HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 1 of 9  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  4   Fri Dec 7 10:56:04 2018 Jan GloriusSlowControlEPICS ioc on raspberryWe have an EPCIS server (ioc) running on our
raspberry (ext-027377). It talks to our MesyTec
modules (MSCF shapers, MHV4 high-voltages).
  
  5   Fri Dec 7 11:39:41 2018 Jan GloriusSlowControlGUI for remote control of MSCF+MHV4We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
  
  8   Tue May 7 15:52:47 2019 Chen, SidhuSlowControlGUI for remote control of MSCF+MHV4 [detailed]We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
 000000000003.png 
  35   Sat Mar 28 13:19:56 2020 RaganRunsTemplatebeam: 
energy: 
storage time:
  
  48   Sun Mar 29 11:12:00 2020 RaganRunsstart run e121_run_0239.lmd Sergey and Yuri are tuning Tl beam. The particle
number in ers is about 1e4. I(SIS)=5e8
  
  50   Sun Mar 29 13:04:32 2020 Ragan, RuiJiuRunsrun file: 1298The Tl fragments are being stacked (almost
~20 staacks) and tried to store nicely in
ESR.
 61308F61-2C4C-4651-8C74-608E4E585B14.jpegEB5CA42A-B8DC-4892-8357-9006A1C3BAC0.jpeg 
  56   Sun Mar 29 18:55:19 2020 ShahabRunsFrequency list for identificationHere are some frequencies for identification
of the fragments.
 freqs.jpg 
  59   Sun Mar 29 21:34:46 2020 RaganRunsFirst runbeam: 206Pb81+
energy: 400 MeV/u
  
  63   Mon Mar 30 00:32:32 2020 RaganRunsFirst measurement with 206Pb81+ beambeam: 206Pb81+
energy: 400 MeV/u
  
  64   Mon Mar 30 01:01:53 2020 RaganRunsFirst measurement with 206Pb81+ beambeam: 206Pb81+
energy: 400 MeV/u
  
  66   Mon Mar 30 01:25:57 2020 RaganRunsFirst measurement with 206Pb81+ beam01:17 Problem with SIS is solved
01:19 run start 0258.lmd
  
  68   Mon Mar 30 02:00:46 2020 RaganRunsFirst measurement with 206Pb81+ beam
beam: 206Pb81+
energy: 400 MeV/u
  
  69   Mon Mar 30 02:27:44 2020 RaganRunsSecond measurement with 206Pb81+ beam at I_cooler = 200 mA I_cooler = 200 mA

beam: 206Pb81+
  
  71   Mon Mar 30 02:58:51 2020 Sergiy, DimaRunsSecond measurement with 206Pb81+ beam at I_cooler = 200 mA I_cooler = 200 mA

beam: 206Pb81+
  
  72   Mon Mar 30 03:30:03 2020 Sergiy, DimaRunsSecond measurement with 206Pb81+ beam at I_cooler = 200 mA I_cooler = 200 mA

beam: 206Pb81+
  
  73   Mon Mar 30 04:00:19 2020 Sergiy, DimaRunsSecond measurement with 206Pb81+ beam at I_cooler = 200 mA I_cooler = 200 mA

beam: 206Pb81+
  
  75   Mon Mar 30 04:30:17 2020 Sergiy, DimaRunsSecond measurement with 206Pb81+ beam at I_cooler = 200 mA I_cooler = 200 mA

beam: 206Pb81+
  
  76   Mon Mar 30 06:15:13 2020 RaganRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA I_cooler = 20 mA

beam: 206Pb81+
  
  78   Mon Mar 30 06:30:52 2020 RaganRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA I_cooler = 20 mA

beam: 206Pb81+
  
  80   Mon Mar 30 07:02:15 2020 tinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA I_cooler = 20 mA

beam: 206Pb81+
  
ELOG V3.1.5-fc6679b