HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 12 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Year
  357   Thu May 20 17:31:50 2021 Jan, Laszlo, BeatrizGeneralbeam & target alignement2021
beam and target alignement was checked by looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm

(We were aiming to keep the particles in the beam at a const. level when target switched ON)
pos   bdt
-21   800
-20   1000
-19   1300
-18   1300
-17   1000
-16   500
  356   Thu May 20 17:31:28 2021 Beatriz, LaszloCalibrationrun00512021
crap
  355   Thu May 20 15:15:54 2021 Beatriz, LaszloCalibrationrun00502021
crap
  353   Wed May 19 19:47:14 2021 YuriGeneralBeam Halflife at 30 AMeV2021
  352   Wed May 19 15:09:22 2021 Helmut WeickGeneralFRS settings, LISE file2021
Here is a setting plan for FRS and corresponding LISE files.
2 LISE files still use the old FRS-ESR optics, one the new with S6 focus on slits. 
But this does not make a big difference for the simulation, only dispersion S2-S6 is lower.
For realistic contaminants you must open the slits at S6 more(~ +/-10mm).
Added a list of fragments and expected frequencies after cooling at 400 MeV/u.
Only nuclides close to 118Te in m/q should be cooled.
  351   Wed May 19 13:47:26 2021 Jan GloriusGeneralGasTarget Operation2021
We have two tasks to take over for the target operation:

1. We have to refill the blue LN2 bottle on the roof of ESR every morning (see 1st attached foto)
For this we use the small silver dewar on the floor there. In case this dewar is empty we have to refill it in the yard.
No need to stop the measurement for this.

2. We have to monitor the LN2-level warning on Ulis web page: http://ulpc24.gsi.de/mediawiki/index.php
In case there is a warning (~12h remaining), we have to refill the big dewar at the target in ESR.
This means we need ESR on TSG with the gate open.

In case the nozzle is clogging and we do not reach reasonable densities anymore and E1 pressure is going down, we have to heat up the nozzle manually.
This can be done at the control panel on the roof of ESR (see 2nd attached foto).
The proceedure is:
1. push "set point"
2. type new value in Kelvin (e.g. 100K for start of heating)
3. press "enter" to apply or "escape" to correct typo
4. monitor E1 pressure (should go up)

Overview page:
https://popps.org/cgi-bin/jet.py?gasart=Wasserstoff
  350   Tue May 18 21:08:16 2021 ESR teamGeneralBeam stacking2021
Beam stacking. 3 pulses, stochastically cooled and stacked on an inner orbit
  349   Tue May 18 11:22:57 2021 Jan GloriusCalibrationrun0049 - calib all Xray det.2021
Efficiency calibration in ESR

************************************
GEM1800 @ 90deg (xray1)
GEM3000 @ 35deg (xray2)
GLP2000 @ 145deg (xray3)
************************************


Detector: all
Source @ 90deg: 210Pb
Source @ 35deg: 133Ba_hi
Source @ 145deg: 241Am_hi
Distance: each
Start time: 11:22:36 - 18.05.2021
Stop time:  13:36:55 - 18.05.2021

file name: e127b_run0049.lmd
avrg. rate: 400Hz
dead-time:  3%
  348   Tue May 18 01:21:27 2021 Jan GloriusCalibrationrun0047 - crap2021
  347   Tue May 18 01:03:59 2021 Jan GloriusCalibrationrun0048 - calib all Xray det.2021
Efficiency calibration in ESR

************************************
GEM1800 @ 90deg (xray1)
GEM3000 @ 35deg (xray2)
GLP2000 @ 145deg (xray3)
************************************


Detector: all
Source @ 90deg: 210Pb
Source @ 35deg: 133Ba_hi
Source @ 145deg: 241Am_hi
Distance: each
Start time: 01:20:23 - 18.05.2021
Stop time:  11:05:30 - 18.05.2021

file name: e127b_run0048.lmd
avrg. rate: 400Hz
dead-time:  3%
  346   Sun May 16 13:31:49 2021 LaszloDAQCabling Documentation2021
Si HV and current was switched in the last documentation.
  345   Sun May 16 12:55:48 2021 Jan GloriusDAQevent server lxg1299:60032021
new event server is set up at lxg1299 on port 6003
It runs as:
/data.local1/gstore/mrevserv64 lxg1275
  344   Sun May 16 11:54:12 2021 Jan GloriusCalibrationXray performance in lab2021
These are the current Xray detector performances in the lab using data from run0046

det DAQ ch threshold resolution @ 60keV
GEM1800 xray1 5keV 495eV
GLP2000 xray2 5keV 430eV
GEM3000 xray3 7keV 525eV
  343   Sun May 16 11:25:25 2021 Jan GloriusCalibrationrun0046 - Xray E-calib 241Am all dets2021
Detectors: Xray1 (GEM1800), Xray2 (GLP), Xray3 (GEM3000)
Sources: different Am241 at each detector

Start time: 11:25:04 - 16.05.2021
Stop time:  11:29:45 - 16.05.2021

file name: e127b_run0046.lmd
avrg. rate: 6000Hz
dead-time:  30%
  342   Sat May 15 20:21:59 2021 Jan GloriusCalibrationrun0045 - Si pulser run2021
Detector: DSSD
Source: CAEN Detector Emulator

Start time: 20:24:14 - 15.05.2021
Stop time:  21:01:34 - 15.05.2021

file name: e127b_run0045.lmd
avrg. rate: 1000Hz
dead-time:  7.5%


Si bias test cycle:
0V > 50V/200uA > 100V/280uA > 150V/370uA > 120V/320uA > 90V/260uA > 60V/210uA > 30V/160uA > 0V
This cycle is run twice i the first 15 minutes and shall be used for calibration of the scaler channels.

Also ESR trafo is running with beam.
  341   Fri May 14 13:58:52 2021 Jan GloriusCalibrationrun0044 - Xray145 calib 210Pb d=305mm2021
Efficiency calibration in the lab

************************************
CAUTION! 
This is now GEM1800 @ 145deg distance
But still operated as Xray1 in DAQ
************************************

90deg TFA diff set from 50 to 200.
Also threshold is slightly increased.

Detector: GEM1800 - 145 deg
Source: 210Pb
Distance: 305mm
Start time: 13:58:33 - 14.05.2021
Stop time:  16:46:00 - 14.05.2021

file name: e127b_run0044.lmd
avrg. rate: 40Hz
dead-time:  0%

Blocking gate 2.5 us in vulom.

Threshold < 10keV

The scale serial communication is off.
  340   Fri May 14 11:17:48 2021 Jan GloriusCalibrationrun0043 - Xray145 calib 210Pb d=305mm2021
Efficiency calibration in the lab

************************************
CAUTION! 
This is now GEM1800 @ 145deg distance
But still operated as Xray1 in DAQ
************************************

Threshold slightly increased

Detector: GEM1800 - 145 deg
Source: 210Pb
Distance: 305mm
Start time: 11:17:23 - 14.05.2021
Stop time:  13:47:42 - 14.05.2021

file name: e127b_run0043.lmd
avrg. rate: 40Hz
dead-time:  0%

Blocking gate 2.5 us in vulom.

Threshold < 10keV

The scale serial communication is off.
  339   Fri May 14 10:28:49 2021 Jan GloriusCalibrationrun0042 - Xray145 calib 241Am_hi d=305mm2021
Efficiency calibration in the lab

************************************
CAUTION! 
This is now GEM1800 @ 145deg distance
But still operated as Xray1 in DAQ
************************************

Threshold slightly increased

Detector: GEM1800 - 145 deg
Source: 241Am_hi
Distance: 305mm
Start time: 10:27:58 - 14.05.2021
Stop time:  11:14:03 - 14.05.2021

file name: e127b_run0042.lmd
avrg. rate: 200Hz
dead-time:  1.5%

Blocking gate 2.5 us in vulom.

Threshold < 10keV

The scale serial communication is off.
  338   Fri May 14 09:35:13 2021 Jan GloriusCalibrationrun0041 - Xray145 calib Cd109 d=305mm2021
Efficiency calibration in the lab

************************************
CAUTION! 
This is now GEM1800 @ 145deg distance
But still operated as Xray1 in DAQ
************************************

Threshold slightly increased

Detector: GEM1800 - 145 deg
Source: 109Cd
Distance: 305mm
Start time: 09:34:52 - 14.05.2021
Stop time:  09:47:42 - 14.05.2021

file name: e127b_run0041.lmd
avrg. rate: 600Hz
dead-time:  5%

Blocking gate 2.5 us in vulom.

Threshold < 10keV

The scale serial communication is off.
  337   Fri May 14 09:06:55 2021 Jan GloriusCalibrationrun0040 - Xray145 calib Ba133_hi d=305mm2021
Efficiency calibration in the lab

************************************
CAUTION! 
This is now GEM1800 @ 145deg distance
But still operated as Xray1 in DAQ
************************************

Threshold slightly increased

Detector: GEM1800 - 145 deg
Source: 133Ba_hi
Distance: 305mm
Start time: 09:06:33 - 14.05.2021
Stop time:  09:31:32 - 14.05.2021

file name: e127b_run0040.lmd
avrg. rate: 850Hz
dead-time:  6%

Blocking gate 2.5 us in vulom.

Threshold < 10keV

The scale serial communication is off.
ELOG V3.1.5-fc6679b