Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Authordown Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4;
 criocollimator.jpg 
  Draft   Thu Oct 24 14:55:28 2019 Toni                  
  Draft   Thu Oct 24 14:58:25 2019 Toni                  
  8   Wed Oct 9 07:55:47 2019 Pheleak checkAll metal gate valve (Bender)   08.10.2019DONEAccepted21.10.2019Customised24.10.2019Accepted24.10.2019M.BenderLeak check required by Markus Bender for a
"all metal gate valve".  The gate valve was
received on the 08.10.2019.  No deadline.
 All_metal_valve.jpg 
  9   Wed Oct 9 07:57:44 2019 Phetest with bakeoutCryring Detector Tube    09.10.2019DONEAccepted10.10.2019Setup 122.10.2019Accepted24.10.2019SpillmannDetector tube has been received from Grossmontage
(given to Andreas Kraemer).  This Detector
tube is for Cryring - measurement request
 20191008_094940.jpg 
  10   Wed Oct 9 08:01:51 2019 Phetest with bakeoutMacor Samples from Tino Giacomini   02.10.2019DONEAccepted10.10.2019Mobile 26.11.19Accepted8.11.19GiacominiMacor samples have been received from Tino
Giacomini on the 02.10.2019.  These Macor
samples will be used for IPM chamber.  The
  
  11   Wed Oct 9 14:19:09 2019 Phetest with bakeoutScrapper for ESR (for Markus Steck)   09.10.2019DONEAccepted14.10.2019Setup 218.10.2019Accepted24.10.2019SchwarzMeasurements asked as "urgent" for ESR. This
piece was already measured in 2014, and then
stored in an unkwon place.
 ESR-Scraper.jpg 
  20   Mon Nov 11 08:06:09 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator (Hackhalle)   unknownDONEAccepted11.11.2019; 10:15 am, stopped 12.11.2019Customised Refused  Broken gauge (cold cathode gauge).     
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/AWide range gauge is now installed on the chamber.
 The previous test with cold cathode gauge
failed due to broken gauge.  

Another
  
  22   Fri Nov 22 11:07:36 2019 Phetest without bakeoutBeam Diagnostic Chambers from India for HEBT - small one   unknownDONERefused09.01.2020Customised10.01.2020 - still pumpingAccepted15.01.20Mahr Rainer
Inside of the chamber is dirty (black mark
when wiped with tissue).

At the moment
(16.12.2019), the chamber is under cleaning.

Chamber
  
  23   Fri Nov 22 11:08:19 2019 Phetest with bakeoutSEM-Monitor for Beam Diagnostic SIS18   02.12.2019DONEAccepted03.12.2019Setup 213.12.2019Cond. Accep.06.01.2020Fiedler, Sebastian   foto.jpg 
  24   Fri Nov 22 11:09:19 2019 Phetest with bakeoutGrid for Beam Diagnostic SIS18   02.12.2019DONEAccepted03.12.2019Setup 113.12.2019Cond. Accep.06.01.2020Fiedler, Sebastian    
  25   Fri Nov 22 11:09:59 2019 PheOtherSeptum SIS100 - NEG coated chamberEnd 2019Delayed unknownTO COME           
  26   Fri Nov 22 11:10:33 2019 Phetest with bakeoutDipole Chambers for SIS100 (2box)25.11.19DelayedUnknown17.01.20DONEAccepted12.02.2020 End februarAccepted  All chambers are inserted with success into
the magnet. Leak check for: 07-6-013-3; 07-6-009-6;
07-6-011-9
  
  Draft   Fri Nov 22 11:11:00 2019 Phetest with bakeoutQuad Chambers for SIS100   unknownTO COME           
  28   Fri Nov 22 11:11:24 2019 Pheleak check4th batch of roughing CWT for SIS100   06.01.20DONEAccepted10.02.2020Customised13.03.20Accepted Stored in Weiterstadt07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9;
07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK
WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1;
  
  29   Fri Nov 22 11:11:56 2019 Phetest with bakeout'Spill-Cavitaet" ???August 2019DelayedKW26 TO COME           
  39   Mon Dec 16 15:27:50 2019 Phetest without bakeoutBeam Diagnostic from Inida - big one   13.13.2019 DONERefused15.01.20Customised19.01.20Accepted24.01.201M.Müller
The chamber has a dent.

At the moment
(16.12.2019), the chamber is under test for
mechanical acceptance.
  
  40   Tue Dec 17 13:39:20 2019 Pheleak checkFasersonde Unilac -2 test   17.12.2019DONENot Needed17.12.2019Customised17.12.2019Accepted20.12.2019Beam diagnosticThis phase probe was tested by Christian Kolligs
on the 12.12.2019 and it has leak rate of
1E-6 mbar.l/s.
 20191217_134243.jpg 
  41   Wed Dec 18 11:27:54 2019 Pheleak checkTransistion tube for SIS100 string testBeginning 2020DelayedFebruary06.02.2020DONERefused   Refused      