HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+ 2024, Page 2 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject Text Attachments
  30   Fri Jun 7 11:14:04 2024 RodolfoLaserTrigger-signal for MRCWe are using a 2-Channel Function Generator
(from Textronik) to generate the trigger
signal for the MRC Beam Stabilization. 
 MRC_TriggerSignal_T1_06-06-2024.jpgMRC_TriggerSignal_T2_Tmin_06-06-2024.jpgGeneratorSettings_for_MRC_06-06-2024.jpgMRC_Parameters_06-06-2024_18-30.JPG 
  31   Fri Jun 7 15:29:50 2024 RodolfoDetectorsStored beam @ ESROne of the first PMT signals from the stored-ion
beam @ ESR
 Storedbeam@ESR_2024-06-07_15-25-18.png 
  78   Sat Jun 15 03:46:34 2024 Night shiftAcceleratorGSI downAll quadrupole and dipole magnets at SIS and
ESR are out of order. Repairs can be expected
earliest tomorrow evening. No shifts will
  
  61   Thu Jun 13 12:05:31 2024 Konstantin, Peter, JonasAcceleratorRF-amplitudeTo realize the shortest bunches possible,
we check the bunch length as a function of
two different bunching amplitudes. With the
 Bunching80mA_BucketFill_10.pngBunching80mA_BucketFill_08.png 
  76   Fri Jun 14 13:14:29 2024 Konstantin, Bernhard, Peter, LukasGeneralDAQ crashes at :1010 Minutes past a full hour (XX:10) the windows
PCs (sometimes) loose connection.
This causes the labview server & the laser
  
  49   Wed Jun 12 12:12:44 2024 Konstantin Mohr, Julien Spahn, Jonas Koedel, Bernhard MaassAcceleratorFirst Scraper ScanThorium is in the ESR, we have time to check
the beam position with the scrapers.
Beam Intensity in the ring 6E-5
 SpatialBeamOverlap.png 
  73   Fri Jun 14 06:38:41 2024 Konstantin Mohr, Bernhard Maass, Peter Micke, Lukas Kau, Dounia BoudeflaRunsMorning runsVery successful shift, no crashes until 11:10
Previous night shift had problems with the
pulse laser starting around 3am.
  
  20   Thu Jun 6 07:12:49 2024 Konstantin MohrLaserT-ScraperThe T-Scrapers can be driven by DeviceControl,
which must be started from a console. To
do so, first open the app-launcher and then
 6x 
  24   Thu Jun 6 09:23:53 2024 Konstantin MohrDAQTimingThe best way to adjust the bunch-laser timing
is to start go4 (mbs must be running) from
atppc023. Therefore use x2goclient and use
 TimingSSH.pngDualTimer.jpegTimingAdjustment.JPG 
  59   Thu Jun 13 10:32:29 2024 KonstantinAccelerator(Proper) Cooler settingsWe change the acceleration voltage of the
electron cooler and observe the platform
high voltage and the count rate at the particle
  
  41   Tue Jun 11 09:17:46 2024 Julien, Konstantin, LukasDAQImportant commands (DAQ1)To connect to the DAQ1 pc, open a terminal
and type:
 ssh atplaser@r4l-41
 SSH_Connection.pngMBS_Start.pngDAQ1_startup.pngRates.pngBildschirmfoto_2024-06-11_10-01-38.png 
  43   Tue Jun 11 21:38:35 2024 Julian, Imke, RodolfoLaserWavemeter HeNe long time stabilityThe HeNe was running over night and the measured
laser frequency of the wavemeter was logged,
see picture.
 HeNe_LangeMessung_11-06-2024.JPG 
  42   Tue Jun 11 21:23:11 2024 Julian, ImkeGeneralHow to read out voltage1.) If not already opened, open the Medusa
Laser Control software, see picture:
2.) In the "view" submenu, choose "proteus
 medusa1.JPGmedusa3.pngmedusa4.png 
  51   Wed Jun 12 17:12:13 2024 Julian, Danyal, RodolfoLaserTiming für 229Th89+We did the timing Ion-Beam Laser-beam time
overlap. 
 Timing_229Th89_12-06-2024.JPG 
  69   Thu Jun 13 18:23:46 2024 JulianLaserRestarting the laser controllerIf the laser controller is locked up again,
the little display will show an error message
after an attempted medusa scan.
  
  1   Tue Apr 16 14:42:37 2024 JanGeneralG-PAC Proposal   G-22-00052.pdf 
  4   Mon May 27 13:37:31 2024 JanDAQMesyTec Shaper ControlFor the 2nd DAQ the MesyTec Shaper ([URL=https://elog.gsi.de/esr/NucAR+lab/230418_110112/MesyTec_MSCF16-F-V.pdf]MSCF
manual[/URL]) is used as a spectroscopy amplifier
and CFD.
 Screenshot2_MSCFGUI.pngScreenshot3_MSCFGUI.png 
  72   Thu Jun 13 22:08:07 2024 DayshiftAcceleratorProblems with Accelerator?It seems to be that there are some problems
with the injections in the ESR.
The last 2 accumulation cycles showed that
 IMG_6064.jpgIMG_6065.jpgIMG_6066.jpg 
  2   Tue Apr 16 16:28:21 2024 DanyalGeneralGreatThanks Jan!   
  Draft   Thu Jun 6 07:54:15 2024 DanyalGeneralpressure gauges and ion pumps yesterday (05.06.2024), firstly, the two ion
pumps (underneath the fluorescence chamber)
were switched off by the vacuum group (Björn
  
ELOG V3.1.5-fc6679b