HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025, Page 2 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Text Attachments
  46   Sun Jun 22 21:36:48 2025 Carsten, Finn, Zac, EstherRunsFirst laser scans
[B] Scan parameters:[/B]
[TABLE border="1"]
  
  45   Sun Jun 22 18:47:23 2025 Carsten, Peter, Marek, SimonDAQPMT and particle detector settingsFinal voltages and thresholds for the PMTs
and particle detectors before the first scan:
  
  Draft   Sun Jun 22 11:31:59 2025 Arya, Carsten, Julien, KonstantinGeneralSummary morning shift1. UNILAC running again, so we resumed the
beam tuning wherre we stopped yesterday at
14:00
  
  43   Sat Jun 21 22:33:04 2025 Peter , DanyalDetectorsPMTs are switched offWe have switched off all 3 PMTs  !   
  42   Sat Jun 21 21:55:18 2025 Peter, Danyal, MarekDetectorsPMT ratesWe have made two foam rings (outer diameter
ca. 70 mm with a thickness of 10 mm each
and placed them successively underneath PMT
 no_rings_under_PMT_north.png2_rings_under_PMT_north.png 
  41   Sat Jun 21 18:00:49 2025 Carsten, Peter, Danyal, Kristian, Marek DetectorsPMT signalsCarsten and Kristian changed (18:00) the thresholds
of PMT north and PMT middle in the ESR cave.
 Panel4.gif 
  40   Sat Jun 21 17:00:10 2025 Carsten, Peter, Danyal, Kristian, MarekDetectorsPMT north exchangedWe noted that the dark countrate of PMT north
is about 20x higher than that of PMT middle.
 Panel4.pngPanel4.jpg 
  39   Sat Jun 21 11:42:50 2025 Arya, Julien, WilfriedGeneralTest laser scanTest scan to see whether laser spot is moving
while scanning
  
  38   Sat Jun 21 08:48:16 2025 Arya, Julien, WilfriedAcceleratorLow 229Th particle numbers and 229Th lifetime in ringWith reference to entry 37 Laser timing:

- at last 30 injections accumulation: 10k
 Bildschirmfoto_timing_full_2025-06-21_09-30-46.pngBildschirmfoto_timing_end_of_manipulation_2025-06-21_09-36-24.pngBildschirmfoto_timing_full_60_2025-06-21_11-25-51.pngBildschirmfoto_PDSouth_lifetimes_2025-06-21_11-26-43.png 
  37   Sat Jun 21 07:28:35 2025 Arya, Julien, WilfriedLaserLaser TimingWe roughly adjusted the timing based on attachment
1, for ions to be in center of electron cooler
(east arc), corrected for PMTs being 2.5m
 Bildschirmfoto_IonBunch_PDs_2025-06-21.pngBildschirmfoto_rough_timing_2025-06-21_07-22-59.pngBildschirmfoto_timingcorrected_2025-06-21_08-21-53.pngBildschirmfoto_timing_final_2025-06-21_08-46-18.png 
  36   Sat Jun 21 03:13:02 2025 Alex, Anton, Rodolfo, HiroshiDetectorsPart Det SouthBunch signal on Particle Detector South. On
the 
 Bildschirmfoto_PartDetSouth_2025-06-21.png 
  35   Sat Jun 21 03:06:19 2025 Rodolfo, Alex, Hiroshi, AntonLaserbeam overlap with t-scrapers[TABLE border="1"]
motor|ion beam position (mm) from outside|ion
beam position (mm) from inside
 2025-06-21_05-14-39-706.png2025-06-21_05-22-21-447.png2025-06-21_05-27-59-895.png2025-06-21_05-31-37-019.pngMRC-settings_Th-Beam_2025-06-21.JPG 
  34   Sat Jun 21 02:32:24 2025 Alex, Anton, Rodolfo, Hiroshi, CarstenLaserLaser scanning settingThis is the initial scanning range
[LIST]
[*] 3 Loops
  
  33   Sat Jun 21 01:40:31 2025 Carsten, Alex, Anton, Rodolfo, HiroshiAcceleratorbeam parametersThe revolution frequency for the measurement
condition is: 1.542728 MHz.
The electron cooler voltage is: 104411 V.
  
  32   Sat Jun 21 00:52:07 2025 CarstenAcceleratorSummary of the last days (bunches wiht several isotopes still in ) / frequency of the Initially, we has very low SIS beam intensities
in the 1e8 region. Setting up ESR wiht Stacking
etc. turned out to be extremly tedious for
  
  31   Sat Jun 21 00:23:22 2025 RodolfoLaserDyeI have prepared new (fresh) dye solutions
of Fluorescein 27: 2 charges. They are in
the Safety Cabinet (Sicherheitsschrank) in
 Farbstoff_FL27.jpg 
  30   Fri Jun 20 15:58:21 2025 Wilfried, Konstantin, SimonLaserLaser stepwidthFrom previous Bi-Beamtimes, we expect the
width of the transition to be >50GHz (FWHM).
The current step width is 0.002nm which corresponds
  
  29   Fri Jun 20 11:25:32 2025 Julien, Kristian, KonstantinLaserAutomated laser scans In contrast to entry [URL=https://elog.gsi.de/esr/E0052_2025/12]E12[/URL],
the cabling for the automated start of the
laser scan is now connected to [B]IO3 of
  
  28   Fri Jun 20 06:37:51 2025 KonstantinAcceleratorPosition of contaminantsI checked the positions of the contaminants.
Therefore, I drove the scrapers and observed
the signal at the Schottky detector
  
  27   Wed Jun 18 20:24:01 2025 Carsten, Shahab, Ragandeep, Danyal et al. (the dayshift) and ESR crewAccelerator229Th89+ identificationWe believe to have identified the 237U92+
and the 229Th89+ peaks. 
 245_MHz_Schottky_229Th89.jpg 
ELOG V3.1.5-fc6679b