87
|
Mon May 30 02:33:45 2022 |
Patrick, MBS Max | DAQ | MBS procedure | It is possible to keep go4 running now. Summary
of the procedure:
|
|
106
|
Wed Jun 1 00:16:02 2022 |
Konstantin, Simon | DAQ | Timing 209Bi thick target | Timing for the final measurements on 209Bi
was determined for the new frequency 1.93777MHz.
Peak positions are
|
|
6
|
Tue Apr 26 18:15:19 2022 |
Rodolfo | Detectors | XUV-Detector and Cu-Mirror | Concerning the moveable detectors:
- I have switched off the power supply and |
|
14
|
Fri May 6 16:29:03 2022 |
Simon, Patrick | Detectors | PMT preparation | We changed PMT north and PMT south and tested
them at 1500 V.
|
|
19
|
Mon May 9 16:58:41 2022 |
Carsten | Detectors | Voltage particle dectectors NA_SZ und SA_SZ switched on | Voltage SA_SZ (capture behind cooler): 1500
V (thin plastic scintillator)
Voltage NA_SZ (capture behind target): 750V |
|
29
|
Tue May 10 20:35:42 2022 |
Phillip, Wilfried, Max | Detectors | PMT Threshold | Since we have ions in the ring now, we looked
at the PMT thresholds and the widths. In
order to do so we looked at the Raw Signal |
|
45
|
Wed May 11 18:00:40 2022 |
Wilfried, Phillip, Max | Detectors | double PD NO peak problem solved | In entry 36 one finds an additional PD NO
peak around bin 100.
This was caused by signal reflection in the |
|
51
|
Wed May 11 23:34:39 2022 |
Patrick, Carsten | Detectors | Particle Detectors / Scraper positions | Voltages of particle detectors off.
Scraper positions:
|
|
77
|
Mon May 16 22:57:40 2022 |
Patrick, Kristian, David, Ruijiu | Detectors | Switched off nitrogen | Background counts with nitrogen and air.
Less multiphoton events with air (see pictures,
histogram extended to 30 with nitrogen).
|
|
80
|
Tue May 17 10:38:44 2022 |
Konstantin | Detectors | PMT North changed | PMT located at the northern window was again
replaced by the narrow-band PMT (ET Enterprise
type 9423 SB, SN: 650). |
|
85
|
Mon May 30 01:13:40 2022 |
Konstantin, Max, Patrick | Detectors | XUV-Detector voltage off | XUV-Detector shows up to 100 kHz and, therefore,
was turned off. |
|
88
|
Mon May 30 08:35:41 2022 |
Kristian, Simon, Ken, Ragan | Detectors | Changed PMT North | We did not see any signal at PMT North which
was the narrowband PMT. Changed it to the
old solar blind PMT. Now we see the resonance. |
|
89
|
Mon May 30 09:28:43 2022 |
Ken, Kristian, Simon, Ragan | Detectors | XUV-Detector | 9:27 XUV-Detector is running again.
-5V cathode, 8A main coil, 2.4A sec.coil
|
|
101
|
Tue May 31 19:37:30 2022 |
Carsten, Max, Wilfried | Detectors | SASZ and NASZ voltages switched off | SASZ and NASZ voltages were switched off bevor
we went back to 209Bi. Laser beam stabilization
turned off. |
|
103
|
Tue May 31 21:08:04 2022 |
Carsten, Max | Detectors | XUV detector automation off | We deactivated the automation of the XUV detector.
It stays out now. |
|
109
|
Fri Jun 3 12:01:17 2022 |
Danyal | Detectors | switched off XUV detector on 1 June ~17:00 | I have switched off the XUV detector on 1
June at about 17:00.
The high voltages of the MCP (in ESR laser |
|
17
|
Mon May 9 11:45:57 2022 |
Wilfried, Jon, Sebastian | General | HV Divider position & DMM calibration | We performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
|
|
34
|
Tue May 10 23:53:42 2022 |
Rodolfo | General | shift change | The night shift took over. They are trying
now to overlap the ion and laser beams. |
|
41
|
Wed May 11 07:28:39 2022 |
Simon, Christopher, Shahab | General | DAQ Loop for shifters | Procedure:
- Scanning phase ends (on LabView wait until |
|
48
|
Wed May 11 22:04:30 2022 |
Phillip, Wilfried, Max | General | spacial laser - ion overlap verified | After the SIS/ESR optimization we checked
the spatial overlap with the T-scrapers again.
|
|