ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
522
|
Fri May 28 14:40:03 2021 |
Jan | Runs | run0175 - BaF calib. 22Na | 2021 | |
|
523
|
Fri May 28 15:15:06 2021 |
Jan | Analysis | 118Te(p,g) counts runs 135 to 174 | 2021 | This is the summary of all Si data collected
at 6 MeV/u until run174 before the Alvarez
problem.
|
|
571
|
Wed Jun 2 09:14:04 2021 |
Jan | General | Telegram Chat Export | 2021 | Attached is the exported Telegram chat.
There is the simple PDF and the zip-file
containing the chat in json-format as well |
|
575
|
Thu Jul 8 13:39:34 2021 |
Jan | Calibration | Electron cooler parameters | 2021 | Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
|
|
576
|
Thu Jul 8 14:07:19 2021 |
Jan | Calibration | beam energies | 2021 | Table of ion energies calculated from cooler
parameters
|
|
578
|
Wed Oct 13 15:09:04 2021 |
Jan | Collaboration | K-REC cross sections A. Surzhykov | 2021 | Attached are the theory K-REC cross sections
as calculated by Andrey Surzhykov (August
2021).
|
|
579
|
Wed Oct 13 15:15:53 2021 |
Jan | DAQ | root-file header for analysis | 2021 | Attached is the header file needed for root
analysis. |
|
335
|
Thu May 13 17:38:13 2021 |
Jacobus Swartz | Calibration | Runlist for X-ray detector calibrations | 2021 | Here is a run summary of all the calibration
measurements performed so far on the three
X-ray detectors. |
|
413
|
Mon May 24 05:20:36 2021 |
Helmut, Yuri, Faraz, Sergey | Accelerator | FRS setup | 2021 | Logbook from start of FRS until 118Te injection |
14x |
352
|
Wed May 19 15:09:22 2021 |
Helmut Weick | General | FRS settings, LISE file | 2021 | Here is a setting plan for FRS and corresponding
LISE files.
2 LISE files still use the old FRS-ESR optics, |
|
497
|
Thu May 27 13:48:18 2021 |
Helmut Weick | Accelerator | FRS wrong status display for one day | 2021 | By checking the log files we realized that
from yesterday 26.05. 13:44 - today 13:05
the FRS degrader was shown as out.
|
|
189
|
Sun Mar 22 14:23:50 2020 |
Esther, Ragan, Michael, Laszlo | Runs | run entry - run084, Uli working with gas jet target | | Uli is still working with gas jet target.
open file : run084
|
|
176
|
Sun Mar 22 09:52:09 2020 |
Esther, Ragan | Runs | run entry - run079 | | open file : run079
beam: 118Te52+
|
|
177
|
Sun Mar 22 10:05:37 2020 |
Esther, Ragan | General | run entry - run079 | | The intensity of beam from SIS is less due
to some issues with UNILAc. |
|
178
|
Sun Mar 22 10:22:27 2020 |
Esther, Ragan | Runs | run entry - run079 | | open file : run079
beam: 118Te52+
|
|
179
|
Sun Mar 22 10:28:27 2020 |
Esther, Ragan | General | run entry - run079 | | The problem at UNILAC seems to have solved
itself. Intensity is returning to normal. |
|
180
|
Sun Mar 22 10:53:36 2020 |
Esther, Ragan | Runs | run entry - run080 | | open file : run080
beam: 118Te52+
|
|
181
|
Sun Mar 22 11:28:02 2020 |
Esther, Ragan | Runs | run entry - run080 | | open file : run080
beam: 118Te52+
|
|
182
|
Sun Mar 22 11:37:37 2020 |
Esther, Ragan | Runs | run entry - run081, Uli working with gas jet target | | Uli is here to work with the gas jet target.
open file : run081
|
|
183
|
Sun Mar 22 12:01:44 2020 |
Esther, Ragan | General | Vacuum problem with SIS | | There is some problem with the vacuum in SIS
and thus data recording is stopped. |
|