HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
Bound beta decay experiment on Tl-205, Page 7 of 9
Not logged in
Find
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
SlowControl
180 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
,
9
Next
All
Thu Apr 2 21:12:39 2020, Ragan, Nikos, Pierre-Michel, Dima, Runs, Three hour measurement (S2: 0/35 mm)
Fri Apr 3 00:39:07 2020, Ragan, Pierre-Michel, Dima, Runs, Half hour measurement (S2: 0/35 mm)
Fri Apr 3 01:22:13 2020, Ragan, Pierre-Michel, Dima, Runs, One hour measurement (S2: 0/35 mm)
Fri Apr 3 03:18:06 2020, Ragan, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm)
Fri Apr 3 03:19:46 2020, Ragan, Pierre-Michel, Dima, Runs, Half hour measurement (S2: 0/35 mm)
Fri Apr 3 03:59:14 2020, Ragan, Pierre-Michel, Dima, Runs, Two hour measurement (S2: 0/35 mm)
Fri Apr 3 04:36:21 2020, Ragan, Pierre-Michel, Dima, General, Electron cooler problem which was then solved
Fri Apr 3 06:35:37 2020, Ragan, Pierre-Michel, Dima, Mei, Shahab, Runs, Half hour measurement (S2: 0/35 mm)
Fri Apr 3 10:06:15 2020, Shahab, Runs, Plots from Scopes
Fri Apr 3 11:52:27 2020, Shahab, Runs, Stacking 54 times!
Fri Apr 3 11:59:50 2020, Ragan, Pierre-Michel, Dima, Runs, Four hour measurement (S2: 0/35 mm)
Fri Apr 3 12:02:32 2020, Ragan, Mei, Shahab, Runs, Half hour measurement (S2: 0/35 mm)
Fri Apr 3 13:21:16 2020, Ragan, Mei, Shahab, Runs, Zero hour measurement (S2: 0/35 mm)
Fri Apr 3 13:39:58 2020, Ragan, Mei, Shahab, Laszlo, Runs, Eight hour measurement (S2: 0/35 mm)
Fri Apr 3 14:08:41 2020, Shahab, Runs, Stacking
Fri Apr 3 17:55:13 2020, Shahab, Runs, Nice picture from 205-Tl
Sat Apr 4 00:00:20 2020, Ragan, Laszlo, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Sat Apr 4 00:11:23 2020, Ragan, Pierre-Michel, Dima, Runs, Half hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Sat Apr 4 00:40:29 2020, Ragan, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm)
Sat Apr 4 03:06:12 2020, Ragan, General, Instructions if electron cooler goes off during long storage time measurements
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
,
9
Next
All
ELOG V3.1.5-fc6679b