HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 2 of 9  Not logged in ELOG logo
Entry  Fri Mar 27 13:40:54 2020, Ragan, General, NTCap start and shutdown information ntcapmanual.pdf
The attachment contains information on how to start and shutdown NTCap and bridge computer.
Entry  Fri Mar 27 19:51:37 2020, Ragan, General, ESR Machine 
By changing the tune to Qx=2.33, Qy=2.36 the momentum acceptance was significantly improved. A variation of the cooler voltage of 10300 V was possible without
beam loss. That corresponds to a momentum acceptance of 2.7 %. That should provide good conditions for longitudinal stacking.
Entry  Fri Mar 27 19:59:09 2020, Ragan, General, Beam stacking in ESR is achieved 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOVstacking.png
Thanks to Sergey and Markus, stacking of primary H-like 206Pb81+ beam in ESR is achieved.

The stacking of the primary beam was established. There is continuous cooling on the injection orbit by stochastic cooling and by electron cooling on the
Entry  Fri Mar 27 20:05:43 2020, Ragan, General, H2 gas jet ready BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
Thanks to Nikos, stable H2 gas jet target with 10^14 particles/cm^3 is ready.
(More information can be found on: https://ulpc24.gsi.de/cgi-bin/jet.py?gasart=Helium )
Entry  Fri Mar 27 20:52:31 2020, Ragan, General, Plans for the measurement with 206Pb81+ 
We plan to measure:

1. Lifetime of H-like 206Pb81+ beam with two electron cooler currents:
Entry  Sat Mar 28 01:14:19 2020, Ragan, General, Cross-section for capture and ionisation of 206Pb81+ with H2 target  GLOBAL.pdf
Cross-section for capture and ionisation of 206Pb81+ with H2 gas jet target are calculated using GLOBAL code.
The ionisation (on CsISiPHOS) and capture (on MWPC) trigger rates are calculated for 206Pb81+ beam with 10^6 particles revolving in ESR ~2 MHz frequency
with H2 gas jet target density ~ 10^14 particles/cm3.
Entry  Sat Mar 28 04:32:15 2020, Ragan, Detectors, Ionisation events on DSSSD 9800D808-D570-466D-8411-512D069F9233.jpeg
XY co-relation of DSSSD showing 206Pb82+ beam hitting the CsISiPHOS detector present in the inner pocket of ESR after the first dipole after the gas jet.
206Pb82+ is 
produced by ionisation of 
Entry  Sat Mar 28 04:50:34 2020, Ragan, Detectors, MWPC 4475A53F-48AB-430E-8A22-7D92E5FEACBF.jpeg
Alex and Pierre-Michel applied 1500 V to the anode and adjusted the threshold in Messhute.
x1 signal was small & noisy and rest of the signals were fine.
Entry  Sat Mar 28 11:00:14 2020, Ragan, RuiJiu, Mei, Yuri, Tino, Detectors, Movement of detector IMG_20200328_110253.jpgIMG_20200328_110258.jpg
10:51 am the CsISiPHOS is moved to 65 mm from 60 mm.The spot on the DSSSD is changed by 5 mm which confirms the hit of the beam.

11:05 
Entry  Sat Mar 28 11:07:49 2020, Ragan, RuiJiu, Tino, , General, Nikos is changing gas jet target 
The gas jet target is now being changed from H2 to Ar by Nikos.
Entry  Sat Mar 28 11:20:10 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, Reducing beam intensity in ESR 
Yuri reduces beam intensity in the ESR to reduce the countrate on the detectors.
Entry  Sat Mar 28 11:28:11 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, ESR open 
ESR is open now
Entry  Sat Mar 28 12:19:21 2020, Ragan, RuiJiu, DAQ, Change of the polarity of Amplifiers 7888530B-DE66-4D37-A0A8-933307DD2AB8.MOV
Since last night, the signals from the p-side of all the Si pads were seen as negative on picoscope.
The signals from DSSSD, all n-sides of Si pads and CsI were positive which all are in MSCF-5.
Thus, I and RuiJiu, changed the polarity jumpers of MSCF 1,2,3 and 4(all the four jumpers inside the mentioned MSCF) and now hope to see positive signals
Entry  Sat Mar 28 13:09:11 2020, Mei,Yury, Tino, Ragan, Ruijiu, General, Shift plan 
From Yury,

For now, measure the beam life time with 3 different electron current in the e-cooler,i.e. 200mA(default), 10mA, and 20mA. For each current, 4 sets of
Entry  Sat Mar 28 13:19:56 2020, Ragan, Runs, Template 
beam: 
energy: 
storage time:
Entry  Sat Mar 28 14:19:24 2020, Ragan, RuiJiu, Mei, Yuri, General, Instructions to change the electron cooler current instructions.pdf
Attached are the instructions on how to change the electron cooler current for the lifetime measurements of 206Pb81+ beam (interaction with residual gas
and electron cooler).
Entry  Sat Mar 28 15:07:40 2020, ruijiu, DAQ, start run  
 
Entry  Sat Mar 28 15:19:23 2020, ruijiu, , start run e121_run_0236.lmd 
store 206Pb81+ beam inside ESR and measure its halflife. 
The HV of detector is off.
Start DAQ to record the ESR current in lmd file.
Entry  Sat Mar 28 15:23:05 2020, Alex, Ragan, Mei Bai , General, beam lifetime measurement 15854053877798703970476301545600.jpg
We see two species in the Schottky spectra during the beam lifetime measurement without the target. The one (probably the primiary beam) is significantly
better cooled than the other.
So, we were wondering what is the other beam? Maybe the recombined ones?
Entry  Sat Mar 28 16:09:50 2020, Alex, General, no beam in the ESR 
Ragan and Ruijiu went in the ESR for short time to fix something with the slow control of the silicon detector.
After this, there is no beam in the ESR.
ELOG V3.1.5-fc6679b