HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025, Page 1 of 4  Not logged in ELOG logo
ID Date Author Category Subjectdown Text Attachments
  6   Wed Jun 11 11:20:23 2025 Konstantin, SimonDAQoctal gate generator delaysWe checked the set delays of the OG 8000 octal
gate generator and compared them with the
values measured before the Bi-beamtime (see
  
  23   Wed Jun 18 08:07:17 2025 Julien, KonstantinLasernew FCU CalibrationUV power was not stable but dropping from
~18 mW to 13 mW after opening COBRA shutters.
New calibration of frequency conversion unit:
 2025_06_18_FCU_Cal_Table.JPG2025_06_18_FCU_Cal_Plot.JPG 
  9   Thu Jun 12 15:53:13 2025 CarstenDAQdata directory and backup disk (WDBook2 RAID)The data of DAQ1 are stored in the following
directory and with the following filenames
  
  33   Sat Jun 21 01:40:31 2025 Carsten, Alex, Anton, Rodolfo, HiroshiAcceleratorbeam parametersThe revolution frequency for the measurement
condition is: 1.542728 MHz.
The electron cooler voltage is: 104411 V.
  
  19   Wed Jun 18 00:56:28 2025 Carsten, Rodolfo, Anton, Alexis, Esther beam overlap with t-scrapersWhen testing the overlap between laser and
ion beam we observed the following positions:
  
  35   Sat Jun 21 03:06:19 2025 Rodolfo, Alex, Hiroshi, AntonLaserbeam overlap with t-scrapers[TABLE border="1"]
motor|ion beam position (mm) from outside|ion
beam position (mm) from inside
 2025-06-21_05-14-39-706.png2025-06-21_05-22-21-447.png2025-06-21_05-27-59-895.png2025-06-21_05-31-37-019.pngMRC-settings_Th-Beam_2025-06-21.JPG 
  63   Thu Jun 26 21:27:34 2025 Carsten, Jan, SimonCalibrationTimingWe checked the timing (before the start of
the measurement cycle documented below).
Timing and measurement window are attached.
 Bildschirmfoto_timing_new_2025-06-26_19-00-04.png 
  67   Fri Jun 27 11:21:25 2025 Esther, KonstantinDAQTimingWe cross-checked the timing. Laser pulse is
detected at bins 136 (PD-North) and 171 (PD-south),
respectively. Therefore, the laser puls is
  
  14   Mon Jun 16 22:27:01 2025 Carsten, SimonDAQThresholds We also adjusted the thresholds for the mesytic.
Doing that, we noticed that one of the trafos
is broken (5th row, middle).
  
  39   Sat Jun 21 11:42:50 2025 Arya, Julien, WilfriedGeneralTest laser scanTest scan to see whether laser spot is moving
while scanning
  
  17   Tue Jun 17 19:25:30 2025 RodolfoAcceleratorT-Scrapers in E-CoolerHere are the instructions to drive the T-Scrapers
inside the ESR Electron Cooler
 Scrapereinstellung_am_E-Kühler.pdf 
  Draft   Sun Jun 22 23:48:35 2025 CarstenAcceleratorSummary of todays settings and tests Scraping, beam intesnity optimizations and
nuching were set up and optimized during
the day.
  
  32   Sat Jun 21 00:52:07 2025 CarstenAcceleratorSummary of the last days (bunches wiht several isotopes still in ) / frequency of the Initially, we has very low SIS beam intensities
in the 1e8 region. Setting up ESR wiht Stacking
etc. turned out to be extremly tedious for
  
  44   Sun Jun 22 11:31:59 2025 Arya, Carsten, Julien, KonstantinGeneralSummary morning shift1. UNILAC running again, so we resumed the
beam tuning wherre we stopped yesterday at
14:00
  
  12   Mon Jun 16 07:26:01 2025 KonstantinDAQStartup of Medusa and DAQ1The laser control software (Medusa) is hosted
on the Windows PC ATPPC023. First connect
via the command
 MedusaStartup.JPGMedusa.png 
  58   Tue Jun 24 18:49:18 2025 Carsten, Rima, Nils, SimonRunsSecond attempt (Late shift 24.06.)
[B] Scan parameters:[/B]
[TABLE border="1"]
  
  53   Mon Jun 23 10:59:36 2025 Julian, Lukas, Zsolt, Nadine, KonstantinRunsScan routine-Start new injection
  ->wait for 60 injections to be complete
  ->note down SIS intensity (at extraction)
  
  71   Sat Jun 28 15:28:22 2025 Carsten., Uwe RunsRuns with new scan range22:10  SIS Trafo GS09DT scale was changed
to 4e8 (not just the lassie monitor)
23:50 Ausfall ESR: GE01 KP01 bis KP05 und
  
  69   Fri Jun 27 22:14:35 2025 Anton, Finn, CarstenRunsRuns night shift 27.06. 28.0622:10  SIS Trafo GS09DT scale was changed
to 4e8 (not just the lassie monitor)
23:50 Ausfall ESR: GE01 KP01 bis KP05 und
  
  68   Fri Jun 27 14:23:39 2025 Nils, Wilfried, Carsten, JulianRunsRuns afternoon shift 27.06.15:30 We have a break due to an issue at UNILAC
(quadrupole failed). Also radiation safety
interlock was triggered at the fragment separator.
  
ELOG V3.1.5-fc6679b