HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025, Page 1 of 5  Not logged in ELOG logo
Entry  Fri Apr 25 15:45:39 2025, Jan Glorius, DAQ, DR DAQ - MBS & Go4 
The DR DAQ is located in AP Messhuette, here is the basic info.

[H2]MBS[/H2] 
Entry  Wed Apr 30 19:59:18 2025, Carsten, DAQ, DR_DAQ 
       enum{TRIG_INJECTION=1, 
    TRIG_NEWRAMP=2, 
    TRIG_NEWVOLTAGE=3, 
Entry  Mon May 5 11:29:28 2025, Rodolfo, Simon, Nils, Volker, Detectors, PMTs SolarBlind_ET_9422_SN1042.pdfThornEmi_PMT9422A_SN1001_(1987).pdfPMT_Arrangement_Libelle2025.jpgPMT_R1017_Configuration_Beamtime2025.png
These are the PMTs installed at the optical detection region:

[TABLE border="1"]
Entry  Mon May 5 16:26:07 2025, Carsten, DAQ, DR Computer Names and IPs 
Computers used for control of HV amplifiers and DR microcontrollers are
[LIST]
[*] main control (big Philips monitor): sadpc058.gsi.de - 140.181.98.68
Entry  Mon May 5 21:13:29 2025, Rodolfo, Laser, Collimation of laser beam Cobra593nm_Laserbeam_Collimation_2025-05-05.JPG
Here some parameters for the collimation of the laser beam

Periscope: 
Entry  Tue May 6 15:35:12 2025, Rodolfo, Konstantin, Laser, MRC Settings MRC_Settings_Cobra593_VolleLeistung_2025-05-06.JPGMRC_Controller_Settings_2025-05-06.jpgAFG3202C_Settings.jpg
Following settings (P-Factor, Directions and Bandwidth) are used for the laser beam stabilization. Full energy (ca. 150 mJ @ 593 nm).

The triggers for the MRC are generated by AFG3102C. The settings (the same for both CH1 and CH2) are saved under "Abrufen / Setup2"
Entry  Wed May 7 14:02:58 2025, Konstantin, DAQ, DAQ Folder 
The folder of the data acquisition are:

[B]Go4[/B] (atplaser@lxg1297):[B] ~/go4/drals[/B]
Entry  Wed May 7 17:29:19 2025, Rodolfo, Simon, DAQ, Fast Photodiodes FastPD-Signals_Messhütte_2025-05-07.jpg
Signal for the fast photodiodes. The laser beam
[LIST]
[*] enters at the Nord-Ost (NO) Arc and
Entry  Wed May 7 20:31:52 2025, Carsten, DAQ, DRALS cabling (DR part) 
[B] Green Corner, patch panel to ESR[/B]
All signals from/ to ESR TTL 5V.
Signals are GND decoupled with grey boxes! Don't use the signals directly.
Entry  Thu May 8 10:11:37 2025, Carsten, General, Schottky spectrum ( 2 Harmonics) from the earlier 209Bi80+ Libelle run (thesis C. Trageser) Schottky_Libelle_on_209Bi80.png
 
Entry  Thu May 8 10:21:10 2025, Carsten, , Link to thesis of C. Trageser NTCAP/ Automated Schottky analysis of cooler voltage and space charge) 
The thesis of Christian might be helpful w.r.t. to energy calibration as it shows how to link Schottky frequency to ion energy (might be required since
in DRALS the exact ion energy will be difficult to derive from voltage measurements only).
Cf., chapter 6  (thesis is in German)
Entry  Thu May 8 13:33:13 2025, Rodolfo, Simon, Laser, Camera @ South-West Screen Laserbeam@SW-Screen_2025-05-08.JPG
Network camera to monitor the position of the laser beam after the electron cooler.  
[B]
apdev017.gsi.de
Entry  Thu May 8 17:23:51 2025, Shahab, General, Schottky TV 
setup Schottky TV:

connect to atppc030 using:
Entry  Thu May 8 19:35:18 2025, Simon, , PMT count rates 
I tested the PMTs and tried to reduce the background signal as far as possible.

[TABLE border="1"]
Entry  Thu May 8 22:50:37 2025, Carsten, DAQ, Preliminary Timing Settings 
Tentatively:

[B]DAC:[/B]
Entry  Thu May 8 23:36:19 2025, Konstantin, DAQ, Fileserver MBS_SshowAcq.png
To save files, the rfio-server must be started on lxg1297 in the folder /data.local2/BiDrals/. The file structure is

[B]/data.local2/BiDrals/208Bi_XXX.lmd[/B]
Entry  Fri May 9 00:56:07 2025, Konstantin, DAQ, First Files  
Files 91 + 92 were recorded with the Trigger logic as explained in [URL=https://elog.gsi.de/esr/E0038/15][COLOR=blue][B]ID 15[/B][/COLOR][/URL]. The laser
was scanned from 593 to 592 in 101 steps. 100 laser steps were accumulated at each step. Bunching HF was synthesized by an AFG with a frequency of 1.787327MHZ
and divided by 89
Entry  Fri May 9 14:21:18 2025, Rodolfo, Accelerator, T-Scrapers Scrapereinstellung_am_ESR.pdf
Information about the T-Scrapers at the ESR Electron Cooler. The width of the scraper is approx. 9 mm.

There was some issue about the Scraper GECEDS2VU. Herr Boywitt solved this issue and shortly communicated the procedure about how to move it. 
Entry  Fri May 9 17:47:07 2025, Konstantin, DAQ, HV Divider  
The HV voltage applied at the high-voltage platform of the electron cooler can be observed at [URL=https://lxyrpc01.gsi.de/grafana/d/bec8zc1424agwc/esr-electron-cooler-voltages?orgId=1&from=now-5m&to=now&refresh=5s]HV-divider[/URL].
Entry  Fri May 9 18:34:08 2025, Konstantin, DAQ, Important diagnoses of analysis parameters QSwitchDiagnose.pngSetConditions.pngMHzScaler.pngMHZWinC.pngSetParameters.png
The filling of some histograms in the go4 analysis framework is controlled by the SetParameters.C and SetConditions.C files.

The WinC conditions are applied to all histograms under the folder [B]"Analysis/Histograms/0_Raw/Scaler"[/B]
ELOG V3.1.5-fc6679b