ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
6
|
Fri Apr 5 06:05:55 2019 |
Jan | DAQ | making changes to the DAQ | | If you need to add or change a module of the
VME crate you need to follow this proceedure:
|
|
7
|
Wed Jun 5 11:29:13 2019 |
Jan | Detectors | position/channel calib. | | This is the first position calibration done
with the detector installed in the holder.
The goal is to assign rough positions (top/bottom/left/right) |
|
8
|
Fri Jun 7 10:18:23 2019 |
Jan | Runs | prerun001 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun001-root
~2h run
|
|
9
|
Fri Jun 7 13:52:32 2019 |
Jan | Runs | prerun002 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun002
~20min run
|
|
10
|
Fri Jun 7 14:28:09 2019 |
Jan | Runs | prerun003 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun003
~20min run
|
|
11
|
Fri Jun 7 14:39:36 2019 |
Jan | Detectors | Pt100 installation & readout | | The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires. |
|
12
|
Fri Jun 7 15:57:41 2019 |
Jan | DAQ | DAQ with & without MDPP-16 | | The DAQ located in
../esrdaq_2018/r4l-58/
|
|
13
|
Tue Jun 11 10:13:56 2019 |
Jan | Runs | prerun003 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun004
~10min run
|
|
14
|
Tue Jun 25 21:19:50 2019 |
Laszlo | Simulations | MOCADI input parameters | | initial BEAM input parameters for MOCADI are
based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in |
|
Draft
|
Fri Jun 28 14:06:28 2019 |
Jan | General | CAD of (p,g) setup | | |
|
16
|
Mon Jul 8 14:57:07 2019 |
Yuanming Xing | Detectors | The measurement of the tilting angle | | As shown in the figure, the detector is tilted
by a certain angle which is about 45 degree.
|
|
17
|
Tue Jul 9 15:26:59 2019 |
Yuanming Xing | Simulations | Simulated Rutherford scattering distribution on detector | | Simulated Rutherford scattering distribution
on detector
|
|
18
|
Tue Jul 23 10:46:29 2019 |
Laszlo | Analysis | 124Xe pg peak fit using mixed cascade simulation | | This entry is the continuation of the cascade
effects on the pg peak shape entry:
|
7x |
Draft
|
Fri Aug 9 13:14:09 2019 |
Laszlo | | pn channel simulations for 111Sn(p,g)112Sb experiment | | The p,n channel opening for the 111Sn+p reaction
is at 5.8895 MeV/u beam energy. Therefore,
when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam |
|
20
|
Fri Aug 9 13:43:15 2019 |
Laszlo | Simulations | pn channel simulations for 111Sn(p,g)112Sb experiment | | The p,n channel opening for 111Sn beam is
at 5.8895 MeV/u beam energy. Therefore, when
choosing 6MeV/u, 7MeV/u,
|
12x |
21
|
Thu Aug 29 10:02:22 2019 |
Jan | Detectors | bakeout at ESR setup | | The bakeout for our detector setup has started
on the evening of 27.08.2019
We have a temperature sensor in the vacuum |
|
22
|
Wed Sep 25 13:03:46 2019 |
Laszlo | Analysis | simulations on 118Te+p | | I have made some simulations at 8AMeV, 7AMeV
and 4AMeV energies for the main 118Te + p
reaction channels. For the
|
11x |
23
|
Wed Sep 25 13:58:24 2019 |
Laszlo | General | Gamow window energies for 118Te(p,g) | | # Z A Iso Re Rc T9 upper width mxpos
shift
52 118 te118 pg 20 0.5 1.39 0.58 1.06 |
|
24
|
Wed Oct 23 11:40:29 2019 |
Jan | Runs | prerun005 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun005
start: 23.10.19 - 11:40
|
|
25
|
Wed Oct 23 14:51:43 2019 |
Jan, Laszlo | DAQ | VME modules & main.cfg | | Here is the current list of VME modules in
our DRASI daq including HW addresses:
|
|