Laser timing 
The final timings are (in bins +-1):

PD NO: 103
Entry  Tue May 31 15:19:58 2022, Max, Carsten, Danyal, General, scans for different E-cool currents 

until 15:15 we have measured with I_e = 100 mA (3 loops per file) 
E_cool HV = 225255 V 
Entry  Tue May 31 17:22:09 2022, Max, Carsten, Danyal, Rodolfo, Wilfried, General, change E-cooler current I_e = 50 mA 

At 17:15 we changed again the E-cooler current I_e = 50 mA  
(4 laser scan loops per injection) 
Entry  Tue May 31 19:32:56 2022, Carsten, Wilfried, Max, Calibration, electron cooler calibration voltage - frequency 
[TABLE border="1"]
SetVoltage (DeltaU) | MeasVoltage | freq | Current 
|-
Entry  Tue May 31 19:37:30 2022, Carsten, Max, Wilfried, Detectors, SASZ and NASZ voltages switched off 
SASZ and NASZ voltages were switched off bevor we went back to 209Bi. Laser beam stabilization turned off.
Entry  Tue May 31 19:59:49 2022, Carsten, Danyal, Accelerator, change in frequency mismatch 208Bi --> 209Bi 
time = 20:00 

The RF has been adjusted so that it bunches at the correct frequency for 209Bi 
Entry  Tue May 31 21:08:04 2022, Carsten, Max, Detectors, XUV detector automation off 
We deactivated the automation of the XUV detector. It stays out now.
Entry  Tue May 31 21:58:55 2022, Max, Rodolfo, Laser, MRC Settings for 209Bi  MRC_209Bi_31-05-2022_2157.png
We have change the laser settings for the spectroscopy of 209Bi. 

We have now T-scraped the laser beam to the old position of the ion beam. The settings for the MRC system are shown in the screenshot below. 
Entry  Wed Jun 1 00:03:08 2022, Konstantin, Simon, Kristian, Runs, 209-Bi runs 
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after orbit change| cooler-HV | cooler current (mA) | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step
width increment (nm) | dwell time(s) | n loops |comments
Entry  Wed Jun 1 00:16:02 2022, Konstantin, Simon, DAQ, Timing 209Bi thick target Timing_209Bi_final.png
Timing for the final measurements on 209Bi was determined for the new frequency 1.93777MHz. Peak positions are

PD NO 106
ELOG V3.1.5-fc6679b