HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 18 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Categorydown Subject Year Text Attachments
  198   Sun Mar 22 17:45:07 2020 LaszloGeneralswitching to primary beam We have finished the measurement with the
fragments.
  
  208   Sun Mar 22 23:19:23 2020 MichaelGeneralESR Vacuum readings    ESR_Vakuum2020-03-22-2318.PNG 
  210   Mon Mar 23 00:13:25 2020 LaszloGeneralSIS and ESR beam currents    2020-03-23_00-09-48-737.png2020-03-23_00-21-43-581.png 
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data Complete ramping cycle recorded from Oscilloscope
Tektronix MSOX2024A.
 Stored as XLS file.
 2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx 
  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky Did Schottky measurements using 5 shots with
and without gas target each
restarting the DAQ
  
  220   Mon Mar 23 03:58:25 2020 ShahabGeneralKicker guy arrived Kicker Guy (U. Blell) arrived in order to
fix modules.
  
  227   Mon Mar 23 07:56:51 2020 LaszloGeneralYuri made magick and we operate again DSSSD was moved out (HV switched off)
also the scraper was mistakenly moved.
  
  232   Mon Mar 23 09:33:11 2020 LaszloGeneralSIS failure again! run096 is stopped   
  233   Mon Mar 23 09:47:05 2020 LaszloGeneralexplanation of an ESR cycle    ESR_cycle.pngIMG_20200323_095144.jpg 
  239   Mon Mar 23 11:32:42 2020 LaszloGeneralSIS went down again run101 is stopped   
  258   Mon Mar 23 18:15:55 2020 LaszloGeneralnoisy 90degree Xray det Uwe found out, that there was some common
ground effect between 90 and 145 degree detectors.
after moving the grounds, we could record
  
  274   Wed Apr 8 23:02:24 2020 LaszloGenerallmd to measurement pairing list I use the following list of lmd files combined
to a single root file for each measurement.
It is very important to highlight that sometimes
 gas_jet_mailfunction.png 
  282   Tue May 19 16:48:15 2020 LaszloGeneralE127 beamtime overview Here is a representation how was the time
management during E127. The time, what we
could spend with measuring the 118Te(pg),
 E127_beamtime_overview.pngE127_beamtime_overview.pdf 
  350   Tue May 18 21:08:16 2021 ESR teamGeneralBeam stacking2021Beam stacking. 3 pulses, stochastically cooled
and stacked on an inner orbit
 5B6943AF-DF56-4B0F-A77E-1E3C65B3B0C0.jpegB590F232-450A-4ACF-BBA4-DB31B7B35FDA.jpeg 
  351   Wed May 19 13:47:26 2021 Jan GloriusGeneralGasTarget Operation2021We have two tasks to take over for the target
operation:
 IMG_20210519_133923186_HDR.jpgIMG_20210519_133629322_HDR.jpg 
  352   Wed May 19 15:09:22 2021 Helmut WeickGeneralFRS settings, LISE file2021Here is a setting plan for FRS and corresponding
LISE files.
2 LISE files still use the old FRS-ESR optics,
 frequencies-E127.xlsxFRS-settings-E127.docx124Xe_ESR_Predrilling.lpp124Xe_118Te_2mmSci_oldmode.lpp124Xe_118Te_2mmSci_newoptics.lpp 
  353   Wed May 19 19:47:14 2021 YuriGeneralBeam Halflife at 30 AMeV2021   2021-05-19_17-35-00_tcl1032_lassie-monitor.png 
  357   Thu May 20 17:31:50 2021 Jan, Laszlo, BeatrizGeneralbeam & target alignement2021beam and target alignement was checked by
looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm
  
  358   Thu May 20 18:11:24 2021 LaszloGeneralTouching the beam with Dsssd - current change2021   IMG_20210520_180857.jpg 
  359   Thu May 20 18:13:55 2021 LaszloGeneralVacuum change while Si movement2021The vacuum remained in the E-10 range after
moving the dsssd. The oscillation in the
vacuum.values are due to the 
 IMG_20210520_174632.jpg 
ELOG V3.1.5-fc6679b