HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
Bound beta decay experiment on Tl-205, Page 7 of 9
Not logged in
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
SlowControl
180 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
,
9
Next
All
Mon Mar 30 09:26:37 2020, Tino, Runs, Stopped Second measurement with 206Pb81+ beam at I_cooler = 10 mA
Sat Mar 28 13:19:56 2020, Ragan, Runs, Template
Thu Apr 2 06:25:13 2020, Ragan, Runs, Template
Sun Mar 29 20:32:20 2020, Ragan, General, Template for Pb halflive measurement
Sat Apr 4 23:44:22 2020, Ragan, RuiJiu, Laszlo, Runs, Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Mon Dec 10 11:59:15 2018, Chen, Sidhu, Detectors, Test of shaping amplifier.
Mon Dec 3 15:06:04 2018, Chen, Sidhu, DAQ, Test of two preamplifier.
Tue Mar 31 15:30:43 2020, ruijiu, Analysis, The beam position on DSSD with different conditions on on the dEE spectrum
6x
Mon Mar 30 14:48:02 2020, ruijiu and Tino, Detectors, The leakcurrent of SiPad is over the setting limit.
Tue Aug 27 14:53:47 2019, Chen, Sidhu, Detectors, The thickness uncertainty of Ta is less than 1%.
Mon Apr 6 01:02:00 2020, Ragan, Laszlo, Nikos, Runs, Three hour measurement (S2: 0/35 mm and S6: -20/7 mm)
9x
Thu Apr 2 21:12:39 2020, Ragan, Nikos, Pierre-Michel, Dima, Runs, Three hour measurement (S2: 0/35 mm)
Sat Apr 4 18:57:49 2020, Ragan, Alex, Esther, General, Timing problem with SIS & ESR and problems with stacking
Sun Apr 5 10:31:08 2020, Ragan, Shahab, Runs, Two hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Fri Apr 3 03:59:14 2020, Ragan, Pierre-Michel, Dima, Runs, Two hour measurement (S2: 0/35 mm)
Sat Apr 4 00:00:20 2020, Ragan, Laszlo, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Sat Apr 4 00:40:29 2020, Ragan, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Mon Apr 6 05:28:55 2020, Ragan, Laszlo, Nikos, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Fri Apr 3 03:18:06 2020, Ragan, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm)
Fri Apr 3 13:21:16 2020, Ragan, Mei, Shahab, Runs, Zero hour measurement (S2: 0/35 mm)
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
,
9
Next
All
ELOG V3.1.5-fc6679b