HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+ 2024, Page 2 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Categorydown Subject Text Attachments
  60   Thu Jun 13 10:42:02 2024 DanyalGeneralQuestionWhat is the ion beam lifetime, according to
the DCCT and Schottky? 
Can somebody measure it, please? 
  
  76   Fri Jun 14 13:14:29 2024 Konstantin, Bernhard, Peter, LukasGeneralDAQ crashes at :1010 Minutes past a full hour (XX:10) the windows
PCs (sometimes) loose connection.
This causes the labview server & the laser
  
  13   Sat Jun 1 19:19:07 2024 CarstenDetectorsReminder: Check signals in scope and in DAQ of detectors with voltages switched off (vs. CFD threshold)When the ion pumps and vacuum gauges are switched
off the scaler data of 
PMT_south, PMT_middle, PMT_north, PD_NO,
  
  15   Mon Jun 3 18:24:44 2024 RodolfoDetectorsPMT arrangementThe picture shows the actual configuration
of the PMTs.
 PMT_Arrangement_2024-06-03.jpgHV-Powersupply_PMTs_Thorium2024.jpg 
  17   Tue Jun 4 22:54:02 2024 RodolfoDetectorsPMT - Manufacture - Test Result Data   PMT_9423B_SN652_ETEnterprises_UniGießen.pdfPMT_9423B_SN653_ETEnterprises_TUDA.pdfPMT9422_SN1049_Datenblatt.pdf 
  19   Wed Jun 5 19:22:43 2024 Carsten, Konstantin, RodolfoDetectorsPMT tests and preliminary thresholdsFor all channels of the CAEN CFD the width
of the logic signal is set to 255ns (maximum)
to mitigate potential double pulses. For
 SolarBlind_ET_9422_SN1042.pdfVoltagePMTs_05-06-2024.jpg 
  26   Thu Jun 6 19:42:20 2024 CarstenDetectorsExchange of amplifer channels / cables channels / HV voltage cables for PMT southIn order to check if the problem of regular
burst of pulses on the PMT south is related
to amplfier channels and or the HV cable,
  
  31   Fri Jun 7 15:29:50 2024 RodolfoDetectorsStored beam @ ESROne of the first PMT signals from the stored-ion
beam @ ESR
 Storedbeam@ESR_2024-06-07_15-25-18.png 
  33   Sat Jun 8 12:02:20 2024 CarstenDetectorsTest Particle Detectors - Det South not workingWith the test beam from ESR I started to have
a look at the PartDets.:
North outside: Works properly with a voltage
  
  36   Sun Jun 9 10:08:24 2024 Carsten/DanyalDetectorsParticle detectors - Recap of yesterdays work[B]South (behind cooler) - "SA_SZ" - DD2...[/B]
We have put the particle detecotr North to
the poistion behind the cooler (north) to
  
  37   Sun Jun 9 10:20:38 2024 Carsten/DanyalDetectorsRecap from yesterdays work with test beam (Detectors / beam /DAQ)In the ESR we had thw whole day (saturday)
a 400MeV/u bunched 238U92+ test beam (about
2 MHz). The RF signal is cabled as input
  
  54   Wed Jun 12 21:21:15 2024 YuriDetectorsNTCap startedFcenter - 244.6 MHz
BW - 10 MHz
  
  4   Mon May 27 13:37:31 2024 JanDAQMesyTec Shaper ControlFor the 2nd DAQ the MesyTec Shaper ([URL=https://elog.gsi.de/esr/NucAR+lab/230418_110112/MesyTec_MSCF16-F-V.pdf]MSCF
manual[/URL]) is used as a spectroscopy amplifier
and CFD.
 Screenshot2_MSCFGUI.pngScreenshot3_MSCFGUI.png 
  7   Fri May 31 15:53:06 2024 Ruijiu ChenDAQrun NTCAP systemNTCAP is working again. 
Connect the RF cable and the scaler cables
to NTCAP system.
  
  8   Fri May 31 16:49:52 2024 CarstenDAQWiring DAQ 1Started to Check the wiring.

Status as of  2024-05-31
  
  9   Sat Jun 1 18:00:20 2024 CarstenDAQReadOut Trigger im Timer Scaler changed because of faulty signal from frequency generatorOld readout trigger (~200 Hz) in 1MHz Scaler
showed two nearby peaks indicating a jitter
of the readout frequency or same faulty output
 ReadoutTrigger_from_FreqGen_2peaks.pngReadoutTrigger_from_Clock_1peak.png 
  12   Sat Jun 1 19:00:57 2024 CarstenDAQChange of (offline) frequency for common stop (CS) of VUPROMs (and 2nd TDC) and scaling factorTemporarily, for tests of the second DAQ I
changed the frequency from the frequency
generator and scaling factor  that is used
  
  14   Sun Jun 2 00:01:46 2024 CarstenDAQ25ps TDC CAEN V1290N DAQ2 lead to crash in DAQ2 due to a hardware issueOn the CAEN V1290N TDC the piggy board for
the lower 8 channels is not fixed well to
the motherboard.
  
  24   Thu Jun 6 09:23:53 2024 Konstantin MohrDAQTimingThe best way to adjust the bunch-laser timing
is to start go4 (mbs must be running) from
atppc023. Therefore use x2goclient and use
 TimingSSH.pngDualTimer.jpegTimingAdjustment.JPG 
  25   Thu Jun 6 09:39:23 2024 CarstenDAQPreliminary Channel Table (DAQ1 and DAQ2)   ChannelList.pdfChannelList.odt 
ELOG V3.1.5-fc6679b