Mon Mar 23 01:17:26 2020, Shahab, General, Life time measurements using Schottky,
|
Did Schottky measurements using 5 shots with and without gas target each
restarting the DAQ |
Mon Mar 23 05:55:24 2020, Shahab, Runs, Kicker problem not solved yet,
|
no solution to kicker problem. |
Mon Mar 23 03:58:25 2020, Shahab, General, Kicker guy arrived,
|
Kicker Guy (U. Blell) arrived in order to fix modules. |
Wed Oct 13 15:09:04 2021, Jan, Collaboration, K-REC cross sections A. Surzhykov, 2021
|
Attached are the theory K-REC cross sections as calculated by Andrey Surzhykov (August 2021).
They are done for 118Te52+ on H2 at 7.049 and 6.042 MeV/u as well as for 124Xe54+ on H2 at 7.049 MeV/u.
|
Wed May 19 13:47:26 2021, Jan Glorius, General, GasTarget Operation, 2021
|
We have two tasks to take over for the target operation:
1. We have to refill the blue LN2 bottle on the roof of ESR every morning (see 1st attached foto)
|
Wed Sep 25 13:58:24 2019, Laszlo, General, Gamow window energies for 118Te(p,g),
|
# Z A Iso Re Rc T9 upper width mxpos shift
52 118 te118 pg 20 0.5 1.39 0.58 1.06 -0.01
52 118 te118 pg 20 1.0 2.27 1.04 1.69 -0.01
|
Mon Mar 16 15:15:22 2020, Jan, Calibration, Gamma- and X-ray intensities for efficiency calib,
|
Intensities for special gamma or x-ray lines needed for efficiency calibration can be found here:
|
Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,
|
Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible. However we could.catch it somehow with Shottky (picture below) |
Thu May 27 13:48:18 2021, Helmut Weick, Accelerator, FRS wrong status display for one day, 2021
|
By checking the log files we realized that from yesterday 26.05. 13:44 - today 13:05 the FRS degrader was shown as out.
TS3ET7US should be at -420.0mm not at -580mm (=out). This 3.26mm Sci is used as a degrader and is essential.
|
Mon May 24 17:48:04 2021, Erika, General, FRS shiftplan, name abbreviations and phone list, 2021
|
FRS shift plan for this week:
[img]elog:424/1[/img]
|
Mon May 24 05:20:36 2021, Helmut, Yuri, Faraz, Sergey, Accelerator, FRS setup, 2021 14x
|
Logbook from start of FRS until 118Te injection |
Wed May 19 15:09:22 2021, Helmut Weick, General, FRS settings, LISE file, 2021
|
Here is a setting plan for FRS and corresponding LISE files.
2 LISE files still use the old FRS-ESR optics, one the new with S6 focus on slits.
But this does not make a big difference for the simulation, only dispersion S2-S6 is lower.
|
Thu May 27 13:26:35 2021, Jan, Accelerator, FRS degrader failure, 2021
|
Maybe, our degrader in FRS was removed by hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
All runs taken in this period have to be double checked!
|
Sat Mar 21 12:32:00 2020, Laszlo, General, Estimated target thickness,
|
Target thickness must be like 5mm (was measured with a moving thin wire)
The beam thickness is small because of the low intensity
Maybe we hit the target a bit offset --> less rate?
|
Sat Mar 21 12:42:21 2020, Ragan, General, Entry to ESR for MCP detector,
|
Pierre Michel and Laszlo go inside the ESR for switching on the MCP detector so that the photons from the gas jet and secondary beam interaction can be
seen.
|
Mon Mar 23 01:53:59 2020, Shahab, Runs, Empty shots in ESR,
|
since about 01:40 AM, there is no beam in ESR. .
stopped data acquisition
OPs are working on it. After searching, OPs decided that something is wrong with ESR. |
Thu Jul 8 13:39:34 2021, Jan, Calibration, Electron cooler parameters, 2021
|
Below are the results from the e-cooler voltage offset measurments done by Regina Hess et al. using the voltage divider (VD).
--7 MeV--
|
Wed Jun 23 12:29:35 2021, Jan, Sophia, Calibration, Efficiency of the x-ray Detectors , 2021
|
For the x-ray detectors, efficiencies have been measured, before and after the experiment was performed.
The preliminary results of the determined efficiencies can be seen in the attached plots |
Tue May 25 07:51:48 2021, Jan, Accelerator, ESR stacking cycle length, 2021
|
The full cycle length of ESR with 30 stacks is about 7:45 minutes, out of which 15.5 sec are with target switched ON.
This is without CMB/HTD in parallel. |
Mon Mar 23 06:49:46 2020, Shahab, Runs, ESR kicker also has some problems,
|
|