  30   Wed Mar 23 16:16:42 2022 V. HannenDetectorsControl software for XUV and copper mirror detector
Attached you find a manual for the software used to control the movement of the XUV detector and the copper mirror detector. 
The software is also used to set the electrode voltages and coil currents of the XUV detector. 
Attachment 1: Manual.pdf
Manual.pdf Manual.pdf Manual.pdf Manual.pdf
  42   Thu Mar 31 15:53:50 2022 KonstantinDetectorsControl software for XUV and copper mirror detector
> Attached you find a manual for the software used to control the movement of the XUV detector and the copper mirror detector. 
> The software is also used to set the electrode voltages and coil currents of the XUV detector. 

We tested the remote access to the raspberry pi as explained in the manual attached to the original entry of Volker. It was tested from
the linux machine LXG1050. Attached you can find a screenshot of the running program.
Attachment 1: XUV_Cu_GUI.png
XUV_Cu_GUI.png
  145   Fri Apr 8 00:06:37 2022 PatrickLaserConnection to the laser pc
To login to the laser pc use the command

xfreerdp -g 1920x1080 -u atplaser atppc023.campus.gsi.de
  228   Thu Apr 14 12:27:18 2022 Sebastian, MaxDetectorsConnection to XUV / Cu reestablished!
The connection to the XUV and Cu were lost during the nightshift.

The XUV detector was in the park position,
BUT the Cu mirror was in the "Measurement position" (moved in / active).

This could be one of the main problems that we had much lesser ion beam intensity since the UNILAC and SIS18 failures last night.
  208   Mon Apr 11 11:05:35 2022 Sebastian, KristianLaserCheck laser power
we checked the UV laser power at 10:15 am. It was only 8.5 - 9 mJ. Pumping power was 460 mJ, which is the maximum output of the current system. We should change the flashlamps soon
  16   Wed Mar 16 08:31:52 2022 KristianDAQCheck cables and timing
Konstantin and I generated a signal in the Messhütte and sent it to the ESR. 
There, we used a 44m BNC cable that was sufficently long to reach all detectors. 
Our signal was connected instead of the PMT/PD. Hence, it was a roundtrip measurement.
In the Messhütte we checked the delay between the generated signal.

PD North 1460(1)ns
PD South 1455(1)ns
Particle North 1239(1)ns
Particle South 1179(1)ns
UV North 1322(1)ns
UV Middle 1322(1)ns
UV South 1321(1)ns
Cu 1322(1)ns

We also checked the time delay of our cable to the detectors by measuring the reflection of the unterminated cable. 
Function generator to detector: 1520(5)/2 ns
Function generator to scope: 5.1(5) ns
Total: 765(3) ns
  213   Mon Apr 11 22:14:51 2022 Konstantin, SarperLaserChanging of the wavelength range
It is planned to change the scan range of the laser wavelength from 322.41 - 322.0 nm to 322.01 - 321.6 nm @ 4 a.m. 
  25   Mon Mar 21 16:33:23 2022  DAQChanging code of go4
We agreed to indicate changes in the go4 analysis code according to the
following scheme

\\--2022-mm-dd HH:MM comment on the respective change.

Example:

\\--2022-03-16 16:03 Changed variable N_BUNCHES from 4 to 2

This should allow to find the most recent changes by using the search
function of the applied text editor.
  26   Mon Mar 21 17:03:47 2022  DAQChanging code of go4
Correction: Comments in C/C++ start with // , i.e. forward slash

//--2022-mm-dd HH:MM comment on the respective change.


Quote:
We agreed to indicate changes in the go4 analysis code according to the
following scheme

\\--2022-mm-dd HH:MM comment on the respective change.

Example:

\\--2022-03-16 16:03 Changed variable N_BUNCHES from 4 to 2

This should allow to find the most recent changes by using the search
function of the applied text editor.
  184   Sat Apr 9 14:15:44 2022 Kristian, Max, KonstantinDAQChange in LV code
We changed the LV code so that the Cobra Set Wavelength is permanently sent. Before it was only sent once at the beginning of each laser step. This, however, lead to too much data for the LV->MBS server.
This was fixed by inserting a 250 ms wait in LV (in Krypton data VI). Basically, all LV values are now updated every 250 ms, which works fine with MBS
  159   Fri Apr 8 11:02:04 2022 DW, YL, RSS, SL Change h=2 to h=1
After changing to h=1
The frequency manipulation #5: f=242.021487MHz (124th harmonic) [no bunching]
Manipulation #7: f=242.021812 MHz [with bunching]
  147   Fri Apr 8 01:48:57 2022 PatrickDAQBugged Trending plots?
The wavelengths/frequencies shown in the graph in the labview window do not match the wavelengths/frequencies in go4.
Compare the picture which shows an incomplete laser scan although the scans in the labview window are completed (The measurement was started at an 'elapsed MBS time' of 2700s and took 1700s/28min).
However, the displayed time is correct. Only the data seems to be "stretched".

The same is true for the 'XUV anode' detector. The counter in the electronic module is ahead of the displayed count rate in go4.


Additional Note: The 'Cobra set wavelength' plot shows wavelengths which seem to be measured. However, we would expect deterministic setpoints from the software, see picture.
Attachment 1: 2022-04-08_Cobra_set_wavelength.png
2022-04-08_Cobra_set_wavelength.png
  178   Sat Apr 9 04:40:01 2022 PatrickDAQBugged Trending plots?
The problem from yesterday (ID:147) still persists. All the plots (not only the labview stuff) comes in too late in go4. However, the time axis is correct, see picture.
Attachment 1: 2022-04-09_Cobra_set_wavelength2.png
2022-04-09_Cobra_set_wavelength2.png
  64   Sat Apr 2 10:22:21 2022 Rui-Jiu Chen, RaganGeneralBeam is in the ESR
Primary beam is in the ESR now. Markus and the team are tuning the ESR.
  82   Sun Apr 3 18:41:11 2022 Konstantin and RodolfoLaserBeam Position Stabilization
We (Konstantin and I) have optimized the TEM "laser-beam position stabilization".

- I took some pictures (screenshots) about the current setting*.
- In order to be able to move the laser position faster we increase the P-Factor of both stages to 5 (maximum value).
- In "TriggerSignals_f_MRC_04-04-2022" the fast PD defines the origin (t = 0 s).
Attachment 1: MRC_Konfiguration_MitMainAmp_03-04-2022.png
MRC_Konfiguration_MitMainAmp_03-04-2022.png
Attachment 2: MRC-ControllerSetting_03-04-2022.jpg
MRC-ControllerSetting_03-04-2022.jpg
Attachment 3: FG_SettingsMRC_03-04-2022.jpg
FG_SettingsMRC_03-04-2022.jpg
Attachment 4: TriggerSignals_f_MRC_04-04-2022.PNG
TriggerSignals_f_MRC_04-04-2022.PNG
  214   Mon Apr 11 22:33:16 2022 CarstenGeneralBackup of data to the external RAID disks
  199   Sun Apr 10 15:08:42 2022 CarstenDAQBackup of Data from 1rst Scanrange to extrenal RAID1 HDDs
I just performed a backup of all data (+log-Files) that were collected until now to the two RAID HDDs.

For DAQ1: /media/sdc2 - last file 229Thor7889.lmd. Please note, that the naming sceme on DAQ1 is inconsistent - please look for the filenumnbering
For DAQ2: /media/sdd2 - last file 229Th0153.lmd
  89   Mon Apr 4 16:26:04 2022 CarstenDAQBackup Harddisk /External Disk
Since we cannot write on lustre, as a temproal solution two RAID 1 (mirror) USB hard disks  with cpacity 6 TB each are installed.
The disk on the lxg1297 the disk can be accessd at /meida/sdd2
an on the lxg0155 at /media/sdc2
Regular backups should be written to these disks but NOT during data taking.

If we run out of local disk space /data.localx on the machines they could also be used as target for mbs.

Pleae check regularly if there is enough spance on the local disks.
  55   Fri Apr 1 16:46:33 2022 CarstenDetectorsAll pressuzied air drives are tested now and are working properly
All pressuzied air drives are tested now and are working properly
  211   Mon Apr 11 18:46:31 2022 Rodolfo, Sarper and KonstantinLaserAlignment-check
We cross-checked the laser-ion alignment. The horizontal position was optimized. However, 
since the laser beam is much larger than the ion beam, this was not an issue for measurements, which
have been performed during the last shifts.
The modified parameters of the stabilization system are attached.