HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025, Page 1 of 1  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subjectdown
  4   Wed Jun 4 16:18:57 2025 Rodolfo, SimonDetectorsPMT dark count rates
I adjusted the offsets of the amplifiers in the cave and measured the dark count rates :

PMT Model Operation Voltage Count rate (Hz)
South ET9422B Broadband -1500 V 1300
Middle ET9423B Smallband -2650 V 20
North ET9423B Smallband -2650 V 30



Also the MCP anode of the XUV detector is now connected to the amplifiers and fed to the data cable of "PMT Cu".




Quote:
This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025


PMT Model SN Operation Voltage Threshold
South ET9422B 1042 Broadband -1500 V
Middle ET9423B 653 Smallband -2650 V 10 (preliminary)
North ET9423B 652 Smallband -2650 V 12 (preliminary)
  1   Tue May 20 16:14:30 2025 Rodolfo, SimonDetectorsPMT arrangement at ESR
This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025


PMT Model SN Operation Voltage Threshold
South ET9422B 1042 Broadband -1500 V
Middle ET9423B 653 Smallband -2650 V 10 (preliminary)
North ET9423B 652 Smallband -2650 V 12 (preliminary)
Attachment 1: PMT_Arrangement_2025-05-20.jpg
PMT_Arrangement_2025-05-20.jpg
  3   Wed Jun 4 16:17:47 2025 SimonDetectorsNitrogen
The nitrogen supply for the PMTs is turned ON.
  2   Mon Jun 2 16:36:57 2025 CarstenDetectorsMesycontrol
ssh -Y litv-exp@x86l-204
'mesycontrol'
Attachment 1: MSCF16-F-V.pdf
MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf MSCF16-F-V.pdf
ELOG V3.1.5-fc6679b