HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 16 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Yeardown Text Attachments
  6   Fri Apr 5 06:05:55 2019 JanDAQmaking changes to the DAQ  If you need to add or change a module of the
VME crate you need to follow this proceedure:
  
  7   Wed Jun 5 11:29:13 2019 JanDetectorsposition/channel calib. This is the first position calibration done
with the detector installed in the holder.
The goal is to assign rough positions (top/bottom/left/right)
  
  8   Fri Jun 7 10:18:23 2019 JanRunsprerun001 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun001-root

~2h run
 alpha_centered.jpg 
  9   Fri Jun 7 13:52:32 2019 JanRunsprerun002 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun002

~20min run
 alpha_top_left.jpg 
  10   Fri Jun 7 14:28:09 2019 JanRunsprerun003 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun003

~20min run
 alpha_bottom_right.jpg 
  11   Fri Jun 7 14:39:36 2019 JanDetectorsPt100 installation & readout The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires.
 det_connector.pngPt100_readout.JPG 
  12   Fri Jun 7 15:57:41 2019 JanDAQDAQ with & without MDPP-16 The DAQ located in 

../esrdaq_2018/r4l-58/ 
  
  13   Tue Jun 11 10:13:56 2019 JanRunsprerun003 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun004
~10min run
  
  14   Tue Jun 25 21:19:50 2019 LaszloSimulationsMOCADI input parameters initial BEAM input parameters for MOCADI are
based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in
 template.pdfsteck2004.pdf 
  Draft   Fri Jun 28 14:06:28 2019 JanGeneralCAD of (p,g) setup     
  16   Mon Jul 8 14:57:07 2019 Yuanming XingDetectorsThe measurement of the tilting angle As shown in the figure, the detector is tilted
by a certain angle which is about 45 degree.
 TiltingAngle.png 
  17   Tue Jul 9 15:26:59 2019 Yuanming XingSimulationsSimulated Rutherford scattering distribution on detector Simulated Rutherford scattering distribution
on detector
 6MeV.png7MeV.png8MeV.png 
  18   Tue Jul 23 10:46:29 2019 LaszloAnalysis124Xe pg peak fit using mixed cascade simulation This entry is the continuation of the cascade
effects on the pg peak shape entry:
 7x 
  Draft   Fri Aug 9 13:14:09 2019 Laszlo pn channel simulations for 111Sn(p,g)112Sb experiment The p,n channel opening for the 111Sn+p reaction
is at 5.8895 MeV/u beam energy. Therefore,
when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam
  
  20   Fri Aug 9 13:43:15 2019 LaszloSimulationspn channel simulations for 111Sn(p,g)112Sb experiment The p,n channel opening for 111Sn beam is
at 5.8895 MeV/u beam energy. Therefore, when
choosing 6MeV/u, 7MeV/u,
 12x 
  21   Thu Aug 29 10:02:22 2019 JanDetectorsbakeout at ESR setup The bakeout for our detector setup has started
on the evening of 27.08.2019 
We have a temperature sensor in the vacuum
 T_set_bakeout.png 
  22   Wed Sep 25 13:03:46 2019 LaszloAnalysissimulations on 118Te+p I have made some simulations at 8AMeV, 7AMeV
and 4AMeV energies for the main 118Te + p
reaction channels. For the
 11x 
  23   Wed Sep 25 13:58:24 2019 LaszloGeneralGamow window energies for 118Te(p,g) # Z   A   Iso Re Rc   T9 upper width mxpos
 shift
 52 118 te118 pg 20  0.5  1.39  0.58  1.06
 PhysRevC.81.045807.pdf 
  24   Wed Oct 23 11:40:29 2019 JanRunsprerun005 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun005

start: 23.10.19 - 11:40 
  
  25   Wed Oct 23 14:51:43 2019 Jan, LaszloDAQVME modules & main.cfg Here is the current list of VME modules in
our DRASI daq including HW addresses:
 main.cfg 
ELOG V3.1.5-fc6679b