HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 20 of 29  Not logged in ELOG logo
Entry  Wed Jun 2 09:14:04 2021, Jan, General, Telegram Chat Export, 2021 E127_TelegramChat.pdfE127_TelegramChat_json.zip
Attached is the exported Telegram chat.
There is the simple PDF and the zip-file containing the chat in json-format as well as all media files.
Entry  Thu Jan 17 08:45:43 2019, Jan, Detectors, Micron W1 DSSSD - technical information,  6x
Attached are the spec sheets and design drawings of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo is also attached as stp and dwg.
Entry  Wed Jun 5 11:29:13 2019, Jan, Detectors, position/channel calib.,  
This is the first position calibration done with the detector installed in the holder. The goal is to assign rough positions (top/bottom/left/right) to
PreAmp- and Shaper-channels.
Entry  Fri Jun 7 14:39:36 2019, Jan, Detectors, Pt100 installation & readout,  det_connector.pngPt100_readout.JPG
The new detector holder incorporates a Pt100 temperature sensor, which is UHV compatible. The Pt-resistor is read out via 4 wires. These wires are integrated
into the D-SUB connector of the detector. The new wires use the pins as shown in the attached picture
"det_connector.png".
Entry  Mon Jul 8 14:57:07 2019, Yuanming Xing, Detectors, The measurement of the tilting angle,  TiltingAngle.png
As shown in the figure, the detector is tilted by a certain angle which is about 45 degree. 
The tilted angle is defined as angle B.
We measured angle A using the vertical laser line (red) and papers with a straight line edge. So we can marked
Entry  Thu Aug 29 10:02:22 2019, Jan, Detectors, bakeout at ESR setup,  T_set_bakeout.png
The bakeout for our detector setup has started on the evening of 27.08.2019 
We have a temperature sensor in the vacuum next to the detector.
The goal is to maximize bakeout temperature, while not going above 125°C at the detector/sensor.
Entry  Wed Nov 6 14:13:53 2019, Jan, Laszlo, Detectors, DSSSD - 1st movement - realignment,  
We moved the new detector installation for the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion or vertical movement of the detector-arm was observed from the window flange.
Entry  Fri Nov 15 10:46:12 2019, Laszlo, Detectors, Detector movement from HKR,  IMG_20191114_135600.jpg
To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
Entry  Thu Dec 5 10:57:57 2019, Jan, Laszlo, Detectors, setting up the DSSD with beam,  
This is a brief how-to about getting the DSSSD set up with stored beam and target in the ESR.

The main goals
Entry  Tue Feb 11 13:20:01 2020, Jan, Detectors, BaF2 - HV settings,  BaF2_HV_settings.pngbaf_bg_ch1.png
with these HV values the 6 channels are roughly gain matched, such that the 7.83 MeV Po-decay is around channel 5000.
Entry  Fri Feb 21 11:29:59 2020, Jan, Detectors, det. distances at target chamber,  Photonen_Kammer.png
This is the lookup table for the distance of each x-ray detector to the target.
See attched foto for explanation.
Entry  Tue Mar 10 08:52:34 2020, Jan, Detectors, DSSSD positioning,  optimum_detector_position_2.jpg
To find a good Si position, we need to follow a procedure similar to this:

1. Si in max-in position
Entry  Tue Mar 10 09:41:26 2020, Jan, Detectors, x-ray background from BaF,  
The BaF2 detectors planned to be installed at the target induce an additional background in the x-ray detectors sitting below inside the target chamber.

We made test measurements with an x-ray detector for estimating the background in the region of interest for our K-REC measurements (35 to 50 keV).
Entry  Sun Mar 15 17:12:40 2020, Laszlo, Jan, Detectors, new Ortec spec amps ,  
We are now using new SpecAmps for the x-ray detectors from ORTEC, they deliver much improved resolution but have other strange effects as discribed in the
next entry.
Entry  Fri Mar 20 22:26:42 2020, Jan, Detectors, BaF2 deactivated,  
BaF2 detectors are deactivated nor for the following runs.
Entry  Sat Mar 21 13:44:16 2020, Pierre-Michel, Detectors, Recoil detector,  Recoil.pdf
We turn on Recoil detector, to use it as a monitor for target overlap.

MCP front -2500 V for highest signal rate. 
Entry  Sat Mar 21 23:12:38 2020, Jan, Detectors, removed BaF detectors,  
After run 67 and before run 68, the BaF detectors have been removed in order to reduce the Compton background in the x-ray detectors.
Entry  Fri Jun 5 14:06:15 2020, Laszlo, Detectors, DSSSD and SCRAPER position estimate for Xe and Te experiments, 2020 SP54120060514100.pdfDSSSD_new1.pdfIMG_20200321_025644.jpg
We don't know the exact absolute positions of the detector (+scraper) and the beam. However, what we have to know is only these two relative positions respect
to each other. To get this distance I use two methods:
1, combining the infos from the set position during the beamtime + the measured pg peak position on the detector. The pg peak position is defined only
Entry  Fri Oct 23 12:58:12 2020, Jan, Detectors, Test of 2nd DSSSD (gen2), 2021 Si2_run001.jpgSi2_run002.jpg
This is the documentation of the source tests with the 2nd micron DSSSD of 2nd generation (label 3288-17, thickness 529um)

The detector is put into vacuum (~5e-6 mbar) in our test chamber. The source is positioned a few cm above (see fotos).
Entry  Tue Feb 2 13:59:00 2021, Jan, Detectors, DSSD installation and alignment, 2021 
The DSSD has been exchanged and aligned in 
November 2020. After bakeout at 140°C 
(externally, 120°C at internal temp. Sensor) 
ELOG V3.1.5-fc6679b