HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+, Page 10 of 12  Not logged in ELOG logo
ID Date Author Category Subjectdown Text Attachments
  11   Thu Mar 3 13:50:45 2022 RodolfoLaserDye cell cracketThe "20 mm" dye cell used for the Oscillator
and Pramplifier got damage. I supposed it
was produced by the pump beam hitting on
 Cobra_Farbstoffzelle_08-02-2022.jpg 
  179   Sat Apr 9 05:00:11 2022 CarstenGeneralDraft Docs and cheat sheetPlease check the attached files,

and correct or enhance them.
 e142_daq2_cabling.odsDocumentation_for_beamtime_2022_.doc 
  80   Sun Apr 3 13:05:08 2022 CarstenLaserDistance of Partilce detecotrs wr.t. to electron coolerAs of Yuris post in the elog the positions
(Info from H. Weick):
  
  74   Sun Apr 3 10:28:25 2022 Yuri (Helmut Weick)AcceleratorDistance cooler - detectorCalculation from Helmut Weick
Distance e-cooler to particle detectors chamber:
“This is half of ESR plus distance target
  
  8   Thu Oct 14 10:21:46 2021 RodolfoDetectorsDismounting Cu-MirrorWe have dismounted the parabolic Cu-Mirror
at ESR on 13.10.2021 
 AusbauCuSpiegel_2021.jpg 
  32   Thu Mar 24 13:27:47 2022 RodolfoDAQDisk space - LXG1297In our Linux computer (LXG1297: Laser spectroscopy)
we have a Drive with 1.8 TB total disk space.
300 GB are at the moment in use, but I can
 DiskSpace_lxg1297.JPG 
  101   Tue Apr 5 20:16:13 2022 RodolfoLaserDiscriminator for HF reference signalFor the laser trigger we need to generate
a few ns NIM-puls from the HF reference signal.
Therefore we (Wilfried, Konstantin and me)
 CFD_für_HFSignal.jpgDisc_HFSignal_05-04-2022.PNG 
  75   Sun Apr 3 10:35:20 2022 Yuri (Sergey)AcceleratorDipole correctionThe ramp for moving the beam to the central
orbit
To be inserted into manipulation, GE01MU1
  
  141   Thu Apr 7 16:45:10 2022  DetectorsDetector distancesRelativ distances of the detector   20220407_164345.jpg 
  163   Fri Apr 8 14:14:28 2022 KristianDAQDelay of bunch RFThe bunch HF is now fed through a delay to
shift the stop trigger relative to the PMT
signal. The delay generator is placed directly
  
  133   Thu Apr 7 09:23:18 2022 SebastianDAQDAQ1 & DAQ2 - 1kHz and delayed cs removedQuestionable 1kHz and delayed common stop
signals has been removed.
  
  41   Thu Mar 31 13:28:17 2022 Jan GloriusDAQDAQ-2 cabling docunewest version V2 - valid since Mo 04.April
2022
 e142_daq2_cabling.pdfe142_daq2_cabling_V2.pdfe142_daq2_cabling_V2.ods 
  153   Fri Apr 8 08:40:06 2022 SebastianDAQDAQ improvementConcerning ID 146 a new histogram for accumulating
data (no cleaning histograms) can be found
under
  
  172   Fri Apr 8 23:56:07 2022 PatrickDAQDAQ improvementAs requested in ID:146 and ID:147, the laserscan
tab was improved:
[LIST]
  
  122   Thu Apr 7 03:06:15 2022 PatrickDAQDAQ file sizesThe file sizes of DAQ1 (229Thor) and DAQ2
(229Th, "Carstens DAQ") are different.
During 20min of laser scanning DAQ1 saves
  
  140   Thu Apr 7 15:18:25 2022 Danyal & SebastianDAQDAQ channelsWe checked again the cables for both DAQs

(on Carsten's kind request) 
  
  34   Thu Mar 24 17:10:33 2022 CarstenDAQDAQ / MBS VUPROM TDC buffer errorsVUPROM TDC buffer errors potentially due to
long TDC common Stop gate (>1ms from div
200).
  
  72   Sat Apr 2 23:16:55 2022 Carsten Cu mirror and CsI moved in and out of the ringKen tested the Cu-mirror and CsI disk Detector.
They move without a problem and don't scrape
the ion beam.
  
  125   Thu Apr 7 04:10:18 2022 Ken UeberholzDAQCorrected cabling DAQ 2A lot of cables were wrongly or not 
connected to the DAQ 2. 
 20220407_043337.jpg 
  91   Mon Apr 4 19:05:57 2022 CarstenDAQCooler Frequency Signals Ion current not connected until nowUp to now the signals for 
Ion Current
Cooler elctron current
  
ELOG V3.1.5-fc6679b