HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 3 of 29  Not logged in ELOG logo
ID Date Author Category Subjectup Year Text Attachments
  287   Tue Feb 2 13:59:00 2021 JanDetectorsDSSD installation and alignment2021The DSSD has been exchanged and aligned in

November 2020. After bakeout at 140°C 
  
  28   Wed Nov 6 14:13:53 2019 Jan, LaszloDetectorsDSSSD - 1st movement - realignment We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion
  
  283   Fri Jun 5 14:06:15 2020 LaszloDetectorsDSSSD and SCRAPER position estimate for Xe and Te experiments2020We don't know the exact absolute positions
of the detector (+scraper) and the beam.
However, what we have to know is only these
 SP54120060514100.pdfDSSSD_new1.pdfIMG_20200321_025644.jpg 
  387   Sat May 22 16:28:10 2021 LaszloGeneralDSSSD movement2021The DSSSD is moved back to its measurement
position(-25mm).
  
  37   Tue Mar 10 08:52:34 2020 JanDetectorsDSSSD positioning To find a good Si position, we need to follow
a procedure similar to this:
 optimum_detector_position_2.jpg 
  106   Sat Mar 21 06:02:22 2020 Tino, OliverGeneralDetector filling Run stopped for detector fillings   
  478   Wed May 26 20:34:50 2021 Ragan, ThanassisDetectorsDetector filling2021Jan is filling the detector after run0137.   
  29   Fri Nov 15 10:46:12 2019 LaszloDetectorsDetector movement from HKR To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
 IMG_20191114_135600.jpg 
  282   Tue May 19 16:48:15 2020 LaszloGeneralE127 beamtime overview Here is a representation how was the time
management during E127. The time, what we
could spend with measuring the 118Te(pg),
 E127_beamtime_overview.pngE127_beamtime_overview.pdf 
  249   Mon Mar 23 14:12:54 2020 RaganRunsE127 experiment stops close file : run104 (14:12:44)
E127 experiment finishes on a successful
note )) Congratulations to the entire team
  
  569   Mon May 31 10:08:42 2021 Jan, SophiaRunsE127b runsheet2021   e127b_runsheet.ods 
  208   Sun Mar 22 23:19:23 2020 MichaelGeneralESR Vacuum readings    ESR_Vakuum2020-03-22-2318.PNG 
  226   Mon Mar 23 06:49:46 2020 ShahabRunsESR kicker also has some problems     
  438   Tue May 25 07:51:48 2021 JanAcceleratorESR stacking cycle length2021The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
  
  573   Wed Jun 23 12:29:35 2021 Jan, SophiaCalibrationEfficiency of the x-ray Detectors 2021For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed. 
 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png 
  575   Thu Jul 8 13:39:34 2021 JanCalibrationElectron cooler parameters2021Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
  
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
  
  126   Sat Mar 21 12:42:21 2020 RaganGeneralEntry to ESR for MCP detector Pierre Michel and Laszlo go inside the ESR
for switching on the MCP detector so that
the photons from the gas jet and secondary
  
  125   Sat Mar 21 12:32:00 2020 LaszloGeneralEstimated target thickness Target thickness must be like 5mm (was measured
with a moving thin wire)
The beam thickness is small because of the
  
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
  
ELOG V3.1.5-fc6679b