HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Bound beta decay experiment on Tl-205, Page 6 of 9  Not logged in ELOG logo
Entry  Mon Apr 6 05:28:55 2020, Ragan, Laszlo, Nikos, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) 46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpegC55A1803-E814-412F-B3DC-40FE24946F8A.MOV75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg2020-04-06_05-40-47-352.png
Entry  Mon Apr 6 05:43:50 2020, Ragan, Laszlo, Nikos, Runs, One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-06_06-18-59-809.png946073FA-3077-4CBF-900B-565BD19CF040.jpeg10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg2020-04-06_08-03-40-493.png
Entry  Thu Apr 2 05:00:44 2020, Ragan, Esther, Oliver, Runs, Second measurement with 2 hrs storage time 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
Entry  Thu Apr 2 07:01:32 2020, Ragan, Esther, Oliver, Runs, Measurement with 4 hrs storage time 
Entry  Sat Apr 4 17:32:01 2020, Ragan, Alex, Esther, General, No beam in ESR 
Entry  Sat Apr 4 18:29:44 2020, Ragan, Alex, Esther, Runs, 0 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_18-27-53-442.png2020-04-04_18-41-54-901.pngF5D184AC-FB3E-4F9F-B839-F71BC55C0996.jpegE4176CCB-1828-4E2E-85FB-0AC4BDC2808B.jpeg
Entry  Sat Apr 4 18:57:49 2020, Ragan, Alex, Esther, General, Timing problem with SIS & ESR and problems with stacking 
Entry  Sat Apr 4 19:55:37 2020, Ragan, Alex, Esther, Runs, Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_19-54-47-760.png2020-04-04_20-02-26-363.png
Entry  Sun Apr 5 15:28:35 2020, Ragan, Alex, Esther, Runs, Four hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
Entry  Sun Apr 5 20:23:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
Entry  Sun Apr 5 21:50:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
Entry  Sun Apr 5 23:28:01 2020, Ragan, Alex, Esther, Runs, One-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
Entry  Thu Mar 26 17:21:40 2020, Ragan, General, Stochastic cooling 
Entry  Fri Mar 27 13:02:07 2020, Ragan, General, Stochastic cooling stochastic_cooling.PNG
Entry  Fri Mar 27 13:04:17 2020, Ragan, General, FRS Settings until now frs.pdfFRS.pdf
Entry  Fri Mar 27 13:40:54 2020, Ragan, General, NTCap start and shutdown information ntcapmanual.pdf
Entry  Fri Mar 27 19:51:37 2020, Ragan, General, ESR Machine 
Entry  Fri Mar 27 19:59:09 2020, Ragan, General, Beam stacking in ESR is achieved 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOVstacking.png
Entry  Fri Mar 27 20:05:43 2020, Ragan, General, H2 gas jet ready BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
Entry  Fri Mar 27 20:52:31 2020, Ragan, General, Plans for the measurement with 206Pb81+ 
ELOG V3.1.5-fc6679b