HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 20 of 29  Not logged in ELOG logo
ID Date Author Categorydown Subject Year Text Attachments
  571   Wed Jun 2 09:14:04 2021 JanGeneralTelegram Chat Export2021Attached is the exported Telegram chat.
There is the simple PDF and the zip-file
containing the chat in json-format as well
 E127_TelegramChat.pdfE127_TelegramChat_json.zip 
  2   Thu Jan 17 08:45:43 2019 JanDetectorsMicron W1 DSSSD - technical information Attached are the spec sheets and design drawings
of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo
 6x 
  7   Wed Jun 5 11:29:13 2019 JanDetectorsposition/channel calib. This is the first position calibration done
with the detector installed in the holder.
The goal is to assign rough positions (top/bottom/left/right)
  
  11   Fri Jun 7 14:39:36 2019 JanDetectorsPt100 installation & readout The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires.
 det_connector.pngPt100_readout.JPG 
  16   Mon Jul 8 14:57:07 2019 Yuanming XingDetectorsThe measurement of the tilting angle As shown in the figure, the detector is tilted
by a certain angle which is about 45 degree.
 TiltingAngle.png 
  21   Thu Aug 29 10:02:22 2019 JanDetectorsbakeout at ESR setup The bakeout for our detector setup has started
on the evening of 27.08.2019 
We have a temperature sensor in the vacuum
 T_set_bakeout.png 
  28   Wed Nov 6 14:13:53 2019 Jan, LaszloDetectorsDSSSD - 1st movement - realignment We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion
  
  29   Fri Nov 15 10:46:12 2019 LaszloDetectorsDetector movement from HKR To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
 IMG_20191114_135600.jpg 
  30   Thu Dec 5 10:57:57 2019 Jan, LaszloDetectorssetting up the DSSD with beam This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
  
  32   Tue Feb 11 13:20:01 2020 JanDetectorsBaF2 - HV settings with these HV values the 6 channels are roughly
gain matched, such that the 7.83 MeV Po-decay
is around channel 5000.
 BaF2_HV_settings.pngbaf_bg_ch1.png 
  36   Fri Feb 21 11:29:59 2020 JanDetectorsdet. distances at target chamber This is the lookup table for the distance
of each x-ray detector to the target.
See attched foto for explanation.
 Photonen_Kammer.png 
  37   Tue Mar 10 08:52:34 2020 JanDetectorsDSSSD positioning To find a good Si position, we need to follow
a procedure similar to this:
 optimum_detector_position_2.jpg 
  38   Tue Mar 10 09:41:26 2020 JanDetectorsx-ray background from BaF The BaF2 detectors planned to be installed
at the target induce an additional background
in the x-ray detectors sitting below inside
  
  47   Sun Mar 15 17:12:40 2020 Laszlo, JanDetectorsnew Ortec spec amps  We are now using new SpecAmps for the x-ray
detectors from ORTEC, they deliver much improved
resolution but have other strange effects
  
  88   Fri Mar 20 22:26:42 2020 JanDetectorsBaF2 deactivated BaF2 detectors are deactivated nor for the
following runs.
  
  129   Sat Mar 21 13:44:16 2020 Pierre-MichelDetectorsRecoil detector We turn on Recoil detector, to use it as a
monitor for target overlap.
 Recoil.pdf 
  152   Sat Mar 21 23:12:38 2020 JanDetectorsremoved BaF detectors After run 67 and before run 68, the BaF detectors
have been removed in order to reduce the
Compton background in the x-ray detectors.
  
  283   Fri Jun 5 14:06:15 2020 LaszloDetectorsDSSSD and SCRAPER position estimate for Xe and Te experiments2020We don't know the exact absolute positions
of the detector (+scraper) and the beam.
However, what we have to know is only these
 SP54120060514100.pdfDSSSD_new1.pdfIMG_20200321_025644.jpg 
  284   Fri Oct 23 12:58:12 2020 JanDetectorsTest of 2nd DSSSD (gen2)2021This is the documentation of the source tests
with the 2nd micron DSSSD of 2nd generation
(label 3288-17, thickness 529um)
 Si2_run001.jpgSi2_run002.jpg 
  287   Tue Feb 2 13:59:00 2021 JanDetectorsDSSD installation and alignment2021The DSSD has been exchanged and aligned in

November 2020. After bakeout at 140°C 
  
ELOG V3.1.5-fc6679b