  Bound beta decay experiment on Tl-205, Page 9 of 9  Not logged in ELOG logo
Entry  Mon Apr 6 05:43:50 2020, Ragan, Laszlo, Nikos, Runs, One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-06_06-18-59-809.png946073FA-3077-4CBF-900B-565BD19CF040.jpeg10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg2020-04-06_08-03-40-493.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
Entry  Mon Apr 6 08:37:02 2020, Ragan, Shahab, Pierre-Michel, Runs, 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 8x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
Entry  Mon Apr 6 09:34:58 2020, Shahab, Runs, Pictures from one and a half hour measurement wideband_rec_001.PNG
cheers!
Entry  Mon Apr 6 14:17:54 2020, Yuri, Shahab, Runs, FRS valves 2020-04-06_14-22-20-965.png
We saw reduction in ESR beam life. It turned out that FRS has opened valves and venting caused us reduction of the quality of vacuum in ESR leading to beam
loss. We manged to closed GEE5VV so that now beam is stable somehow.
Entry  Mon Apr 6 14:57:04 2020, Shahab, Runs, cooler down 
cooler component GECEBG2T again had to be reset.
Entry  Mon Apr 6 20:03:50 2020, Ragan, General, Experiment finished )) 
E121 experiment is finished with the last 10 hours measurement at 19:47 ))
Many thanks to everyone for there significant contributions ))
Entry  Thu Apr 9 11:16:35 2020, Ragan, General, Measurements done in the experiment storage11.pdfstorage12.pdfstorage13.pdf
 
Entry  Thu Apr 9 11:47:28 2020, ruijiu, , backup data IMG_20200409_113155.jpg
2020.4.8  12:00Started copying 
data。
2020.4.9    11:52 Copied 6.3TB 
Entry  Fri Apr 17 18:27:34 2020, ruijiu, Analysis, backup data IMG_20200417_162202.jpg
1.connect USB harddisk  to computer lxg1254 and  copy data to sever.

sync -rtmv --progress --checkSUD  /media/sdgl/data/ litv-exp@sbk0l9:/lustre/ap/litv-exp/2020-
Entry  Mon Apr 20 11:17:18 2020, Ragan, General, Logbook logbook.pdfcombined_FRS.pdfcombined_data.pdf
 
Entry  Wed Aug 5 17:19:16 2020, Rui-Jiu Chen, Analysis, Data structure DataStructure.pdf
 
Entry  Thu Oct 1 22:20:03 2020, Jan, DAQ, final unpacker config E121.specdet_mapping.hh
We identified an issue with randomly missing adc channels in all lmd-files before run 0273.
This led to errors in the unpacking process. 
Entry  Mon Nov 2 16:45:55 2020, Jan, DAQ, f_user & mbslog f_user.cmbslog.l
Attached is the f_user.c and the mbslog.l files.
The readout function is for the following setup:
3x ADC CAEN V785 
Entry  Thu Nov 5 15:13:43 2020, Jan, Analysis, root script example e121_analysis.Ce121_mapped.he121_raw.h
Attached is an example root script/macro that shows how to use scripts for analysis.

Usage:
Entry  Thu Nov 19 09:14:40 2020, Jan, Detectors, remote MSCF settings for CsISiPHOS setting.1585477986det_mapping.png
Attached is a list of all set values for the 5 MSCF shaper modules.
This was done prior to run0251, which served as a final benchmark for those settings.
See: https://elog.gsi.de/esr/E121/62
Entry  Tue Dec 8 15:47:07 2020, Jan, Detectors, manual preamp & shaper settings for CsISiPhos amp_settings.pdf
attached is a document showing fotos of all involved amplifiers in the chain to document the manual settings active during the experiment.

Summary:
Entry  Tue Dec 15 09:25:41 2020, Jan, DAQ, SiCsIPhos signal/amplitude reconstruction amps.pdf
 
Entry  Mon Mar 29 16:31:09 2021, Pierre-Michel, DAQ, cross section Pb81onAr.png
(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8 = 1.29595
Entry  Sun May 30 12:09:00 2021, Ragan, General, NTCAP ntcap_carsten.pdf
Attached is the info given by Carsten.
The instructions to operate NTCAP are given on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
Entry  Wed Aug 25 15:13:41 2021, Jan, DAQ, SC13 clock frequency 
The frequency of the clock used as reference in scaler channel 13 has been measured precisely.
In contrast to what was expected (1.5MHz precisely), it is: 