HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  Bound beta decay experiment on Tl-205, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  1   Thu Sep 13 11:32:17 2018 Jan GloriusCollaborationProposalAttached is the beam time proposal submitted
and accepted by the G-PAC in 2017.
 E121_Litvinov.pdfE121_Approval.pdf 
  2   Mon Dec 3 15:06:04 2018 Chen, SidhuDAQTest of two preamplifier.[B]Description:[/B]
   We have two pre-amplifiers:
   New: Max. range 5GeV, Two sensitivity
 20181121_ElectronicCircuits_1.png20181121_ElectronicCircuits_2.png20181121_ElectronicCircuits_3.png20181121_ElectronicCircuits_4.png 
  3   Wed Dec 5 17:29:24 2018 Chen, SidhuDetectorssignal map[B]Description:[/B]

  Here is a summary of signal map. The charged
 13x 
  4   Fri Dec 7 10:56:04 2018 Jan GloriusSlowControlEPICS ioc on raspberryWe have an EPCIS server (ioc) running on our
raspberry (ext-027377). It talks to our MesyTec
modules (MSCF shapers, MHV4 high-voltages).
  
  5   Fri Dec 7 11:39:41 2018 Jan GloriusSlowControlGUI for remote control of MSCF+MHV4We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
  
  6   Mon Dec 10 11:59:15 2018 Chen, SidhuDetectorsTest of shaping amplifier.[IMG]elog:6/1[/IMG]

[IMG]elog:6/2[/IMG]
 TestOfShapingAmplifier.jpg20181207_Test_of_shaping-amplifier2.jpg20181207_Test_of_shaping-amplifier3.jpg20181207_Test_of_shaping-amplifier4.jpg 
  7   Tue Mar 12 12:54:58 2019 Chen, SidhuDAQhow to start DAQ and plot histogram.[B]1. login litv-exp account[/B]
rchen@lxg1254:/data.local2/2002_238UIMS$
ssh -X litv-exp@lxg0155.gsi.de
 000000000001_edit.png55_PM.pngdrawing-1.png 
  8   Tue May 7 15:52:47 2019 Chen, SidhuSlowControlGUI for remote control of MSCF+MHV4 [detailed]We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
 000000000003.png 
  9   Tue May 28 08:36:14 2019 JanDAQMBS start & RFIO serverYou need a DAQ-PC and the RIO crate computer.
All of the DAQ proceedures laid out here
are operated from inside the DAQ screen session.
  
  10   Wed Jun 26 16:20:31 2019 JanDAQunpacker: lmd > rootI have written an unpacker for the lmd data
taken with the current daq-system for E121.
The crate configuration is as follows:
 E121.specdet_mapping.hh 
  11   Tue Aug 27 14:53:47 2019 Chen, SidhuDetectorsThe thickness uncertainty of Ta is less than 1%. The thickness of Ta plate have been measured
by target group. The result is show as following.
According to this measurement, the thickness
 20180711ChargeParticleDetectorV8.png20180711ChargeParticleDetectorV8.png2019_08-Ta-Blech.xlsx 
  12   Thu Oct 24 15:36:13 2019 Chen, SidhuDetectorsDetector installation process[IMG]elog:12/1[/IMG]
[IMG]elog:12/2[/IMG]
[IMG]elog:12/3[/IMG]
 Detector_installation_process1.pngDetector_installation_process2.pngDetector_installation_process3.pngDetector_installation_process.pdf 
  13   Wed Jan 29 10:42:42 2020 ShahabGeneralGas target control with the new control system event
Many thanks to Sergey and Nikos we have tested
the connection of the new control system
 IMG_20200128_153508.jpgIMG_20200128_145345.jpgIMG_20200128_145340.jpgIMG_20200128_145307.jpgIMG_20200128_144555.jpg 
  14   Fri Feb 21 11:30:52 2020 LaszloGeneralShift plane127: https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0

e121: https://docs.google.com/spreadsheets/d/10MUzA5-Ilf2WzCyNj8u_KSG6yzPg0e4vtZGGPFB3K-k/edit#gid=0
  
  15   Tue Feb 25 15:48:31 2020 ruijiu chenDAQImportant folders of e121 eperiments:1. slow control:
1.1. program file:
litv-exp@ringpi:~/epics/mrcc_ioc/db $ 
  
  16   Tue Feb 25 15:49:58 2020 ruijiu chenDAQchanging scaling factor.How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
  
  17   Thu Feb 27 14:04:12 2020 Ruijiu ChenDetectorsRemote control of HV moduleBe careful. The voltage value on user interface
is 10 times of real value. e.g. if the real
value is 32V, the voltage value on UI has
 20180711ChargeParticleDetectorV8.jpg 
  18   Thu Mar 26 17:21:40 2020 RaganGeneralStochastic cooling1) From SIS, 206Pb67+ @401.17 MeV/u goes to
FRS where only SEETRAM is placed in the target
area to strip off 206Pb67+ to get 206Pb81+.
  
  19   Fri Mar 27 13:02:07 2020 RaganGeneralStochastic cooling1) ESR team is successful with the Stochstic
cooling of primary H-like 206Pb81+ beam @400
MeV/u.
 stochastic_cooling.PNG 
  20   Fri Mar 27 13:04:17 2020 RaganGeneralFRS Settings until nowYuri and Helmut have been extensively involved
in tuning and optimizing of the FRS.
 frs.pdfFRS.pdf 
ELOG V3.1.5-fc6679b