26
|
Wed Oct 23 15:35:29 2019 |
Jan | DAQ | DAQ with & without MDPP-16 | | the DAQ located in
../esrdaq_2018/r4l-58_dev/
|
|
27
|
Fri Oct 25 16:34:51 2019 |
Jan | Runs | prerun007 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun007
start: Fr 25.10.19 - 16:35
|
|
28
|
Wed Nov 6 14:13:53 2019 |
Jan, Laszlo | Detectors | DSSSD - 1st movement - realignment | | We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion |
|
29
|
Fri Nov 15 10:46:12 2019 |
Laszlo | Detectors | Detector movement from HKR | | To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
|
|
30
|
Thu Dec 5 10:57:57 2019 |
Jan, Laszlo | Detectors | setting up the DSSD with beam | | This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
|
|
31
|
Thu Jan 23 16:35:47 2020 |
Laszlo | DAQ | cable documentation | | |
|
32
|
Tue Feb 11 13:20:01 2020 |
Jan | Detectors | BaF2 - HV settings | | with these HV values the 6 channels are roughly
gain matched, such that the 7.83 MeV Po-decay
is around channel 5000. |
|
33
|
Mon Feb 17 08:14:44 2020 |
Jan | Simulations | 118Te K-REC X-ray energies | | X-ray energies of K-REC for 118Te according
to
[URL=http://www-ap.gsi.de/Thomas/ap_html_research/energy/index.php]http://www-ap.gsi.de/Thomas/ap_html_research/energy/index.php[/URL]
|
|
34
|
Fri Feb 21 09:39:40 2020 |
Laszlo | DAQ | cable documentation | | |
|
35
|
Fri Feb 21 11:29:02 2020 |
Laszlo | General | Shift plan | | https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0 |
|
36
|
Fri Feb 21 11:29:59 2020 |
Jan | Detectors | det. distances at target chamber | | This is the lookup table for the distance
of each x-ray detector to the target.
See attched foto for explanation.
|
|
37
|
Tue Mar 10 08:52:34 2020 |
Jan | Detectors | DSSSD positioning | | To find a good Si position, we need to follow
a procedure similar to this:
|
|
38
|
Tue Mar 10 09:41:26 2020 |
Jan | Detectors | x-ray background from BaF | | The BaF2 detectors planned to be installed
at the target induce an additional background
in the x-ray detectors sitting below inside |
|
39
|
Wed Mar 11 09:08:21 2020 |
Jan | DAQ | DAQ & controls - OVERVIEW | | For all DAQ & slow control buissines the user
[COLOR=red][SIZE=3]litv-exp[/SIZE][/COLOR]
|
|
40
|
Wed Mar 11 14:33:44 2020 |
Laszlo | General | beam time manual | | Here you can find the digital version of the
E127 beam time manual. |
|
41
|
Sun Mar 15 09:42:40 2020 |
Jan | Calibration | run030 - Xray90 calib Am241 | | measurement with old tennelec specAmps, do
not use for efficiency!
|
|
42
|
Sun Mar 15 13:08:38 2020 |
Jan | Calibration | run031 - Xray90 calib Ba133 hi-rate | | measurement with old tennelec specAmps, do
not use for efficiency!
|
|
43
|
Sun Mar 15 13:40:11 2020 |
Jan | Calibration | run032 - Xray90 calib Ba133 | | measurement with old tennelec specAmps, do
not use for efficiency!
|
|
44
|
Sun Mar 15 13:52:05 2020 |
Jan | Calibration | run033 - Xray145 calib Am241 | | measurement with old tennelec specAmps, do
not use for efficiency!
|
|
45
|
Sun Mar 15 14:41:34 2020 |
Jan | Calibration | run034 - Xray145 calib B133 high rate -SOURCE MOVED! | | measurement with old tennelec specAmps, do
not use for efficiency!
|
|