HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+, Page 3 of 12  Not logged in ELOG logo
ID Date Author Category Subjectdown Text Attachments
  54   Fri Apr 1 15:52:23 2022 RodolfoDetectorsUV PMT SouthThe "Solar Blind PMT" labeled as "PMT South"
has been installed by Simon and Max in the
gas target chamber on a CaF Viewport. The
 PMT_Sued_Target.jpg 
  102   Tue Apr 5 20:58:53 2022 WilfriedLaserTrigger for LaserElectronic for the timing of the laser puls
optimized. The problem with the broad photodiode
histograms is solved.
 TriggerForLaser_05-04-2022.PNGTriggerLaser_Cabling.jpg 
  126   Thu Apr 7 04:48:58 2022   ToDo's for 07.04.Some ToDo's for the next shift:
- Work on  Laser stabilisation 2nd stage
in the ESR
  
  196   Sun Apr 10 08:53:26 2022 Kristian, MaxLaserTiming verifiedtiming is still good.

we checked the relative timing between laser
  
  49   Fri Apr 1 01:57:12 2022 KristianDAQTimingwith bunched primary beam (bunching frequency
1.94070 MHz) we have strong PMT (mid) and
particle detector signal. Time between both
 Particle-PMT_Mid.pngPMT-PD.pngIMG_20220331_235846.jpg 
  119   Thu Apr 7 00:36:36 2022 UweDAQThreshholds and shaping Mesytec for ADC   snapshot3.png 
  209   Mon Apr 11 12:50:22 2022 KristianAcceleratorTh lifetimeWe used the counter to measure the lifetime.
During the 30 min scan time dropped only
slowly. 
 ThLifetime.JPG 
  Draft   Sat Apr 2 01:02:39 2022 Carsten Test measurements with two DAQsWe do two measurements:

One measurement using the 
  
  67   Sat Apr 2 17:47:16 2022 Ken Ueberholz  Telefon, GästehausMy guesthouse phone number: 06159-71-2957   
  146   Fri Apr 8 01:18:51 2022 Ken UeberholzDAQTODO: DAQ improvements For somebody who knows the DAQ1 code: Go4
resets the histograms with each laser step.
Can there be additional histograms where
  
  24   Mon Mar 21 10:46:18 2022 RodolfoDAQTDC & Scaler description channelsFor the First Vuprom we have the following
channel configuration (Stand:21.03.2021).
 Screenshot_TLdaInputDescription_21-03-2022.JPG 
  93   Tue Apr 5 09:39:01 2022 Danyal & YuriAcceleratorStrahl ist wieder im ESR - Schlitz war reingefahrenDer Strahl ist wieder im ESR! 
Angeblich war einen Schlitz, oder sogar 2,
reingefahren worden. 
  
  31   Wed Mar 23 16:58:33 2022 V. HannenDetectorsStatus copper mirror and XUV detectorsOver the past days, the parabolic copper mirror
and XUV detectors haven been prepared and
tested for the upcoming beamtime (see first
 det-overview.jpglaserlab-crate.jpgtrigger-module.jpg 
  202   Sun Apr 10 15:29:53 2022 RodolfoLaserStatus - Laser systemWe have checked the laser system.

- The pump laser has ~ 23Mio shots. The total
  
  51   Fri Apr 1 11:00:41 2022 Rui-Jiu ChenDAQStart NTCAPStart taking data with NTCAP.
Carrier Frequency: 245MHz
IQ rate:5 MSamples/s
  
  98   Tue Apr 5 13:28:06 2022 KristianDAQSpikes in PMT signalOccasionally, we noticed a spike in the PMT
signal. No ions in the ring and at PMT Cu
was not even supplied with HV. Has to be
 spike.png 
  171   Fri Apr 8 22:26:44 2022 PatrickDAQSpike in all detectorsIn the previous shift, there was a spike in
all detectors in the same scan step. Apparently,
this was NOT a resonance since in the next
  
  168   Fri Apr 8 15:45:24 2022 YL Spectrum manipulation 5See attached  IMG_3027.JPG 
  142   Thu Apr 7 16:50:22 2022 KonstantinCalibrationSpacial laser-ion overlapLaser-ion-beam overlap was achieved after
measuring the ion beam positions (compare
[URL=https://elog.gsi.de/esr/E142/83]Entry
  
  167   Fri Apr 8 15:42:20 2022 YuriAcceleratorSlits in the TE lineAt around 15:00, The slits in the TE line
were changed to :
TE4DS5HL -12 mm -> -20 mm
  
ELOG V3.1.5-fc6679b