Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 9 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
4
Mon Sep 30 11:15:47 2019
Cristina
test with bakeout
Detector Recoil chamber ESR
2.09.2019
DONE
Accepted
9.09.2019
Customised
29.10.2019
Cond. Accep.
1.11.19
Hillenbrand
The chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
15
Mon Oct 21 10:24:59 2019
Cristina
Other
Tube Heidelberg
17.10.2019
DONE
Accepted
First Test: 24.10.2019; Second Test:30.01.20
Horizontal Coating Setup
29.10.2019: Refused; Second Test: 05.02.2020
Accepted
11.02.2020
C.Schröter
Tube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
37
Thu Dec 12 10:19:06 2019
Cristina
test with bakeout
Pumping chamber SIS100 -Stefan
End 2019
Delayed
Beginning2020
10.12.19
DONE
Accepted
January
Customised
05.02.2020
Accepted
Stored in the TH
88
Tue Sep 15 11:14:44 2020
Cristina
leak check
SIS100 Dipole chambers
on-going
July 2019
Customised
07-00006-001-0; 07-00006-002-7; 07-00006-003-4;
07-00006-004-1; 07-00006-005-8; 07-00006-006-5;
07-00006-007-2; 07-00006-009-6; 07-00006-010-2;
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All