HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy, Page 4 of 6  Not logged in ELOG logo
ID Date Author Categoryup Subject
  50   Wed May 11 22:45:22 2022 Max, Wilfried, PatrickGeneralscanning wavelength
The scan parameters for the next shift are:

in COBRACONTROL:

increment: 0,005nm

from position: 601,62nm

to position: 601,405nm

These are the wavelengths in air!


The wavelength in vacuum we expect is: 601.832nm

You can check the current wavelength in vacuum on the wavemeter in the LabView GUI.

edit: In the night shift, we checked the scanned vacuum wavelengths in the wavemeter and also checked the expected transition wavelength.
The resonance should be very much in the center of the above mentioned scan range.
The increment corresponds to 4.1 GHz steps. Is this small enough?
  56   Thu May 12 10:21:30 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralNo Beam
There is no beam in the ESR due to some problem in the UNILAC.
Attachment 1: Screenshot_from_2022-05-12_09-21-38.png
Screenshot_from_2022-05-12_09-21-38.png
  57   Thu May 12 11:30:18 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralBeam is back
Beam is back in the ESR.
Attachment 1: Screenshot_from_2022-05-12_10-32-24.png
Screenshot_from_2022-05-12_10-32-24.png
  58   Thu May 12 11:31:11 2022 Simon, Christopher, Shahab, Wilfried, Sebastian, RaganGeneralRuns morning shift

Time SIS-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
11:30 - 8,2e6 223219 497 - 500 8119 - 8119 601.62 - 601.405 0.005 5s 6 after this run we had to give the ESR Group the beam
  59   Thu May 12 12:02:56 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralNo beam
There is no beam in the ESR again.
Attachment 1: Screenshot_from_2022-05-12_11-02-37.png
Screenshot_from_2022-05-12_11-02-37.png
  60   Thu May 12 12:51:30 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralBeam is back
12:50 Beam is back again in the ring.
12:52-until now Kicker problem in the ESR.
Attachment 1: Screenshot_from_2022-05-12_11-51-35.png
Screenshot_from_2022-05-12_11-51-35.png
Attachment 2: Screenshot_from_2022-05-12_12-08-52.png
Screenshot_from_2022-05-12_12-08-52.png
  68   Fri May 13 16:55:58 2022 Danyal, Carsten, Phillip, WilfriedGeneralEnd of E128 Beamtime
Dear all,

unfortunately, the E128 experiment must now come to an early end. 
The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
Several things were tried, but without hope. 

Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 

Best wishes,

Wilfried
  69   Mon May 16 14:20:05 2022 Ragan, Danyal, Carsten, Phillip, Wilfried et al.GeneralE128 Beamtime
> Dear all,
> 
> unfortunately, the E128 experiment must now come to an early end. 
> The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
> Several things were tried, but without hope. 
> 
> Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 
> 
> Best wishes,
> 
> Wilfried

There is beam again in the ESR. The plan is to take beam until tomorrow morning. 
  72   Mon May 16 17:38:38 2022 Max, Danyal, Wilfried, RodolfoGenerallaser bunch timing
We overlapped the laser and ion bunch in the time domain. 
Therefore we delayed the bunching HF in order to see the PMT signal between bin 10 and 22. Before the signal Peak was in channel ~145-5 and difficult to gate on.
Afterwards we also have to shift the laser.
The new values are:

PD NO: 77.5
PD SO: 113
Ion bunch: 16.5 
Attachment 1: timing1605.png
timing1605.png
  91   Mon May 30 19:00:19 2022 CarstenGeneralScraper Settings and Parameters for the last measrements with thick target
old Bunch frequency: 1.98777 MHz

Positions PL devices:
GE01DD2AG -23
GE01DD2IG 3
GE02DD2_G -35
GE02DS3HG 0


The voltages of the particle detectors were set to:
SA_SZ: 1500V
NA_SZ: 750V
But for the primatry beam measurements the detectors were still switched off

Set values for cooler:
SC3: 223513.377 + DeltaU = 160V
SC6: 223452.14 + DeltaU = 130V
SC9: 223452.14 + DeltaU = 130V

Electron current:
SC3: 300mA
SC6: 100mA (300mA in the second file)
SC9: 100ma (300mA in the second file)

Cooling in SC4: 550x
Cooling in SC7: 50x

Explanation of subchains:
SC4: Cooling at injection orbit
SC5: Ramp to central orbit
SC7: Cooling at central orbit
SC8: Scrapers /particle detectors in, XUV detector in, (~10s), bunching on
SC9: measurement
SC10: not used
SC11: Scrapers/particle detectors/XUV ectros out (~10s), bunching off
Attachment 1: screenshot-2022-05-30_19-12-151030168345517073342_(002).png
screenshot-2022-05-30_19-12-151030168345517073342_(002).png
  94   Mon May 30 21:52:08 2022 Wilfried, Danyal, David, RodolfoGeneralPosition of T-Scrapers
We have determined the position of the H-like 208Bi ion beam using the T-Scrapers. The position actually did not change in comparison to the position of H-like 209Bi.

Here we have the values where the beam was "gone"



devicemove in dir.gone (mm) x0 (mm)
GECEDS1VUup 0.7
GECEDS1HAright -22 -4.7
left -13.0
GECEDS2VUup 0.0
GECEDS2HAright -18.5 3.1
left -9.5



Below you can see a screenshot with the settings of the beam stabilization system.
Attachment 1: MRC_208Bi_30-05-2022-10Uhr.png
MRC_208Bi_30-05-2022-10Uhr.png
  98   Tue May 31 15:19:58 2022 Max, Carsten, DanyalGeneralscans for different E-cool currents
until 15:15 we have measured with I_e = 100 mA (3 loops per file) 
E_cool HV = 225255 V 


after that (at 15:26) we changed to I_e = 200 mA (2 loops per file) 
E_cool HV = 225272 V 

after that (at 17:15) we changed to I_e = 50 mA (first 4 then 6 loops per file) 
E_cool HV = 225247 V 
  99   Tue May 31 17:22:09 2022 Max, Carsten, Danyal, Rodolfo, WilfriedGeneralchange E-cooler current I_e = 50 mA
At 17:15 we changed again the E-cooler current I_e = 50 mA  
(4 laser scan loops per injection) 
E-cool HV = 225248 V 
  1   Fri Jul 30 10:21:27 2021 RodolfoLaserKink
The laser beamline in the ESR north arc has a knik, therefore the laser beam can not get the "laser tower" in the north east arc. This path is used to get the laser beam up to the electron-cooler side, such that the laser beam co-propagates the ion beam.

In order to try fix this, Markus suggested to get in contact with Herr Kredel (Groß Montage). He will be back from holidays on August 11th (2021).
Attachment 1: Laser_beamline_ESR_NordBogen.jpg
Laser_beamline_ESR_NordBogen.jpg
  2   Fri Apr 22 09:38:24 2022 RodolfoLasergetting ready for Fluorescein548
We are going to change dye. Therefore I have take out the DCM-dye-solution* out of the dye circulators, rinsed them with Ethanol (5 times) and put new filters.

* This was a solution of 0.3 g/l in 1:1 solvent mixture of Ethanol and DMSO.
  3   Mon Apr 25 18:47:12 2022 RodolfoLaserNew dye circulators
I have put into operation the new circulators (SN. 182231, 182201) for our dye laser (the Cobra). I have rinsed them with pure Ethanol first and I have not seen any leaks.

The idea is to use these circulators with either Pyrromethene 597 or a combination of (Rhodamin B + Rhodamin 101).

The "old circulators" (SN. 104830, 104801) will be used together with (Fluorescein 27 + NaOH).
Attachment 1: Neue_Cobra-Farbstoffpumpe.jpg
Neue_Cobra-Farbstoffpumpe.jpg
  4   Mon Apr 25 21:47:28 2022 RodolfoLasergreen instead UV
I am exchanging the optical elements (mirrors and lenses) for the laser spectroscopy on bismuth. At some places I am also exchanging the 3"-mirror holders and installing 2"-mirror holders instead.

* Just in case. The "nice" laser profile comes from a laser pointer from Thorlabs (CPS532). The Cobra is still under construction.
Attachment 1: Libelle_Umtausch_GrüneOptik.jpg
Libelle_Umtausch_GrüneOptik.jpg
Attachment 2: Umtausch_Spiegel_2statt3.jpg
Umtausch_Spiegel_2statt3.jpg
  7   Fri Apr 29 21:18:12 2022 Rodolfo & MaxLaserFluorescein 27, Rh 610 + Rh 640
We (Max and Rodolfo) have tested the dyes. I have prepared the dye-solutions according to the recipes given in Sirah's User Manual.

The seed energy for the Cobra was 520 mJ @ 532 nm. The output energy after the Cobra's main amplifier was:

Fluorescein 27 (to be used for 208Bi):

Wavelength [nm] Energy [mJ]
54558
54864
55062
55558
56051


Rhodamin 610 + Rhodamin 640 (potential candidate to be used for 209Bi):

Wavelength [nm] Energy [mJ]
60065
60598
610104
615103
62097
62582


* All values averaged over 500 laser pulses.
  9   Wed May 4 22:55:37 2022 Rodolfo, SebastianLaserFCU / Temp Control Bug
We found a "Bug" in the control of the Sirah dye system.

Due that we don't use the FCU and the temperature control unit we could not start the Sirah software without getting numerous errors. 
The fix was to plug in the BBO oven again, move the FCU to "origin", than move to a specific location that the FCU goes in an "idle" mode. 
Than the Sirah software can be started again without getting erros. 
  10   Wed May 4 22:56:22 2022 Rodolfo, Sebastian, KonstantinLaserLaser step complete, scan complete fixed
"Laser step complete" and "laser scan complete" are working again.

Problems:
1) Connections were wrong in the Software. 
2) Sometimes the connection to "laser scan complete" was lost (Wackelkontakt).
3) The VI was initialized with the wrong LabJack Channels.

Now:
1) fixed connections in the software.
2) switch to an other "channel" of the LabJack device for "laser scan complete".
3) The channels in the Cobra VI are for...
laser scan complete -> Channel 5
laser step complete -> 6

We definetely should keep an eye and check frequently the signals, that we do not have a lost connection (Wackelkontakt) again of these 2 channels.
ELOG V3.1.5-fc6679b