HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 1 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subjectdown Year Text Attachments
  38   Tue Mar 10 09:41:26 2020 JanDetectorsx-ray background from BaF The BaF2 detectors planned to be installed
at the target induce an additional background
in the x-ray detectors sitting below inside
  
  241   Mon Mar 23 12:30:39 2020 laszloAnalysiswith and without scraper    124Xe_with_scraper_3D.png124Xe_with_scraper_2D.png124Xe_without_scraper_2D.png124Xe_without_scraper_3D.png 
  62   Wed Mar 18 09:53:28 2020 Laszlo, JanGeneralvacuum after opening gate valve Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
 vacuum_ESR1.jpgvacuum_setup1.jpg 
  277   Thu Apr 23 19:09:58 2020 LaszloCalibrationtheoretical K-REC cross sections  Find attached Andrey Surzhykov's calculations
for the theta angle in respect to the beam
direction (in lab. frame) vs. cross section
 9x 
  48   Sun Mar 15 17:13:21 2020 Laszlo, JanCalibrationthe x-ray gate issue We found a strange behaviour of our ADC gates
for the x-ray detectors.
The setting as shown in the foto below corresponds
 IMG_20200315_172129.jpg 
  291   Thu Apr 22 10:56:20 2021 JanDetectorstarget-chamber det. distances2021This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
 E127_xray_distances.jpg 
  130   Sat Mar 21 14:52:05 2020 LaszloGeneraltarget optimization previous position of the beam at target was
-3mm (for the night position)
max. intensity position of the beam at target
 IMG_20200321_145105.jpgIMG_20200321_145059.jpg 
  68   Fri Mar 20 01:21:00 2020 LaszloGeneraltarget is switched on event based     
  147   Sat Mar 21 21:36:06 2020 JanRunstarget incident in run 66 or 67 we had a single ESR cycle
for which the target didn't switch off for
new injection and deceleration etc.
 run67_target_incident.png 
  201   Sun Mar 22 18:35:43 2020 Laszlo target dropped aagain there was a drop again from 8.6e13 to 7e13
in the target density
 target_density_after_118Te_afternoon_runs.png 
  361   Fri May 21 10:00:51 2021 JanAcceleratortarget bump2021The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
  
  198   Sun Mar 22 17:45:07 2020 LaszloGeneralswitching to primary beam We have finished the measurement with the
fragments.
  
  64   Thu Mar 19 15:09:29 2020 JanGeneralstarting off with DSSSD here is my short guide how to start with the
measurement as soon as we have a beam available.
  
  22   Wed Sep 25 13:03:46 2019 LaszloAnalysissimulations on 118Te+p I have made some simulations at 8AMeV, 7AMeV
and 4AMeV energies for the main 118Te + p
reaction channels. For the
 11x 
  360   Fri May 21 01:17:37 2021 LaszloAnalysissimple analysis code2021//a simple code (template) for offline analysis
//made by Laszlo, serves as a simple demonstration
for enthusiastic shifters
  
  30   Thu Dec 5 10:57:57 2019 Jan, LaszloDetectorssetting up the DSSD with beam This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
  
  244   Mon Mar 23 13:26:59 2020 JanAnalysisruns_90to99 SCRAPER RESULTS With scraper, we have roughly 150-200 (p,g)
counts now.
 124Xe_Si_map.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png124Xe_Si_projection.png 
  251   Mon Mar 23 14:32:03 2020 JanAnalysisruns_100to104 NO-SCRAPER RESULTS Without scraper, we have very few (p,g) counts,
hard to get numbers quickly, maybe ~50.
 124Xe_Si_map.png124Xe_Si_projection.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png 
  5   Fri Apr 5 05:46:20 2019 JanDAQrunning DRASI for (p,g) We now have a drasi DAQ running for our (p,g)
experiments.
The RIO we have it installed right now is:
  
  123   Sat Mar 21 12:06:50 2020 LaszloGeneralrun61 - SCRAPER moved out we want to see any change on the Silicon count
rate, because we will have now also Rutherford
scattering. 
  
ELOG V3.1.5-fc6679b