HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 25 of 29  Not logged in ELOG logo
Entry  Mon Mar 23 03:53:41 2020, Shahab, Runs, Reduced intensity inspite of faulty kicker,  
SIS Kicker is still faulty. but we managed to reduce again the intensity to around 2e6 particles in ring to reduce scattering on scraper.
Entry  Sat Mar 21 17:34:10 2020, Sergiy, General, Recoils,  

We started recording the data from the recoils using the MCP from Pierre-Michael's experiment. 
17:30 File opened: recoils1662.lmd.
Entry  Sat Mar 21 13:44:16 2020, Pierre-Michel, Detectors, Recoil detector,  Recoil.pdf
We turn on Recoil detector, to use it as a monitor for target overlap.

MCP front -2500 V for highest signal rate. 
Entry  Mon Mar 23 00:39:52 2020, Shahab, General, Ramping cycle picture and data,  2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx
Complete ramping cycle recorded from Oscilloscope Tektronix MSOX2024A.
 Stored as XLS file.
Entry  Tue May 25 18:46:04 2021, Robert/Shahab, Accelerator, Quadrupoles down, 2021 
All quadrupoles went off, waiting for the on-call service
Entry  Fri Jun 7 14:39:36 2019, Jan, Detectors, Pt100 installation & readout,  det_connector.pngPt100_readout.JPG
The new detector holder incorporates a Pt100 temperature sensor, which is UHV compatible. The Pt-resistor is read out via 4 wires. These wires are integrated
into the D-SUB connector of the detector. The new wires use the pins as shown in the attached picture
"det_connector.png".
Entry  Thu Sep 13 11:42:33 2018, Jan Glorius, Collaboration, Proposal,  E127_Reifarth_pg.pdfE127_Approval.pdf
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017.    
Entry  Mon Mar 23 06:20:06 2020, Shahab, Runs, Position on scintillator corrected sitll no beam in ESR,  IMG_20200323_061337.jpg
position on the scintillator was corrected by the OPs to center, but beam is still not in ESR.
Entry  Tue Mar 24 10:20:26 2020, Laszlo, Calibration, Pictures of the xray calibration,  IMG_20200324_101357.jpgIMG_20200324_101303.jpgIMG_20200324_101334.jpgIMG_20200324_100725.jpg
 
Entry  Wed May 26 18:37:34 2021, Ragan, Thanassis, General, Optimization target bump/overlapp, 2021 
| bump position | X ray bdt ON | Si rate ON |
---------------------------------------------
| -11.5         | 120          | 4-5        |
Entry  Thu May 27 08:26:15 2021, Yuri, Beatriz, General, Optimisation beam position on target and scraper position, 2021 
Optimised overlap with the target by shifting the beam from -11.5 to 12.8 mm. This lead to an increase of the DSSSD rate of a factor between 2.5 or 3.
Adjusted scraper position  by looking at x-ray rate and move it from +1 to +2. 
Entry  Tue May 25 13:49:51 2021, Oliver, Diego, Jan, General, No Beam, 2021 
No beam from 13:49:00 until 
Entry  Sat May 29 23:05:52 2021, Oliver, Diego, General, No Beam, 2021 
Due to a radioprotection issue in CaveA there is no beam. We wait for the radioprotection shift to arrive...

Beam back at 23:18
Entry  Mon May 24 06:30:42 2021, Ragan, DAQ, NTCAP, 2021 
NTCAP started for recording Schottky data

SC_2021-05-24_06-29-31
Entry  Thu Jan 17 08:45:43 2019, Jan, Detectors, Micron W1 DSSSD - technical information,  6x
Attached are the spec sheets and design drawings of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo is also attached as stp and dwg.
Entry  Sat Mar 21 11:30:04 2020, Laszlo, General, MWPC movement,  MWPC_movement.png
now we try to move the capture detector (MWPC in the 1. dipol before our Si setup) inside the ring while the DAQ was ON

we tried to move it as close as possible to the beam
Entry  Tue Jun 25 21:19:50 2019, Laszlo, Simulations, MOCADI input parameters,  template.pdfsteck2004.pdf
initial BEAM input parameters for MOCADI are based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in --> twist parameters (ratio of X/A and B/Y)
- M. Steck et al, Electron cooling experiments at the ESR, NIM A 532 (2004) 357-365 --> epsilon_x = 5·10^-7
Entry  Sat Mar 21 13:37:53 2020, Laszlo, , MCP can monitor target,  
now with the MCP we can see clearly the effect of the target :) (scintillation?)
so we want to scan through the target thickness with the beam and choose the best position afterwards.
Entry  Tue May 25 22:03:22 2021, Robert/Shahab, Runs, Lifetime measurement, 2021 
Run 0118

Gas jet target has been turned off for lifetime measurement.
Entry  Sun Mar 22 12:50:00 2020, Shahab, Runs, Life time of 10 MeV/u Tail of 118-Te-52+,  target_off.jpgtarget_on.jpg
The life time of 10 MeV/u Tail of cycle 118-Te-52+ was analyzed using Schottky peak intensity. Schottky signal was taken from the parallel plate Schottky
monitor at  using the:
ELOG V3.1.5-fc6679b