Entry  Mon Mar 23 01:17:26 2020, Shahab, General, Life time measurements using Schottky,  
Did Schottky measurements using 5 shots with and without gas target each
restarting the DAQ
Entry  Mon Mar 23 05:55:24 2020, Shahab, Runs, Kicker problem not solved yet,  
no solution to kicker problem. 
Entry  Mon Mar 23 03:58:25 2020, Shahab, General, Kicker guy arrived,  
Kicker Guy (U. Blell) arrived in order to fix modules.
Entry  Wed Oct 13 15:09:04 2021, Jan, Collaboration, K-REC cross sections A. Surzhykov, 2021 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat
Attached are the theory K-REC cross sections as calculated by Andrey Surzhykov (August 2021).

They are done for 118Te52+ on H2 at 7.049 and 6.042 MeV/u as well as for 124Xe54+ on H2 at 7.049 MeV/u.
Entry  Wed May 19 13:47:26 2021, Jan Glorius, General, GasTarget Operation, 2021 IMG_20210519_133923186_HDR.jpgIMG_20210519_133629322_HDR.jpg
We have two tasks to take over for the target operation:

1. We have to refill the blue LN2 bottle on the roof of ESR every morning (see 1st attached foto)
Entry  Wed Sep 25 13:58:24 2019, Laszlo, General, Gamow window energies for 118Te(p,g),  PhysRevC.81.045807.pdf
# Z   A   Iso Re Rc   T9 upper width mxpos  shift
 52 118 te118 pg 20  0.5  1.39  0.58  1.06  -0.01
 52 118 te118 pg 20  1.0  2.27  1.04  1.69  -0.01
Entry  Mon Mar 16 15:15:22 2020, Jan, Calibration, Gamma- and X-ray intensities for efficiency calib,  
Intensities for special gamma or x-ray lines needed for efficiency calibration can be found here:

Entry  Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,  IMG_20200320_222748.jpgIMG_20200320_223424.jpg
Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible. However we could.catch it somehow with Shottky (picture below)
Entry  Thu May 27 13:48:18 2021, Helmut Weick, Accelerator, FRS wrong status display for one day, 2021 drivestat-log.JPG
By checking the log files we realized that from yesterday 26.05. 13:44 - today 13:05 the FRS degrader was shown as out.
TS3ET7US should be at -420.0mm not at -580mm (=out). This 3.26mm Sci is used as a degrader and is essential.
Entry  Mon May 24 17:48:04 2021, Erika, General, FRS shiftplan, name abbreviations and phone list, 2021 FRS_shiftplan.pngFRS_name_abbreviations.PNGFRS_phone_list.PNG
FRS shift plan for this week:
[img]elog:424/1[/img]
Entry  Mon May 24 05:20:36 2021, Helmut, Yuri, Faraz, Sergey, Accelerator, FRS setup, 2021 14x
Logbook from start of FRS until 118Te injection
Entry  Wed May 19 15:09:22 2021, Helmut Weick, General, FRS settings, LISE file, 2021 frequencies-E127.xlsxFRS-settings-E127.docx124Xe_ESR_Predrilling.lpp124Xe_118Te_2mmSci_oldmode.lpp124Xe_118Te_2mmSci_newoptics.lpp
Here is a setting plan for FRS and corresponding LISE files.
2 LISE files still use the old FRS-ESR optics, one the new with S6 focus on slits. 
But this does not make a big difference for the simulation, only dispersion S2-S6 is lower.
Entry  Thu May 27 13:26:35 2021, Jan, Accelerator, FRS degrader failure, 2021 
Maybe, our degrader in FRS was removed by hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
All runs taken in this period have to be double checked!
Entry  Sat Mar 21 12:32:00 2020, Laszlo, General, Estimated target thickness,  
Target thickness must be like 5mm (was measured with a moving thin wire)
The beam thickness is small because of the low intensity
Maybe we hit the target a bit offset --> less rate?
Entry  Sat Mar 21 12:42:21 2020, Ragan, General, Entry to ESR for MCP detector,  
Pierre Michel and Laszlo go inside the ESR for switching on the MCP detector so that the photons from the gas jet and secondary beam interaction can be
seen.
Entry  Mon Mar 23 01:53:59 2020, Shahab, Runs, Empty shots in ESR,  
since about 01:40 AM, there is no beam in ESR. .
stopped data acquisition
OPs are working on it. After searching, OPs decided that something is wrong with ESR.
Entry  Thu Jul 8 13:39:34 2021, Jan, Calibration, Electron cooler parameters, 2021 
Below are the results from the e-cooler voltage offset measurments done by Regina Hess et al. using the voltage divider (VD).

--7 MeV-- 
Entry  Wed Jun 23 12:29:35 2021, Jan, Sophia, Calibration, Efficiency of the x-ray Detectors , 2021 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png
For the x-ray detectors, efficiencies have been measured, before and after the experiment was performed. 
The preliminary results of the determined efficiencies can be seen in the attached plots 
Entry  Tue May 25 07:51:48 2021, Jan, Accelerator, ESR stacking cycle length, 2021 
The full cycle length of ESR with 30 stacks is about 7:45 minutes, out of which 15.5 sec are with target switched ON.
This is without CMB/HTD in parallel.
Entry  Mon Mar 23 06:49:46 2020, Shahab, Runs, ESR kicker also has some problems,  
 