  26   Wed Oct 23 15:35:29 2019 JanDAQDAQ with & without MDPP-16 the DAQ located in
../esrdaq_2018/r4l-58_dev/
  
  27   Fri Oct 25 16:34:51 2019 JanRunsprerun007 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun007

start: Fr 25.10.19 - 16:35 
  
  28   Wed Nov 6 14:13:53 2019 Jan, LaszloDetectorsDSSSD - 1st movement - realignment We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion
  
  29   Fri Nov 15 10:46:12 2019 LaszloDetectorsDetector movement from HKR To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
 IMG_20191114_135600.jpg 
  30   Thu Dec 5 10:57:57 2019 Jan, LaszloDetectorssetting up the DSSD with beam This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
  
  31   Thu Jan 23 16:35:47 2020 LaszloDAQcable documentation    cable_documentation_e127.pdfcable_documentation_e127.ods 
  32   Tue Feb 11 13:20:01 2020 JanDetectorsBaF2 - HV settings with these HV values the 6 channels are roughly
gain matched, such that the 7.83 MeV Po-decay
is around channel 5000.
 BaF2_HV_settings.pngbaf_bg_ch1.png 
  33   Mon Feb 17 08:14:44 2020 JanSimulations118Te K-REC X-ray energies X-ray energies of K-REC for 118Te according
to 
[URL=http://www-ap.gsi.de/Thomas/ap_html_research/energy/index.php]http://www-ap.gsi.de/Thomas/ap_html_research/energy/index.php[/URL]
 Photonen_Kammer.pngx-ray_calculator.txt 
  34   Fri Feb 21 09:39:40 2020 LaszloDAQcable documentation    cable_documentation_e127.pdfcable_documentation_e127.ods 
  35   Fri Feb 21 11:29:02 2020 LaszloGeneralShift plan https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0   
  36   Fri Feb 21 11:29:59 2020 JanDetectorsdet. distances at target chamber This is the lookup table for the distance
of each x-ray detector to the target.
See attched foto for explanation.
 Photonen_Kammer.png 
  37   Tue Mar 10 08:52:34 2020 JanDetectorsDSSSD positioning To find a good Si position, we need to follow
a procedure similar to this:
 optimum_detector_position_2.jpg 
  38   Tue Mar 10 09:41:26 2020 JanDetectorsx-ray background from BaF The BaF2 detectors planned to be installed
at the target induce an additional background
in the x-ray detectors sitting below inside
  
  39   Wed Mar 11 09:08:21 2020 JanDAQDAQ & controls - OVERVIEW For all DAQ & slow control buissines the user

[COLOR=red][SIZE=3]litv-exp[/SIZE][/COLOR]
  
  40   Wed Mar 11 14:33:44 2020 LaszloGeneralbeam time manual Here you can find the digital version of the
E127 beam time manual.
 E127_experimental_manual.pdfmanual.odt 
  41   Sun Mar 15 09:42:40 2020 JanCalibrationrun030 - Xray90 calib Am241 measurement with old tennelec specAmps, do
not use for efficiency!
  
  42   Sun Mar 15 13:08:38 2020 JanCalibrationrun031 - Xray90 calib Ba133 hi-rate measurement with old tennelec specAmps, do
not use for efficiency!
  
  43   Sun Mar 15 13:40:11 2020 JanCalibrationrun032 - Xray90 calib Ba133 measurement with old tennelec specAmps, do
not use for efficiency!
  
  44   Sun Mar 15 13:52:05 2020 JanCalibrationrun033 - Xray145 calib Am241 measurement with old tennelec specAmps, do
not use for efficiency!
  
  45   Sun Mar 15 14:41:34 2020 JanCalibrationrun034 - Xray145 calib B133 high rate -SOURCE MOVED! measurement with old tennelec specAmps, do
not use for efficiency!
  