Entry  Thu May 15 00:45:19 2025, Carsten, DAQ, DRALS preliminary timing settings (DR part) 
[B]DAC control on sadpc115[/B]
[LIST]
[*] Total measurement window: 600 001 ms (10 min + 1ms)
Entry  Thu May 15 02:14:17 2025, Rodolfo, Konstantin, Simon , Laser, Laser broken IMG_1716.jpg
The pump laser is broken!

To be more specific the YAG crystal looks cracked (see att.) and we don't have a spare one.
Entry  Thu May 15 02:34:30 2025, Dimitrios, Konstantin, Simon, Accelerator, Ion beam position 
We measured the ion beam position with the T-scrapers. Not that the blades are 8mm wide, which must be considered to calculate the central beam position
where the laser must be aligned to.
Entry  Thu May 15 13:40:47 2025, Carsten, Runs, DR run DC with 300mA and very fine stepwidth 
Just changed settings towards a new scanning range and bunched beam.
NTCAP, now: IQ_2025-05-15_12-00-29
new ADC file
Entry  Fri May 16 03:19:23 2025, Dimitrios, Finn, Konstantin, Accelerator, Changed settings to DRALS setup 
Switched to bunching: Ring HF Bucket_fill(RF_manipulation)(SC7,BP2) changed from [3.0, 0.0] -> [3.0, 3.0]
Injections 5 | Breeding 30
Entry  Fri May 16 03:22:05 2025, Carsten, Dimitrios, Konstantin, Calibration, DR scan and HV Calibration against Schottky frequency (NTCAP) 
DR scan and HV Calibration against Schottky frequency (NTCAP).
Since DR measurements are presently running with DC beam we can easily do a calibration of cooler voltage against Schottky frequency at the end of the
DR scan.
Entry  Fri May 16 04:56:51 2025, Finn, Konstantin, Dimitrios, Runs, Night shift DR runs 
We conducted some more DR runes in this night shift at I_el = 300mA:

[TABLE border="1"]
Entry  Fri May 16 08:01:27 2025, Finn, Konstantin, Dimitrios, Detectors, Schottky channels 
1kHz read out trigger NTCAP

DC Trafo --> B1 SRC1
Entry  Fri May 16 08:19:00 2025, Danyal, Christopher, Hendrik, Runs, morning shift DR runs 
We are continuing taking more DR runes in the morning shift at I_el = 300mA:

opened new file
Entry  Fri May 16 11:09:38 2025, Danyal, Christopher, Laser, laser damage No_1.jpgNo_2.jpgNo_3.jpgNo_4.jpg
here are some pictures of the laser damage 

The Innolas technician is here now. 
The new crystal has arrived (Wilfried just delivered it). 
The old
crystal broke because of overheating. 
Entry  Fri May 16 15:25:54 2025, Rodolfo, Christopher, Laser, Pumplaser 
The pump laser is back into the operation. 

Output energy @ 532 nm: 690 mJ
Entry  Fri May 16 18:37:32 2025, Rodolfo, Carsten, Wilfried, Zoran, Ragandeep, Nils, Laser, Timing Screenshot_2025-05-16-18-31-35.png
After some minor adjustments for the laser done by Rodolfo, the laser is back 
at ESR and visible by the PD-SO.
We checked the timing between the cooling signal of the e-cooler and the 
Entry  Fri May 16 19:22:43 2025, Carsten, DAQ, New vlaues for DRALS  
The Timing for DRALS has changed to a 12 min measurement window (max time for laser scan). The duration of the laser ramp planned to be 10 min. So we have
2 mins to openfile / closefile etc.
Entry  Fri May 16 21:23:44 2025, Ragandeep, Rodolfo, Zoran, Nils, Accelerator, Ion and laser beam position screenshot-2025-05-16_21-44-5912125648191471033043.png
We checked the ion beam position as well as the laser position with the two scraper in front (north) of the e-cooler (GECEDS1VU, GECEDS1HA) and after (south)
the e-cooler (GECEDS2VU, GECEDS2HA). The values for the ion beam slightly changed in comparsion to the mesasurment performed in [URL=https://elog.gsi.de/esr/E0038/65]ELOG
65[/URL].
Entry  Fri May 16 22:15:33 2025, Ragandeep, Rodolfo, Zoran, Nils, Laser, Scan range laser 
The scan range according to Wilfried should be

593.15 nm - 592.55 nm
Entry  Fri May 16 22:50:00 2025, Ragandeep, Rodolfo, Zoran, Konstantin, Nils, Laser, Timing Laser + Ion Timing_208_DRALS.png
We adjusted the delay of the laser according to the signal of the PD and the PMTs.
Entry  Fri May 16 22:55:36 2025, Dimitrios, Finn, Konstantin, Laser, Starting first laser scan 2025-05-16_23-14-28-051.png
NTCAP file name: SC_2025-05-16_22-54-39

We are starting now the laser scans. Therefore we changed the HV offset voltage back to 880V. 
Entry  Sat May 17 08:36:20 2025, Wilfried, Christopher, Kristian , Laser, Laser Scans in coasting beam 
switched to coasting beam
bucketfill (RF manipulation) (SC7, ...): [[3.0],[3.0]] ---> [[3.0],[0.0]]
Entry  Sat May 17 11:57:13 2025, Wilfried, Christopher, Kristian, Laser, Scans with bunched beam 
switched to bunched beam
bucketfill (RF manipulation) (SC7, ...): [[3.0],[0.0]] ---> [[3.0],[3.0]]
Entry  Sat May 17 21:06:52 2025, Rodolfo, Christopher, Kristian, Laser, New dye 
We have exchanged the dye laser and filled the dye pumps with fresh dye. We also noticed that the seeder was off, we turned on again and set the pump energy
to 350 mJ (at 532 nm).