287
|
Tue Feb 2 13:59:00 2021 |
Jan | Detectors | DSSD installation and alignment | 2021 | The DSSD has been exchanged and aligned in
November 2020. After bakeout at 140°C
|
|
28
|
Wed Nov 6 14:13:53 2019 |
Jan, Laszlo | Detectors | DSSSD - 1st movement - realignment | | We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion |
|
283
|
Fri Jun 5 14:06:15 2020 |
Laszlo | Detectors | DSSSD and SCRAPER position estimate for Xe and Te experiments | 2020 | We don't know the exact absolute positions
of the detector (+scraper) and the beam.
However, what we have to know is only these |
|
387
|
Sat May 22 16:28:10 2021 |
Laszlo | General | DSSSD movement | 2021 | The DSSSD is moved back to its measurement
position(-25mm). |
|
37
|
Tue Mar 10 08:52:34 2020 |
Jan | Detectors | DSSSD positioning | | To find a good Si position, we need to follow
a procedure similar to this:
|
|
106
|
Sat Mar 21 06:02:22 2020 |
Tino, Oliver | General | Detector filling | | Run stopped for detector fillings |
|
478
|
Wed May 26 20:34:50 2021 |
Ragan, Thanassis | Detectors | Detector filling | 2021 | Jan is filling the detector after run0137. |
|
29
|
Fri Nov 15 10:46:12 2019 |
Laszlo | Detectors | Detector movement from HKR | | To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
|
|
282
|
Tue May 19 16:48:15 2020 |
Laszlo | General | E127 beamtime overview | | Here is a representation how was the time
management during E127. The time, what we
could spend with measuring the 118Te(pg), |
|
249
|
Mon Mar 23 14:12:54 2020 |
Ragan | Runs | E127 experiment stops | | close file : run104 (14:12:44)
E127 experiment finishes on a successful
note )) Congratulations to the entire team |
|
569
|
Mon May 31 10:08:42 2021 |
Jan, Sophia | Runs | E127b runsheet | 2021 | |
|
208
|
Sun Mar 22 23:19:23 2020 |
Michael | General | ESR Vacuum readings | | |
|
226
|
Mon Mar 23 06:49:46 2020 |
Shahab | Runs | ESR kicker also has some problems | | |
|
438
|
Tue May 25 07:51:48 2021 |
Jan | Accelerator | ESR stacking cycle length | 2021 | The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
|
|
573
|
Wed Jun 23 12:29:35 2021 |
Jan, Sophia | Calibration | Efficiency of the x-ray Detectors | 2021 | For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed.
|
|
575
|
Thu Jul 8 13:39:34 2021 |
Jan | Calibration | Electron cooler parameters | 2021 | Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
|
|
215
|
Mon Mar 23 01:53:59 2020 |
Shahab | Runs | Empty shots in ESR | | since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
|
|
126
|
Sat Mar 21 12:42:21 2020 |
Ragan | General | Entry to ESR for MCP detector | | Pierre Michel and Laszlo go inside the ESR
for switching on the MCP detector so that
the photons from the gas jet and secondary |
|
125
|
Sat Mar 21 12:32:00 2020 |
Laszlo | General | Estimated target thickness | | Target thickness must be like 5mm (was measured
with a moving thin wire)
The beam thickness is small because of the |
|
496
|
Thu May 27 13:26:35 2021 |
Jan | Accelerator | FRS degrader failure | 2021 | Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
|
|