| ID | 
Date  | 
Author | 
Category | 
Subject | 
Year | 
Text | 
  | 
| 
  32  
 | 
Tue Feb 11 13:20:01 2020 | 
Jan | Detectors | BaF2 - HV settings |   | with these HV values the 6 channels are roughly 
gain matched, such that the 7.83 MeV Po-decay 
is around channel 5000. | 
     | 
| 
  31  
 | 
Thu Jan 23 16:35:47 2020 | 
Laszlo | DAQ | cable documentation |   |   | 
     | 
| 
  30  
 | 
Thu Dec  5 10:57:57 2019 | 
Jan, Laszlo | Detectors | setting up the DSSD with beam |   | This is a brief how-to about getting the DSSSD 
set up with stored beam and target in the 
ESR.
 | 
   | 
| 
  29  
 | 
Fri Nov 15 10:46:12 2019 | 
Laszlo | Detectors | Detector movement from HKR |   | To move the detector remotely from the HKR:
 
-go to a desktop of a HKR computer
 
-right click: "App Launcher PRO"
 | 
    | 
| 
  28  
 | 
Wed Nov  6 14:13:53 2019 | 
Jan, Laszlo | Detectors | DSSSD - 1st movement - realignment |   | We moved the new detector installation for 
the first time slowly into the dipole chamber.
 
The alignement seems to be pefect, no distortion | 
   | 
| 
  27  
 | 
Fri Oct 25 16:34:51 2019 | 
Jan | Runs | prerun007 - MixedAlpha |   | save point: lxg1275:/datalocal1/e127/predata/prerun007
 
 
start: Fr 25.10.19 - 16:35 
 | 
   | 
| 
  26  
 | 
Wed Oct 23 15:35:29 2019 | 
Jan | DAQ | DAQ with & without MDPP-16 |   | the DAQ located in
 
../esrdaq_2018/r4l-58_dev/
 
 | 
   | 
| 
  25  
 | 
Wed Oct 23 14:51:43 2019 | 
Jan, Laszlo | DAQ | VME modules & main.cfg |   | Here is the current list of VME modules in 
our DRASI daq including HW addresses:
 
 | 
    | 
| 
  24  
 | 
Wed Oct 23 11:40:29 2019 | 
Jan | Runs | prerun005 - MixedAlpha |   | save point: lxg1275:/datalocal1/e127/predata/prerun005
 
 
start: 23.10.19 - 11:40 
 | 
   | 
| 
  23  
 | 
Wed Sep 25 13:58:24 2019 | 
Laszlo | General | Gamow window energies for 118Te(p,g) |   | # Z   A   Iso Re Rc   T9 upper width mxpos 
 shift
 
 52 118 te118 pg 20  0.5  1.39  0.58  1.06 | 
    | 
| 
  22  
 | 
Wed Sep 25 13:03:46 2019 | 
Laszlo | Analysis | simulations on 118Te+p |   | I have made some simulations at 8AMeV, 7AMeV 
and 4AMeV energies for the main 118Te + p 
reaction channels. For the
 | 
 11x   | 
| 
  21  
 | 
Thu Aug 29 10:02:22 2019 | 
Jan | Detectors | bakeout at ESR setup |   | The bakeout for our detector setup has started 
on the evening of 27.08.2019 
 
We have a temperature sensor in the vacuum | 
    | 
| 
  20  
 | 
Fri Aug  9 13:43:15 2019 | 
Laszlo | Simulations | pn channel simulations for 111Sn(p,g)112Sb experiment |   | The p,n channel opening for 111Sn beam is 
at 5.8895 MeV/u beam energy. Therefore, when 
choosing 6MeV/u, 7MeV/u,
 | 
 12x   | 
| 
  Draft  
 | 
Fri Aug  9 13:14:09 2019 | 
Laszlo |   | pn channel simulations for 111Sn(p,g)112Sb experiment |   | The p,n channel opening for the 111Sn+p reaction 
is at 5.8895 MeV/u beam energy. Therefore, 
when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam | 
   | 
| 
  18  
 | 
Tue Jul 23 10:46:29 2019 | 
Laszlo | Analysis | 124Xe pg peak fit using mixed cascade simulation |   | This entry is the continuation of the cascade 
effects on the pg peak shape entry:
 
 | 
 7x   | 
| 
  17  
 | 
Tue Jul  9 15:26:59 2019 | 
Yuanming Xing | Simulations | Simulated Rutherford scattering distribution on detector |   | Simulated Rutherford scattering distribution 
on detector
 
 | 
      | 
| 
  16  
 | 
Mon Jul  8 14:57:07 2019 | 
Yuanming Xing | Detectors | The measurement of the tilting angle |   | As shown in the figure, the detector is tilted 
by a certain angle which is about 45 degree. 
 | 
    | 
| 
  Draft  
 | 
Fri Jun 28 14:06:28 2019 | 
Jan | General | CAD of (p,g) setup |   |   | 
   | 
| 
  14  
 | 
Tue Jun 25 21:19:50 2019 | 
Laszlo | Simulations | MOCADI input parameters |   | initial BEAM input parameters for MOCADI are 
based on:
 
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in | 
     | 
| 
  13  
 | 
Tue Jun 11 10:13:56 2019 | 
Jan | Runs | prerun003 - MixedAlpha |   | save point: lxg1275:/datalocal1/e127/predata/prerun004
 
~10min run
 
 | 
   |