HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 1 of 9  Not logged in ELOG logo
Entry  Thu Sep 13 11:32:17 2018, Jan Glorius, Collaboration, Proposal E121_Litvinov.pdfE121_Approval.pdf
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017.
Entry  Mon Dec 3 15:06:04 2018, Chen, Sidhu, DAQ, Test of two preamplifier. 20181121_ElectronicCircuits_1.png20181121_ElectronicCircuits_2.png20181121_ElectronicCircuits_3.png20181121_ElectronicCircuits_4.png
[B]Description:[/B]
   We have two pre-amplifiers:
   New: Max. range 5GeV, Two sensitivity options: 1 GeV and 5 GeV,  Decay time = 30 us, pulse input 220 MeV/u, Ser. #MPR-32-D-5000-30-1118380.
Entry  Wed Dec 5 17:29:24 2018, Chen, Sidhu, Detectors, signal map 13x
[B]Description:[/B]

  Here is a summary of signal map. The charged particle detector includes 6 layers of Si-Pad, 1 DSSD and 1 CsI. 
Entry  Fri Dec 7 10:56:04 2018, Jan Glorius, SlowControl, EPICS ioc on raspberry 
We have an EPCIS server (ioc) running on our raspberry (ext-027377). It talks to our MesyTec modules (MSCF shapers, MHV4 high-voltages).
In principal it should be running all the time, but here is the manual how to check/start it:
Entry  Fri Dec 7 11:39:41 2018, Jan Glorius, SlowControl, GUI for remote control of MSCF+MHV4 
We have a GUI for remote controlling our MesyTec modules MSCF16 and MHV4 for E121 experiment.

Here is the instructions to run it:
Entry  Mon Dec 10 11:59:15 2018, Chen, Sidhu, Detectors, Test of shaping amplifier. TestOfShapingAmplifier.jpg20181207_Test_of_shaping-amplifier2.jpg20181207_Test_of_shaping-amplifier3.jpg20181207_Test_of_shaping-amplifier4.jpg
[IMG]elog:6/1[/IMG]

[IMG]elog:6/2[/IMG]
Entry  Tue Mar 12 12:54:58 2019, Chen, Sidhu, DAQ, how to start DAQ and plot histogram. 000000000001_edit.png55_PM.pngdrawing-1.png
[B]1. login litv-exp account[/B]
rchen@lxg1254:/data.local2/2002_238UIMS$ ssh -X litv-exp@lxg0155.gsi.de
(don't login on lx-pool.)
Entry  Tue May 7 15:52:47 2019, Chen, Sidhu, SlowControl, GUI for remote control of MSCF+MHV4 [detailed] 000000000003.png
We have a GUI for remote controlling our MesyTec modules MSCF16 and MHV4 for E121 experiment.

Here is the instructions to run it:
Entry  Tue May 28 08:36:14 2019, Jan, DAQ, MBS start & RFIO server 
You need a DAQ-PC and the RIO crate computer.
All of the DAQ proceedures laid out here are operated from inside the DAQ screen session.
Right now for e121 the following DAQ-setup is used: (might change in the future)
Entry  Wed Jun 26 16:20:31 2019, Jan, DAQ, unpacker: lmd > root E121.specdet_mapping.hh
I have written an unpacker for the lmd data taken with the current daq-system for E121.
The crate configuration is as follows:
ADC1 channels 1-32 (Caen 785)
Entry  Tue Aug 27 14:53:47 2019, Chen, Sidhu, Detectors, The thickness uncertainty of Ta is less than 1%.  20180711ChargeParticleDetectorV8.png20180711ChargeParticleDetectorV8.png2019_08-Ta-Blech.xlsx
The thickness of Ta plate have been measured by target group. The result is show as following.
According to this measurement, the thickness uncertainty is less than 1%. 
This thickness uncertainty is good enough for Tl experiment. 
Entry  Thu Oct 24 15:36:13 2019, Chen, Sidhu, Detectors, Detector installation process Detector_installation_process1.pngDetector_installation_process2.pngDetector_installation_process3.pngDetector_installation_process.pdf
[IMG]elog:12/1[/IMG]
[IMG]elog:12/2[/IMG]
[IMG]elog:12/3[/IMG]
Entry  Wed Jan 29 10:42:42 2020, Shahab, General, Gas target control with the new control system event IMG_20200128_153508.jpgIMG_20200128_145345.jpgIMG_20200128_145340.jpgIMG_20200128_145307.jpgIMG_20200128_144555.jpg

Many thanks to Sergey and Nikos we have tested the connection of the new control system for turning on and off of the gas target.
Entry  Fri Feb 21 11:30:52 2020, Laszlo, General, Shift plan 
e127: https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0

e121: https://docs.google.com/spreadsheets/d/10MUzA5-Ilf2WzCyNj8u_KSG6yzPg0e4vtZGGPFB3K-k/edit#gid=0
Entry  Tue Feb 25 15:48:31 2020, ruijiu chen, DAQ, Important folders of e121 eperiments: 
1. slow control:
1.1. program file:
litv-exp@ringpi:~/epics/mrcc_ioc/db $ 
Entry  Tue Feb 25 15:49:58 2020, ruijiu chen, DAQ, changing scaling factor. 
How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
Entry  Thu Feb 27 14:04:12 2020, Ruijiu Chen, Detectors, Remote control of HV module 20180711ChargeParticleDetectorV8.jpg
Be careful. The voltage value on user interface is 10 times of real value. e.g. if the real value is 32V, the voltage value on UI has to be 320V. 
[IMG]elog:17/1[/IMG]
Entry  Thu Mar 26 17:21:40 2020, Ragan, General, Stochastic cooling 
1) From SIS, 206Pb67+ @401.17 MeV/u goes to FRS where only SEETRAM is placed in the target area to strip off 206Pb67+ to get 206Pb81+.
2) There is 206Pb81+ (H-like primary beam) inside ESR at 400 MeV/u.
3) The ESR team is now trying Stochastic cooling with 206Pb81+ beam at 400 MeV/u.
Entry  Fri Mar 27 13:02:07 2020, Ragan, General, Stochastic cooling stochastic_cooling.PNG
1) ESR team is successful with the Stochstic cooling of primary H-like 206Pb81+ beam @400 MeV/u.
2) Now, they are trying for stacking of the beam.
Entry  Fri Mar 27 13:04:17 2020, Ragan, General, FRS Settings until now frs.pdfFRS.pdf
Yuri and Helmut have been extensively involved in tuning and optimizing of the FRS.

26th March, 2020 (Evening setting):
ELOG V3.1.5-fc6679b